HomeMy WebLinkAbout030 C5.4 Civil DetailsADVANCED DRAINAGE SYSTEMS, INC.MC-3500 ISOLATOR ROW DETAIL 1C5.44" INSPECTION PORT DETAIL 2C5.4END CAP INSERTION DETAIL 3C5.4INSERTA-TEE DETAIL 4C5.4MC-3500 TECHNICAL SPECIFICATIONS 5C5.4MC-3500 CROSS SECTION DETAIL 6C5.4INSERTA TEECONNECTIONCONVEYANCE PIPEMATERIAL MAY VARY(PVC, HDPE, ETC.)PLACE ADSPLUS WOVEN GEOTEXTILE(CENTERED ON INSERTA-TEE INLET) OVERBEDDING STONE FOR SCOUR PROTECTIONAT SIDE INLET CONNECTIONS. GEOTEXTILEMUST EXTEND 6" (150 mm) PAST CHAMBERFOOTINSERTA TEE TO BEINSTALLED, CENTEREDOVER CORRUGATIONSIDE VIEWSECTION A-AAADO NOT INSTALLINSERTA-TEE ATCHAMBER JOINTS(X)CHAMBERMAX DIAMETER OFINSERTA TEEHEIGHT FROM BASE OFCHAMBER (X)SC-3106" (150 mm)4" (100 mm)SC-74010" (250 mm)4" (100 mm)DC-78010" (250 mm)4" (100 mm)MC-350012" (300 mm)6" (150 mm)MC-450012" (300 mm)8" (200 mm)MC-720012" (300 mm)8" (200 mm)INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPSGASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRONNOTES:·PART NUMBERS WILL VARY BASED ON INLET PIPEMATERIALS. CONTACT STORMTECH FOR MOREINFORMATION.·CONTACT ADS ENGINEERING SERVICES IF INSERTA TEEINLET MUST BE RAISED AS NOT ALL INVERTS AREPOSSIBLE.PART #STUBBCMC3500IEPP06T6" (150 mm)33.21" (844 mm)---MC3500IEPP06B---0.66" (17 mm)MC3500IEPP08T8" (200 mm)31.16" (791 mm)---MC3500IEPP08B---0.81" (21 mm)MC3500IEPP10T10" (250 mm)29.04" (738 mm)---MC3500IEPP10B---0.93" (24 mm)MC3500IEPP12T12" (300 mm)26.36" (670 mm)---MC3500IEPP12B---1.35" (34 mm)MC3500IEPP15T15" (375 mm)23.39" (594 mm)---MC3500IEPP15B---1.50" (38 mm)MC3500IEPP18TC18" (450 mm)20.03" (509 mm)---MC3500IEPP18TWMC3500IEPP18BC---1.77" (45 mm)MC3500IEPP18BWMC3500IEPP24TC24" (600 mm)14.48" (368 mm)---MC3500IEPP24TWMC3500IEPP24BC---2.06" (52 mm)MC3500IEPP24BWMC3500IEPP30BC30" (750 mm)---2.75" (70 mm)NOMINAL CHAMBER SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH)77.0" X 45.0" X 86.0" (1956 mm X 1143 mm X 2184 mm)CHAMBER STORAGE109.9 CUBIC FEET (3.11 m³)MINIMUM INSTALLED STORAGE*175.0 CUBIC FEET (4.96 m³)WEIGHT134 lbs.(60.8 kg)NOMINAL END CAP SPECIFICATIONSSIZE (W X H X INSTALLED LENGTH)75.0" X 45.0" X 22.2" (1905 mm X 1143 mm X 564 mm)END CAP STORAGE14.9 CUBIC FEET (0.42 m³)MINIMUM INSTALLED STORAGE*45.1 CUBIC FEET (1.28 m³)WEIGHT49 lbs.(22.2 kg)*ASSUMES 12" (305 mm) STONE ABOVE, 9" (229 mm) STONE FOUNDATION, 6" (152 mm) STONEBETWEEN CHAMBERS, 6" (152 mm) STONE PERIMETER IN FRONT OF END CAPS AND 40% STONEPOROSITY.90.0" (2286 mm)ACTUAL LENGTH86.0" (2184 mm)INSTALLEDBUILD ROW IN THIS DIRECTIONNOTE: ALL DIMENSIONS ARE NOMINALLOWER JOINTCORRUGATIONWEBCRESTCRESTSTIFFENING RIBVALLEYSTIFFENING RIBBC75.0"(1905 mm)45.0"(1143 mm)25.7"(653 mm)FOOT77.0"(1956 mm)45.0"(1143 mm)PARTIAL CUT HOLES AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"PARTIAL CUT HOLES AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"END CAPS WITH A PREFABRICATED WELDED STUB END WITH "W"END CAPS WITH A WELDED CROWN PLATE END WITH "C"UPPER JOINT CORRUGATION22.2"(564 mm)INSTALLEDCUSTOM PARTIAL CUT INVERTS AREAVAILABLE UPON REQUEST.INVENTORIED MANIFOLDS INCLUDE12-24" (300-600 mm) SIZE ON SIZEAND 15-48" (375-1200 mm)ECCENTRIC MANIFOLDS. CUSTOMINVERT LOCATIONS ON THE MC-3500END CAP CUT IN THE FIELD ARE NOTRECOMMENDED FOR PIPE SIZESGREATER THAN 10" (250 mm). THEINVERT LOCATION IN COLUMN 'B'ARE THE HIGHEST POSSIBLE FORTHE PIPE SIZE.INSPECTION & MAINTENANCESTEP 1)INSPECT ISOLATOR ROW PLUS FOR SEDIMENTA.INSPECTION PORTS (IF PRESENT)A.1.REMOVE/OPEN LID ON NYLOPLAST INLINE DRAINA.2.REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLEDA.3.USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ONMAINTENANCE LOGA.4.LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS(OPTIONAL)A.5.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.B.ALL ISOLATOR PLUS ROWSB.1.REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUSB.2.USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPEi)MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRYii)FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLEB.3.IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.STEP 2)CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESSA.A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE ISPREFERREDB.APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEANC.VACUUM STRUCTURE SUMP AS REQUIREDSTEP 3)REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.STEP 4)INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.NOTES1.INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVALBASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.2.CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE