Loading...
HomeMy WebLinkAboutTIS Waiver Request_2023.03.28 March 28, 2023 City of Bozeman Transportation and Engineering 20 East Olive Street P.O. Box 1230 Attn: Alicia Paz-Solis Re: Lot 5, Block 2, Glen Lake Commerce Subdivision T.I.S. Waiver Request Dear Alicia, This letter is in response to your request for a more conclusive narrative comparing peak value generation allotted during the Glen Lake Commerce Subdivision development and the projected peak value generation for the above-mentioned site development. We are asking for a waiver from the Traffic Impact Study requirement during the Site Plan process. The Lot 5, Block, Glen Lake Commerce Subdivision Site Plan proposes the development of a 3,220 SF warehouse, 715 SF retail/support space, and a 465 SF residential space along with associated site development. Below, Figure 1, are the generation rates for the proposed development. This information is based on the ITE Trip Generation Handbook – 9th Edition. Since the estimated traffic generation for this development is significantly less than 150 trips during the peak hours we are asking for the requirement of a letter/study for this development to be waived. Figure 1) ITE Trip Generation Handbook – 9th Edition It should also be noted that during the design and development of the Glen Lake Commerce Subdivision in 2016, Abelin Traffic Services conducted a traffic impact study, assuming a 50/50 split of the full built out properties being characterized as “Light-Industrial Park” and “Business Park”. Figure 2A-C below is a IMEG # 22007675 Page 2 of 4 snippet from the original subdivision report. The generation rates summarized in Figure 2C can also be shown calculated out in Figure 1 above, identified as “Allocated Overall”. Figure 2A) Abelin Traffic Services: Glen Lake Commerce Subdivision TIS, 2016, Page 4 snippet IMEG # 22007675 Page 3 of 4 Figure 2B) Abelin Traffic Services: Glen Lake Commerce Subdivision TIS, 2016, Page 5 snippet