Loading...
HomeMy WebLinkAbout06-20-23 - Downtown Urban Renewal District Board - Agendas & Packet MaterialsA.Call meeting to order - 12:00 p.m. This meeting will be held both in-person and also using an online video conferencing system. You can join this meeting: Via Video Conference: Click the Register link, enter the required information, and click submit. Click Join Now to enter the meeting. Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in- person United States Toll +1 346 248 7799 Access code: 956 1935 4304 B.Disclosures C.Changes to the Agenda D.Public Service Announcements E.Approval of Minutes E.1 Approve April Board Meeting Minutes(Staley) F.Consent Agenda G.Public Comment This is the time to comment on any matter falling within the scope of the Downtown Urban Renewal District Board. There will also be time in conjunction with each agenda item for public comment relating to that item but you may only speak once per topic. THE DOWNTOWN AREA URBAN RENEWAL DISTRICT BOARD OF BOZEMAN, MONTANA DURD AGENDA Tuesday, June 20, 2023 General information about the Community Development Board is available in our Laserfiche repository. If you are interested in commenting in writing on items on the agenda please send an email to agenda@bozeman.net or visit the Public Comment Page prior to 12:00pm on the day of the meeting. Public comments will also be accepted in-person and through Video Conference during the appropriate agenda items. As always, the meeting will be streamed through the Commission's video page and available in the City on cable channel 190. For more information please contact Ellie Staley, ellie@downtownbozeman.org 1 Please note, the Board cannot take action on any item which does not appear on the agenda. All persons addressing the Board shall speak in a civil and courteous manner and members of the audience shall be respectful of others. Please state your name and place of residence in an audible tone of voice for the record and limit your comments to three minutes. H.Special Presentation I.Action Items I.1 Improvement Agreement for Utility Upgrades at 5th and Main.(Staley) J.FYI/Discussion J.1 Executive Director's June 2023 Report (Staley) J.2 Monthly Finance Report (Staley) K.Adjournment For more information please contact Ellie Staley, Downtown Bozeman Partnership, ellie@downtownbozeman.org This board generally meets the 3rd Tuesday of the month from 12:00 to 1:30pm Citizen Advisory Board meetings are open to all members of the public. If you have a disability and require assistance, please contact our ADA coordinator, Mike Gray at 406-582-3232 (TDD 406-582- 2301). In order for this Board to receive all relevant public comment in time for this meeting, please submit via the Commission Comment Page or by emailing agenda@bozeman.net no later than 12:00 PM on the day of the meeting. Public comment may be made in person at the meeting as well. 2 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director Downtown Bozeman Partnership SUBJECT:Approve April Board Meeting Minutes MEETING DATE:June 20, 2023 AGENDA ITEM TYPE:Minutes RECOMMENDATION:Approve STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:Board to review and approve April Board Meeting Minutes. UNRESOLVED ISSUES:None ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: URD Minutes 4-23.pdf Report compiled on: March 15, 2023 3 Downtown Urban Renewal District Board