Loading...
HomeMy WebLinkAbout021 A3.3 Exterior Elevations - NewFINISH FLOOR 0" PARAPET 17' -1 1/2" PARAPET 2 21' -1 1/2" A B DC METAL COPING CAP, PAINT WHITE METAL AWNING, SEE DETAIL 3/A8 METAL AWNING, DETAIL 4/A8 1 A6.3 EIFS (COLOR 1) 1 A6.2 STONE WAINSCOT AROUND BUILDING, MATCH EXISTING STONE FINISH FLOOR 0" PARAPET 17' -1 1/2" PARAPET 2 21' -1 1/2" 1 2 5 ZERO CUT OFF LED FIXTURE (SEE ELECTRICAL) EXISTING WINDOW & STEEL CHANNEL T.O. STOREFRONT 9' -0" 3 4 EXISTING EIFS (COLOR 1) EXISTING METAL AWNING 1/4" / 1'-0" EXISTING ROOF, BEYOND 6 7 8 EXISTING EIFS, PAINT TO MATCH COLOR 1 EIFS (COLOR 1) METAL AWNING, SEE DETAIL 4/A8 STONE WAINSCOT AROUND BUILDING, MATCH EXISTING STONE EXISTING BUILDING AREAADDITION BUILDING AREAROOF, BEYOND STEEL CHANNEL, SEE DETAIL 4/A8 2 A6.2 EXISTING BUILDING AREAADDITION BUILDING AREAEXISTING DOOR REPLACED W/ DOOR W/ LITE EXISTING WINDOW & STEEL CHANNEL 1/4" / 1'-0" EXISTING AREA WITH NO CHANGE =SHADED WHITE TRANSPARENCY NORTH FACADE TOTAL FACADE: 938 S.F. TRANSPARENT OPENINGS: 216 S.F. PERCENT TRANSPARENT: 23% EAST FACADE TOTAL FACADE: 1,987 S.F. TRANSPARENT OPENINGS: 279 S.F. PERCENT TRANSPARENT: 13% SOUTH FACADE TOTAL FACADE: 846 S.F. TRANSPARENT OPENINGS: 50 S.F. PERCENT TRANSPARENT: 6% WEST FACADE TOTAL FACADE: 1,798 S.F. TRANSPARENT OPENINGS: 215 S.F. PERCENT TRANSPARENT: 7% MIXED BLOCK FRONTAGE MIXED BLOCK FRONTAGEMIXED BLOCK FRONTAGEENTERPRISE RENTALADDITION4780 W BABCOCK ST, BOZEMAN, MONTANANO:DESCRIPTION:DATE:BY:PLOT SCALE: JOB NO: CHECKED BY: DRAWN BY: 2004-2023 JDS ARCHITECTS© 1/4" = 1'-0" 1COB REVISION04-27-23ASAS JDS 22-035 03/01/23 A3.3 EXTERIOR ELEVATIONS - NEW 1/4" = 1'-0"A3.3 1 SOUTH ELEVATION - NEW 1/4" = 1'-0"A3.3 2 WEST ELEVATION - NEW 1