Loading...
HomeMy WebLinkAboutStorm Letter ENGINEERING    CONSULTING      PLANNING    DESIGN  204 N. 11th Ave.  BOZEMAN, MT  59715  406‐581‐3319  www.g‐e‐i.net 204 N. 11th Ave., Bozeman, MT 59715 Cell: (406) 581-3319 www.g-e-i.net Page 1 of 1 February 21, 2023    City of Bozeman, Planning   Site Plan Review Comments       Re: 22368 Enterprise Rental Addition SP   Stormwater Management Plan and Runoff Reduction       Genesis Engineering has completed a simple grading plan for the proposed modification to the  existing Enterprise Building.  As part of this process, we have also made a comparison of the of the  grassed or pervious area for the pre and post Enterprise Revision and have found that the revision,  as proposed, will convert 832 sqft of existing impervious aera into grassed and xeris‐scaped areas  that will allow for greater infiltration of stormwater and a reduction in the overall stormwater  runoff leaving the site.      The proposed building revision into an established, imperviously covered site will not have a  significant area of disturbed, erodible soil.  However, all best management practices regarding  erosion control will still be implemented through the standard SWPPP process.      The result of these above‐mentioned factors is that no stormwater impact associated with the  proposed revision will require any additional mitigation or storage.  Typical storm water  management practices for the site are listed on Civil Sheet C‐3.    If you have any questions or comments, please contact me at 581‐3319.    Sincerely,           __________________                                             Chris Wasia, P.E.                                                       Genesis Engineering, Inc.                                        www.g‐e‐i.net    Enclosures  cc:       H:\1134\008‐ENTEPRISE MOD\DOCS\DESIGN\STORM\Storm Letter‐022123.doc