Meeting Minutes April 18, 2023 Attending: Cyndy Andrus, Bobby Bear, Suzi Berget White, Emily Cope, Aaron Parker, Tony Renslow, Ellie Staley, Jake Van Dusen Absent: Marley McKenna, Nick Zelver Minutes ACTION: Tony Renslow moved to approve the minutes from the March URD board meeting. Suzi Berget White seconded the motion. All voted in favor. Discussion Items Fiscal Year 2024 Work Plan and Budget Ellie presented the Fiscal Year 2024 budget and work plan, highlighting the Downtown Bozeman Partnership Management fee increase and parking funds. There were also noted formulas that were incorrect in the Excel spreadsheet that will be updated prior to submitting to the City Commission. Ellie provided an update on the grants offered and stated that we have received one grant application for the Residential Incentive Grant. One proposed project is the streetscape with the historic lamps along the North Willson corridor. ACTION: Suzi Berget White moved to reallocate funds in FY24 budget from the parking supply designated funds to side street infrastructure improvements of $300,000 Tony Renslow seconded the motion. All voted in favor. ACTION: Suzi Berget White moved to approve the FY24 budget as presented with the exception that the starting cash balance will be adjusted and will be reflected in the parking supply designated funds. Tony Renslow seconded the motion. All voted in favor. April 2023 Executive Director’s Report Ellie presented the April 2023 ED Report highlighting updates to downtown projects and programming. Meeting was adjourned at 1:20 pm 4 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director Downtown Bozeman Partnership SUBJECT:Improvement Agreement for Utility Upgrades at 5th and Main. MEETING DATE:June 20, 2023 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Discuss/Approve STRATEGIC PLAN:1.3 Public Agencies Collaboration: Foster successful collaboration with other public agencies and build on these successes. BACKGROUND: The proposed Sewer Replacement Improvement Agreement with Midtown, Downtown URD, City of Bozeman and Developer; includes a much-needed upgrade to a 100+ year-old sewer line spanning between the Downtown and Midtown URD districts for a large residential development on 5th and Main, in the Downtown URD district. This is the same project who has also been awarded with a DURD Residential Incentive Grant with 121 units, including 85 studios and one-bedrooms. The project details and breakdown of costs are attached and detailed below… City Sewer Fund $500,000 Midtown URD: $464,000 (58% property area) paid at CoO for the “Development” Downtown URD: $336,000 (42% property area) paid at CoO for the “Development” Developer: Costs over $1.3M to be reimbursed Engineering has provided us with two separate “Improvements Agreements” one for TIF funds and one for the City Sewer funds and between the entities above, that the developer would use when their money is going in. 5 The Downtown URD does have current funds in FY24 allocated to Utility Improvements and Downtown Improvement Plan General Implementation. Utility Improvements are also a top priority outlined in the 2019 Downtown Bozeman Improvement Plan. