HomeMy WebLinkAbout400 Precon Submittal Form (3) PRECONSTRUCTION MEETING CRITERIA CHECKLIST
PROJECT NAME: ROGFRT PI.AC'E
PROJECT TYPE: STREF,T, STORM, SEWER, AND WATER
(water,sanitary sewer,storm sewer,streets)
OWNER/DEVELOPER: COB
ENGINEER: KARL JOHNSON
CONTRACTOR: TBD
PRECONSTRUCTION MEETING SUBMITTALS CHECKLIST
All applicable materials must be submitted. Missing materials will deem the submittal inadequate. In
order to properly review the preconstruction submittal package and coordinate with other
departments, please submit at least ONE WEEK in advance of the meeting.
REQUIRED SUBMITTAL REQUIRED DATE COMMENTS
ACQUIRED
Approved Plans&Specifications:
• City of Bozeman(COB) X 3-10-2023
• Montana Department of Approval letters and hardcopies of
Environmental Quality X NOT ACQUIRED
(MDEQ) approved plans&specifications shall be
submitted.
• Montana Department of
Transportation(MDOT)
Dedicated Easements X EXISTING ROW A hardcopy of the recorded easement must
be submitted**
Abandoned Easements NA A hardcopy of the recorded easement must
be submitted**
Shop/Fabrication Drawings MODS Shop/Fabrication Drawings shall bear
Engineer's proval when submitted.
Traffic Control Plan NA Submit with Street Cut,Utility or
Encroachment Permit Application
Electronic Plans on Thumbdrive NA
(.dwg and.PDF)
Copy of Contractor's Bonds Bonds shall be in effect until 2 yrs after the
Payment Bond TBD
y TBD date of final completion and acceptance by
Performance Bond the City.
Submit with Street Cut,Utility or
Copy of Contractor's Insurance TBD
Encroachment Permit Application
PERMITS:
Dewatering Discharge Permit NA
Authorization(MDEQ) *
310 Permit/SP 124 Permit(Gallatin
Conservation District/Fish Wildlife NA
and Parks) *
404 Permit(Army Corps of
Engineers)* NA
Stormwater Pollution Prevention Plan
Confirmation Letter(COB/MDEQ*) NA
Street Cut Permit(COB/County) * NA
Utility Occupancy Permit NA
(MDOT/County)
NA
Encroachment Permit(COB)*
Flood Plain(COB) * NA
REQUESTED MEETING DATE: 3-11-2023
(Meeting will not be scheduled until all above applicable submittals are received.)
*Note: To be determined by design engineer.
**For public easements the review engineer may allow the pre-construction meeting to be scheduled if the executed
original easement has been scheduled for the City Commission's consent agenda but not recorded.