Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
040 L2.2 Fifth Floor Roof Deck Irrigation Plan
HOT TUB DECKLEGEND IRRIGATION SCHEDULEXDXEngineering234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715406.586.0277 • tdhengineering.comBIM FILE PATH:SHEET NO.:TITLE:COPYRIGHT2022 SMA, P.C.REVISIONS:KEYMAP:ENGINEER SEAL:PROJECT:PROJECT LOCATION:PREPARED FOR:LOGO:CONSULTANT:PROJECT NUMBER:DRAWN BY:CHECKED BY:TEAM:PHASE:DATE:PROJECT NUMBER:Plot Date:22-0412/0/2022KBP12 KAGY STUDENT HOUSING22-0412 W KAGY BOULEVARDBO=EMAN, MT 9717/14/2021 11:13:21 AM SP1 SUBMITTALNo.DateReYLVLoQ DeVFULStLoQHELENAP: 406-442-4933BO=EMANP: 406-219-2216www.sma.designTD H PUoMeFt No. B22-02JCCL2.4A - 5TH FLOOR ROOFTOP DECK IRRIGATION PLAN IRRIGATION NOTES IRRIGATION TYPE L2.2TH FLOOR ROOF DECKIRRIGATION PLANK:\2022\B22-025 W Kagy Blvd Student Housing\CADD\LANDSCAPE\B22-025 L2.X.dwg, 12/8/2022 1:57:02 PM, KBP