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: Sewer Upgrade TIF District Split.pdf 2023-06-20 Downtown TIF Project Overview.pdf Report compiled on: April 12, 2023 6 Miles 0.1 2,257 This product is for informational purposes and may not have been prepared for, or be suitable for legal,engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information. Feet 2630 Legend 131 Location 263 05/09/2023 Created By: Created For: Date: Title Manholes Abandoned Mains Force Mains Gravity Mains Street Names Northeast Neighborhood Urban Renewal District Midtown Urban Renewal District North Park Urban Renewal District Downtown Tax Increment District South Bozeman Technology District Pole Yard Urban Renewal District City Limits Proposed Sewer Upgrade TIF District Boundary Midtown District Downtown District 5th & Mendenhall Sewer Upgrades - Adjacent Midtown Tax Increment District Properties 7 Miles 0.1 2,257 This product is for informational purposes and may not have been prepared for, or be suitable for legal,engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information. Feet 2630 Legend 131 Location 263 05/09/2023 Created By: Created For: Date: Title Manholes Abandoned Mains Force Mains Gravity Mains Street Names Northeast Neighborhood Urban Renewal District Midtown Urban Renewal District North Park Urban Renewal District Downtown Tax Increment District South Bozeman Technology District Pole Yard Urban Renewal District City Limits Proposed Sewer Upgrade TIF District Boundary Midtown District Downtown District South 1/2 of this parcel only 5th & Mendenhall Sewer Upgrades - Adjacent Downtown Tax Increment District Properties 8 5th & Mendenhall Sewer Upgrades - Adjacent Properties (Midtown District): Tax ID Geocode Site Address Legal Description Parcel Size (Ac.) 00RGG66936 6079812112520000 TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK E, Lot 1 - 9, PLUS E2 LOT 10 AND ALL LOTS 40-46 AND VAC ALL 1.58 000RGG6284 6079812112600000 502 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK E, Lot 47 & 48 0.18 000RGG1313 6079812120180000 421 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 20 & 21 0.18 000RGG3530 6079812120160000 417 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 18 & 19 0.18 000RGG6545 6079812120140000 411 W MENDENHALL ST STE 3 TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 16 & 17 0.18 000RGG2540 6079812120120000 407 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 14 & 15 0.18 000RGG5011 6079812120110000 403 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 12 & 13 0.18 000RGG4871 6079812120100000 321 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 10 & 11 0.18 000RGG5576 6079812120080000 317 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 8,9, & W20' LOT 7 0.24 000RGG4015 6079812120050000 309 & 313 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 4 - 6, & E8' LOT 7 0.30 000RGG5273 6079812120030000 303 W MENDENHALL ST TRACYS 2ND ADD, S12, T02 S, R05 E, BLOCK D, Lot 1 - 3 0.27 000RGG1504 6079812113330000 322 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 32 & 33, PLAT A-8 0.18 000RGG4055 6079812113310000 404 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 30 & 31 0.18 000RGG6542 6079812113290000 408 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 28 & 29 0.18 000RGG3256 6079812113250900 TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 27, & 17' E S LOT 26 0.15 000RGG2158 6079812113250000 416 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 25, & E2 LOT 24 & W11' LOT 26 0.17 000RGG4478 6079812113230000 420 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 22,23, & W2 LOT 24 0.23 