Loading...
HomeMy WebLinkAbout042 A3.00 Exterior ElevationsLEVEL 1 100'-0" LEVEL 2 110'-9 1/8" 13 LEVEL 3 121'-6 1/4" LEVEL 4 132'-3 3/8" LEVEL 5 143'-0 1/2" ROOF 153'-9" 2456789101112131415 1 A4.02 1 A4.02 1 A4.03 1 A4.03 1 A4.04 1 A4.04 1 T.O. PARAPET 157'-9" /2 A3.00 /3 A3.00 COMPLIANT WITH HEIGHT BONUS FROM GRADE CHANGE53'-9"4'-0"LEVEL 1 100'-0" LEVEL 2 110'-9 1/8" LEVEL 3 121'-6 1/4" LEVEL 4 132'-3 3/8" LEVEL 5 143'-0 1/2" ROOF 153'-9" 9101112131415 1 A4.04 1 A4.0410'-9 1/8"10'-9 1/8"10'-9 1/8"10'-9 1/8"10'-8 1/2"4'-0"1 1 1 T.O. PARAPET 157'-9"57'-9"C C C C F B A B A B A B B A B A B A B A B F F F F C C C B A A CA C CA C CA C CCA C 135B 138B C C C C 101B137B D A E E C C C C C C C E A D D A D A D A D D D D D E A A A A A A A A A A E E E E A A A A A A A A E E E E C E E E AAAA AAAA AAAA AAAA AAAA D D D D D A A A A A E E D D D D D AA AA AA AA AA AA AA AA AA AA D E F F E EFFE E F F E E FFE E F F E E F F E EFFE E F F E E F F E EFFE A ? ? ? ? B ? ? ? ? B ? ? ? ? B B B B B D D D D ? ? ? ? B 136B A A A A B B A B A A B A A A A A A A A A E E A A T.O. FRMG. 157'-10 1/2" /3 A3.00 4COMPLIANT WITH HEIGHT BONUS FROM GRADE CHANGE53'-9"LEVEL 1 100'-0" LEVEL 2 110'-9 1/8" 13 LEVEL 3 121'-6 1/4" LEVEL 4 132'-3 3/8" LEVEL 5 143'-0 1/2" ROOF 153'-9" 245678 1 A4.02 1 A4.02 1 A4.03 1 A4.03 1 1 1 1 10'-9 1/8"10'-9 1/8"10'-9 1/8"10'-9 1/8"10'-8 1/2"4'-0"T.O. PARAPET 157'-9"57'-9"100A E FEF E FEF E FEF F F F F B BB BB CA B B C C C C AI B ? C C CC E E E C C E E A A AA A A AA A A A A A A A A A A A A A A A A D A D A D A D A D F E E F D ? ? ? ? B D B D B D B D C D 3 B B B A A A A A A A A A A 177A 178A 183A B B B B B C B B C A B BA A B A B A T.O. FRMG. 157'-9" /2 A3.00 4 SHEET NOTES -BUILDING ELEVATIONS PREFINISHED 24 GAUGE MIN METAL SIDING MODULAR BRICK VENEER EXTERIOR ELEVATIONS MATERIAL LEGEND A B C D E FIBER CEMENT PREFINISHED 24 GAUGE MIN METAL SIDING WOOD LOOK SIDING PREFINISHED 24 GAUGE MIN METAL SIDING FIBER CEMENT MODULAR BRICK VENEER WOOD LOOK SIDING A B CD SHEET NO.: TITLE: COPYRIGHT 2021 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DRAWN BY: CHECKED BY: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:NOT FOR CONSTRUCTION AHJ APPROVAL: HELENA P: 406-442-4933 BOZEMAN P: 406-219-2216 www.sma.design 3/10/2023 5:58:24 PMA3.00 22-045 2023-03-07 EXTERIOR ELEVATIONS Author Checker 1825 KAGY STUDENT HOUSING 22-045 1825 W KAGY BOULEVARD BOZEMAN, MT 59715 Reuter Walton Development SITE PLAN APPLICATION 1/16" = 1'-0"A3.00 1 NORTH BUILDING ELEVATION - OVERALL 1/8" = 1'-0"A3.00 2 NORTH BUILDING ELEVATION - QUADRANT B 1/8" = 1'-0"A3.00 3 NORTH BUILDING ELEVATION - QUADRANT A KEYNOTES - EXTERIOR ELEVATIONS 1 PREFINISHED METAL CAP FLASHING 2 GLASS RAILING 3 FUTURE BUILDING SIGNAGE 4 DECORATIVE BUILDING ART 5 GRADE TREATMENT WINDOW WELL - SEE CIVIL FOR EXHIBIT NO.DATE REVISION DESCRIPTION 23% FACADE TRANSPARENCY