ISNECESSARY.SUMP DEPTH TBD BYSITE DESIGN ENGINEER(24" [600 mm] MIN RECOMMENDED)24" (600 mm) HDPE ACCESS PIPE REQUIREDUSE FACTORY PARTIAL CUT END CAP PART #:MC3500IEPP24BC OR MC3500IEPP24BWONE LAYER OF ADSPLUS175 WOVEN GEOTEXTILE BETWEENFOUNDATION STONE AND CHAMBERS8.25' (2.51 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMSCATCH BASINOR MANHOLECOVER PIPE CONNECTION TO ENDCAP WITH ADS GEOSYNTHETICS 601TNON-WOVEN GEOTEXTILEMC-3500 CHAMBERMC-3500 END CAPOPTIONAL INSPECTION PORTSTORMTECH HIGHLY RECOMMENDSFLEXSTORM INSERTS IN ANY UPSTREAMSTRUCTURES WITH OPEN GRATESELEVATED BYPASS MANIFOLDINSTALL FLAMP ON 24" (600 mm) ACCESS PIPEPART #: MC350024RAMPNOTE:INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION VALLEY.STORMTECH CHAMBERCONCRETE COLLARPAVEMENT12" (300 mm) MIN WIDTHCONCRETE SLAB6" (150 mm) MIN THICKNESS8" NYLOPLAST INSPECTION PORTBODY (PART# 2708AG4IPKIT) ORTRAFFIC RATED BOX W/SOLIDLOCKING COVERCONCRETE COLLAR NOT REQUIREDFOR UNPAVED APPLICATIONS4" (100 mm)SDR 35 PIPE4" (100 mm) INSERTA TEETO BE CENTERED ONCORRUGATION VALLEYNOTES:1.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"CHAMBER CLASSIFICATION 45x76 DESIGNATION SS.2.MC-3500 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".3.THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATIONFOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS.4.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS.5.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS.·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 3”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 500 LBS/FT/%.AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS.8'(2.4 m)MAX12" (300 mm) MIN77" (1956 mm)12" (300 mm) MIN6"(150 mm) MIN6" (150 mm) MINPERIMETER STONE(SEE NOTE 4)EXCAVATION WALL(CAN BE SLOPED OR VERTICAL)MC-3500END CAPSUBGRADE SOILS(SEE NOTE 3)DEPTH OF STONE TO BE DETERMINEDBY SITE DESIGN ENGINEER 9" (230 mm) MINADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ALLAROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERSDCBA*TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVEDINSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR,INCREASE COVER TO 24" (600 mm).45"(1143 mm)18" (450 mm)MIN*ACCEPTABLE FILL MATERIALS: STORMTECH MC-3500 CHAMBER SYSTEMSPLEASE NOTE:1.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE".2.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 9" (230 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR.3.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FORCOMPACTION REQUIREMENTS.4.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION.MATERIAL LOCATIONDESCRIPTIONAASHTO MATERIALCLASSIFICATIONSCOMPACTION / DENSITY REQUIREMENTDFINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THETOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLEPAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THATPAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYERANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS.CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS.N/APREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVEDINSTALLATIONS MAY HAVE STRINGENT MATERIAL ANDPREPARATION REQUIREMENTS.CINITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THETOP OF THE EMBEDMENT STONE ('B' LAYER) TO 24" (600 mm)ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENTSUBBASE MAY BE A PART OF THE 'C' LAYER.GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES ORPROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THISLAYER.AASHTO M145¹A-1, A-2-4, A-3ORAASHTO M43¹3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10BEGIN COMPACTIONS AFTER 24" (600 mm) OF MATERIAL OVERTHE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN12" (300 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FORWELL GRADED MATERIAL AND 95% RELATIVE DENSITY FORPROCESSED AGGREGATE MATERIALS.BEMBEDMENT STONE: FILL SURROUNDING THE CHAMBERSFROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYERABOVE.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 4AFOUNDATION STONE: FILL BELOW CHAMBERS FROM THESUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER.CLEAN, CRUSHED, ANGULAR STONEAASHTO M43¹3, 4PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE.2,3NO COMPACTION REQUIRED.NOTE: MANIFOLD STUB MUST BE LAID HORIZONTALFOR A PROPER FIT IN END CAP OPENING.12" (300 mm)MIN SEPARATION12" (300 mm) MIN INSERTION12" (300 mm)MIN SEPARATION12" (300 mm)MIN INSERTIONMANIFOLD HEADERMANIFOLD STUBSTORMTECH END CAPMANIFOLD HEADERMANIFOLD STUBMC-3500 STORMTECH CHAMBER SPECIFICATIONS1.CHAMBERS SHALL BE STORMTECH MC-3500.2.CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIEDPOLYPROPYLENE COPOLYMERS.3.CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418, "STANDARD SPECIFICATION FORPOLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS" CHAMBER CLASSIFICATION45x76 DESIGNATION SS.4.CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNALSUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.5.THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATIONREQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGNSPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVELOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLEPRESENCES.6.CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED INACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTICCORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1)INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT(75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.7.REQUIREMENTS FOR HANDLING AND INSTALLATION:·TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVEINTEGRAL, INTERLOCKING STACKING LUGS.·TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINTSHALL NOT BE LESS THAN 3”.·TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESSCONSTANT SHALL BE GREATER THAN OR EQUAL TO 450 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATEDTEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD ORYELLOW COLORS.8.ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BYTHE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURALEVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:·THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.·THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THANOR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FORTHERMOPLASTIC PIPE.·THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENTDEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.9.CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF MC-3500 CHAMBER SYSTEM1.STORMTECH MC-3500 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED APRE-CONSTRUCTION MEETING WITH THE INSTALLERS.2.STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500CONSTRUCTION GUIDE".3.CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.STORMTECH RECOMMENDS 3 BACKFILL METHODS:·STONESHOOTER LOCATED OFF THE CHAMBER BED.·BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.·BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.4.THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.5.JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.6.MAINTAIN MINIMUM - SPACING BETWEEN THE CHAMBER ROWS.7.INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 mm) INTO CHAMBER END CAPS.8.EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43DESIGNATION OF #3 OR #4.9.STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROWSPACING.10.THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THESITE DESIGN ENGINEER.11.ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THESUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.NOTES FOR CONSTRUCTION EQUIPMENT1.STORMTECH MC-3500 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500CONSTRUCTION GUIDE".2.THE USE OF EQUIPMENT OVER MC-3500 CHAMBERS IS LIMITED:·NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.·NO RUBBER TIRED LOADER, DUMP TRUCK, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED INACCORDANCE WITH THE "STORMTECH MC-3500/MC-4500 CONSTRUCTION GUIDE".·WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH MC-3500/MC-4500 CONSTRUCTIONGUIDE".3.FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO CHAMBERS AND IS NOTAN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY USING THE "DUMP AND PUSH" METHOD ARE NOT COVEREDUNDER THE STORMTECH STANDARD WARRANTY.CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FORCONSTRUCTION EQUIPMENT.6" (150 mm)C5.4CIVIL DETAILSEngineering234 E. BABCOCK ST., SUITE 3 • BOZEMAN, MONTANA 59715406.586.0277 • tdhengineering.comBIM )ILE PATHSHEET NO.TITLECOPYRIGHT2022 SMA, P.C.REVISIONSKEYMAPENGINEER SEALPRO-ECTPRO-ECT LOCATIONPREPARED )ORLOGOCONSULTANTPRO-ECT NUMBERDRAWN BYCHECKED BYTEAMPHASEDATEPRO-ECT NUMBERPOot Date22-04512/12/2022C-C1825 KAGY STUDENT HOUSING22-0451825 W KAGY BOULEVARDBOZEMAN, MT 597157/14/2021 11121 AM SP1 SUBMITTALNo.DateRevision DescriptionHELENAP 40-442-49BOZEMANP 40-219-221www.sma.designTD&H Project No. B22-025