Total =4.74 Acres 5th & Mendenhall Sewer Upgrades - Adjacent Properties (Downtown District): Tax ID Geocode Site Address Legal Description Parcel Size (Ac.) 000RGG3506 6079812113200000 421 W MAIN ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 18 - 21 0.36 000RGG1209 6079812113170000 411 W MAIN ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 16 & 17 0.18 000RGG3255 6079812113150000 407 W MAIN ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 14 & 15 0.18 00RGG33747 6079812113350000 318 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 34, & N110' LOT 35 0.19 00RGG33747 6079812113370000 314 W MENDENHALL ST TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, N110' LOT 36 & N110' OF W20' LOT 37 0.19 00RGG33747 6079812113400000 TRACYS 1ST ADD, S12, T02 S, R05 E, BLOCK D, Lot 38 - 42 0.50 000RGH2838 6079907208220000 220 W MENDENHALL ST TRACYS 1ST ADD, S07, T02 S, R06 E, BLOCK C, Lot 11 - 14 0.36 000RGH4417 6079907208180000 TRACYS 1ST ADD, S07, T02 S, R06 E, BLOCK C, Lot 15 - 17, & W2 LOT 18 0.32 000RGH3474 6079907208140000 35 N GRAND AVE TRACYS 1ST ADD, S07, T02 S, R06 E, BLOCK C, Lot 19,20, & E2 LOT 18 0.23 000RGH2434 6079907215100000 103 N GRAND AVE TRACYS 2ND ADD, S07, T02 S, R06 E, BLOCK C, 65' S ENDS OF LOTS 1-3 0.13 MARTFINCEN 6079907215017000 215 W MENDENHALL ST MARTEL FINANCIAL CENTER CONDO, S07, T02 S, R06 E, TRACY'S 2ND-N. 75' LOTS 1, 2 & 3 ALL LOTS 4-17 & S 0.83 South 1/2 Only Total =3.47 Acres 9 5th and Main | Project Overview April 27, 2023 10 UP UP xx00..11 xx00..11 xx00 xx00 AA AA 2 A4.00 2 A4.00 A3.00 1 A3.01 2 A3.011 EE EE 140'-2"xx77 xx77 7'-0" 2 A4.01 2 A4.01 1 A4.00 1 A4.00 1 A4.02 1 A4.02 xxbb xxbb xxcc xxcc xxdd xxdd xxee xxee xx11 xx11 xx22 xx22 xx33 xx33 xx44 xx44 xx55 xx55 xx66 xx66 PPRROOPPEERRTTYY LLIINNEE A3.00 2 119A 120B135B 112A 001A 121Axxaa xxaa 121'-6"PARKING135 AE AEAF6'-3" M.O. 12'-0" 1'-4" STAIRS100 PACKAGE111 MAIL110 2'-1" M.O. 3'-4"21'-4"7'-0"2'-3"14'-3"13'-2"125'-10"13'-4"7" AA RESTROOM113 A7.01 111AS100A S100B119B iAC W.R./ELC.119 TRASH120 STAIRS101 ELEV. LOBBY122 TRASH 121 S101A HALLWAY 112ELEV.E100 /1A2.10LOBBY/ENTRY126 126B BB BB A8.00 2 eeC6B41 eeNYN03 eeC6M40 iiN8003 iiC6C11 iiC6C11 iiC6C11 iiC6C11 iiC6C11 eeC6M40 iiS2B12 iiS2B12 iiS2B12 iiS2B12 COMPACT COMPACT COMPACT 812 213 13 12 COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT16'-8"118A A8.02 2 iiNY003 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 1 /1A2.10ELEV.E101 FRR119A eeC6A00 eeC6A00 iiC6A00 AA eeC6M40 iiS2B12 iiS2B12 iiN8003 iiN8003 iiC4H13 iiC4H13iiN8003 xx1177 xx1177 4' CONC. WALL BELOW, TYP. AT WALLS ADJACENT TO PARKING GARAGE 4' CONC. WALL BELOW, TYP. AT WALLS ADJACENT TO PARKING GARAGE 23 eeNYN03 iiM8B02 iiM8B02 4' WALL BELOW, TYP. AT WALLS ADJACENT TO PARKING GARAGE SHAFT iiC6C11 iiN8003 AG 123A/1A2.1120'-0"16'-0"28'-6"28'-6"28'-6"28'-6"28'-6"27'-2"10'-4"1'-8"16'-0"29'-0"29'-0"30'-0"13'-4"20'-2"eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B40 eeC6B402'-0"A 135°45°eeC6B40 AF AF 117'-2"85'-4" AF eeC6B41 FITNESS109 LEASING OFFICE102 AA 114A AD VESTIBULE100 TV LOUNGE127FIREPLACELOUNGE134 iAB iAA CONFERENCE107 RESTROOM114 RESTROOM115 VESTIBULE125iAG AF 115A iiM8B02 iiM8B02 109A116APET WASH117COMPACTCOMPACT 2323232323 COMPACTAM 12 32 32 AN 126A iAE109BPELATON ROOM109A 125B RETAIL 123 PARKING001A eeC6B40 113A eeC6B40 6'-8"A8.04 1 iiNY003 122AiiC6C11iiNY003 iiC4H13 iiC6C11 110A 2'-0"125C 123B AC AC 98'-8" 100'-0" 100'-0" 100'-0" 100'-0" 100'-0" 23 1 4 4 iiM8B02 iiM8B02 102A100B100AeeC6B40 eeC6B40eeC6B40 eeC6B40 eeC6B40 eeC6B40 iiC6C11 iiC6C11 iiC6C11 iiNY003 eeC6B40 eeC6B40 UP 98'-8" iiC6B40 6'-9 1/2"AP 9'-1"6'-3 1/2" 15'-4 1/2"16'-2"16'-9 1/2"8'-8 1/2"3'-0 1/2"3'-2 1/2"2'-3"M.O.9'-4"8"M.O.8'-0"3'-4"M.O.6'-0"10'-8"M.O.3'-4"3'-4"M.O.8'-0"8"M.O.9'-4"3'-4"M.O.14'-0"3'-4"M.O.6'-0"1'-4"M.O.9'-4"2'-8"M.O.3'-4"2'-0"M.O.8'-0"3'-4"AP S101B18'-8"7'-7"18'-9 1/2"6'-5"33 3'-7 1/2" 99'-5 5/8" iAF 24'-0" 1'-4 1/2" iiC6C11 iiC6C11 iiC6C11 BIKE STORAGE118 iiC6C11 1 1 13'-5 1/2"6'-3"6'-0 1/2" iiC6C1116'-5 1/2"25'-1 1/2" AQ iAD 19'-7"107AAR AR AR AR AR AR AR 1 A4.01 1 A4.01 4 A4.02 4 A4.02 iiC6C11 100'-0"/1A2.11AR 3'-2" M.O. 7'-4"1'-4" M.O. 9'-4"2'-8" M.O. 9'-4"5'-4" M.O. 9'-4"5'-4" M.O. 3'-4"2'-8" M.O. 9'-4"2'-8" M.O. 6'-0"2'-8" M.O. 9'-4"2'-8" M.O. 6'-0"2'-8" M.O. 9'-4"2'-8" M.O. 3'-4"1'-4"3'-4" M.O. 9'-4"4'-0" M.O. 6'-0"3'-4"8" M.O. 9'-4"8"3'-4" M.O. 6'-0"4'-0" M.O. 6'-0"3'-4" M.O. 9'-4"3'-4" M.O. 12'-0"1'-4" AS AA 222 2 2 2 2 eeC6M40 125'-10" 216'-0" 12'-10" eeC6M40 eeC6M40 eeC6M40 98'-8"98'-0" GRAVEL COURSE FINISH, SLAB ON GRADE BY FUTURE TENANT IMPROVEMENT EQEQ15 22 22 22 22 A7.01 20 26 A7.01 17 18 7 19 22 1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OFCONCRETE, FACE OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONSWILL BE +1/2" FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.3. SEE SHEET A1.11 FOR WALL TYPE DESIGNATIONS.4. FURNITURE SHOWN FOR REFERENCE ONLY, NOT PART OF THE CONSTRUCTIONCONTRACT.5. ALL LEVEL 6 UNITS WITH THE LABEL "PH" ARE DESIGNATED PENT HOUSE UNITS, SEE PENT HOUSE UNIT LEGEND FOR UNIT TREATMENT DIFFERING FROM TYPICAL UNIT TYPES. 6. PARKING SPACE NUMBERS TO BE LOCATED ON THE WALL CENTERED ON EACH PARKING SPACE, PARKING SPACE NUMBERS TO BE PAINTED ON FLOOR WHERE NOT ADJACENT TO A WALL7. NORTH ORIENTATION VARIES THROUGHOUT PLANS, SEE OVERALL FLOOR PLANS. SHEET NOTES -FLOOR PLAN SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DDRRAAWWNN BBYY::CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:AHJ APPROVAL: THIS SHEET IS INTENDED TO BE PRINTED IN COLOR HHEELLEENNAAP: 406-442-4933 BBOOZZEEMMAANNP: 406-219-2216 www.sma.design 5/12/2023 7:35:14 PMA2.01 22114455 22002233--0055--0088 FFLLOOOORR PPLLAANN --LLEEVVEELL 11 LECF 55tthh && MMAAIINN RREESSIIDDEENNCCEESS 22114455 442211 WW.. MMAAIINN SSTTRREEEETTBBOOZZEEMMAANN,, MMTT 5599771155 RREEUUTTEERR WWAALLTTOONN PPEERRMMIITT SSEETT 1/8" = 1'-0"A2.0111 LEVEL 1 FLOOR PLAN N WESTWEST SOUTHSOUTH KEYNOTES - FLOOR PLAN 1 DERO ULTRA SPACE SAVER, WALL MOUNTED BIKE STORAGE RACK, OR APPROVED EQUAL.PROVIDE ADDITIONAL BLOCKING AS REQ'D. 2 FLOOR DRAIN, SEE PLUMB3 HVAC SHAFT, SEE MECH 4 STAINLESS STEEL WASH TUB WITH OPERABLE DOOR AND RAMP - SEE PLUMBING5 JULIET BALCONY - SEE DETAILS 6 MOVEABLE LAMINATE SHELVING7 NOT USED 8 ALUMINUM FRAMED FULL WALL MIRROR9 CASEWORK - BOOTH SEATING AND TABLE 10 GAS FIREPLACE INSERT - SEE ELECTRICAL11 75" FLAT SCREEN TV, CENTER AT 66" A.F.F. - OWNER FURNISHED, CONTRACTOR INSTALLED 12 FINISHES SURFACE TO PLANE OUT, COORDINATE WITH WALL FRAMING13 8" X 8" WOOD BEAM ACCENT FRAME14 WATER BOTTLE FILLER - SEE PLUMBING 15 BIKE FIX STATION16 CASEWORK - LEASING DESK/OFFICE 17 METAL ACCENT PANEL18 RECESSED BUILT-IN LAMINATE SHELVES 19 WRAP STRUCTURAL COLUMN IN GYP20 FITNESS EQUIPMENT - OWNER FURNISHED, OWNER INSTALLED 21 BALCONY W/ GUARDRAIL22 FLOOR DRAIN - SEE PLUMBING 23 DERO BIKE WALL RACK - CENTERED WITHIN PARKING SPACE, MOUNT 70" A.F.F.24 MOP SINK - SEE PLUMBING 25 MECHANICAL LOUVER26 CLEANOUT - SEE MEP 27 BUILT IN ISLANDS - SEE TYP. ELEVATIONS & DETAILS28 EMERGENCY BARRICADE TO SWING IN THE DIRECTION OF EGRESS 30 CANOPY BELOW, PER STOREFRONT BLOCK FRONTAGE REQUIREMENTS31 FLOOR DRAIN - SEE PLUMBING32 EV CHARGING STATION, SEE ELEC. 33 WRAP STRUCTURAL COLUMN IN BRICK - SEE ELEVATIONS FOR LAYOUT NNOO..DDAATTEE RREEVVIISSIIOONN DDEESSCCRRIIPPTTIIOONN 11 W D WD WD W D DN UP AA AA 2 A4.00 2 A4.00 4 A4.02 4 A4.02 A3.00 1 A3.01 2 A3.011 55 55 EE EE 44 44 22..11 22..11 22..22 22..22 33 33 55..11 55..11 66 66 41'-5"19'-0"42'-8 1/2"36'-1"DD..11 DD..11 DD DD CC CC 2 A4.01 2 A4.01 1 A4.00 1 A4.00 1 A4.02 1 A4.02 A3.00 2 A3.02 1A3.022 31'-8"38'-4" 19'-0 1/2"19'-0 1/2"19'-0"24'-0 1/2"24'-0"38'-0"32'-4"39'-8 1/2"19'-0"19'-0"19'-0 1/2"19'-0"23'-6"11 1/2"139'-2"139'-2"202-R20201-R20C201A 205-R20211-R20204-R20208-R20220-R20218-R20 230-R20240-R20C206A 215-R20 C209A S201A 36'-5 1/2"12'-2" 34'-8"35'-4 1/2"3 1/2"14'-6 1/2"19'-0"5'-8"30'-0"13'-2"18'-6"14'-10"23'-6" 70'-0"67'-0"70'-0" 24'-4"19'-0 1/2"23'-8"11'-7"5'-4"8'-8"5'-2"13'-3"7'-2"12'-0"6'-0"7'-5 1/2"24'-1"37'-8"eeW6W22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6W22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 231-R20233-R208'-1"6'-6"9'-8"11'-6"5'-8 1/2"5'-3 1/2"7'-3"6'-5 1/2"7'-6"6'-9"6'-9"3'-5"10'-5 1/2"M.O.6'-0"1'-10 1/2"6'-1"10'-0"14'-0"6'-0"6'-0"11'-0"12'-0"5'-8"6'-4 1/2"12'-0"10'-9 1/2"6'-2 1/2"6'-2"6'-2 1/2"2'-2"6'-4"7'-4"5'-4"3'-2 1/2"2'-5 1/2"10'-0"14'-0"6'-0"5'-0"4'-6"8'-6"6'-4"4'-6 1/2"7'-6"7'-0"5'-8"8'-1"4'-11 1/2"5'-0"4'-0"8'-8"9'-10"11'-6"5'-8 1/2"5'-3 1/2"7'-3"6'-5 1/2"7'-1 1/2"7'-4"4'-6 1/2"5'-4"7'-3"6'-5 1/2"5'-3 1/2"7'-3"6'-5 1/2"5'-0"5'-9"6'-9"6'-0"6'-0"8'-0"7'-0"6'-0"4'-8"5'-4"7'-5"6'-3 1/2"7'-2"7'-4"4'-6 1/2"5'-3 1/2"7'-3"6'-5 1/2"4'-10"5'-8"7'-10"5'-8 1/2"6'-4"7'-10"6'-2"3'-8 1/2"5'-3 1/2"7'-3"13'-7"7'-4"4'-6 1/2"5'-4"12'-0"9'-0"6'-0" 32'-0"6'-0"32'-0"67'-0"6'-0"32'-0" 212-R20 214-R20 216-R20 222-R20 224-R20 232-R20234-R20236-R20213-R20 203-R20238-R2011 11 H J E E J H D J C C C E E H E J D E C C C C C C D C ECCCCCCCCC C D F D CCE E5'-0"A7.00 19 STAIRS200 STAIRS201 JANITORC203 DATA/ITC204 ELEV.E200 ELEV. E201S200ANORTHCORRIDORC205 WEST CORRIDORC202 EAST CORRIDORC214 EXIT CORRIDORC206 CORRIDORC201212-R01214-R01216-R01218-R01220-R01222-R01224-R01230-R01 232-R01 234-R01 236-R01 231-R01 233-R01 238-R01 240-R01201-R01202-R01 203-R01 204-R01 205-R01 206-R01 208-R01 206-R20215-R01213-R01211-R01C E BB BB RESTROOM C209 A8.00 3 eeW6M22 eeW6M22 eeW6M22 eeW6B22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 FA-2 eeW6W22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 eeW6M22eeW6M22eeW6M22 eeW6F32 eeW6M22 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6E11 iiW6C12 iiW6C12 iiW6E11iiW6J12 iiW6C12 iiW6G11 iiW6G11 iiY8D11 iiY8F11 iiW6G11 iiC6A00 iiW6A01 iiY8A11 iiY8A11 iiY8A11 iiW6E11iiW6G11 iiY8D11 iiY8A11 iiW6G11iiW6G11 iiY8A11 iiW6A00 iiW6C12iiS2B12 iiW6G11 iiY8D11 iiY8D11 iiW6G11 iiW6E11iiW6E11 iiW6C12 iiW6C12 iiW6C12 iiW4L12 iiW6G11 iiW6G11 iiY8A11 iiW6G11 iiY8D11 iiY8D11 iiY8A11 iiY8D11 iiY8A11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8A11 iiY8D11 iiY8D11 iiY8F11 iiY8D11 iiY8D11 iiW6G11 1 A4.01 1 A4.01 A8.02 3 iiS2B12 iiS2B12 E202AE. LOBBYE202 A7.03 1 SKI LOCKERSC210 24 /1 A7.22A /1A7.25A /1 A7.10 /1A7.10 /1A7.10 /1 A7.10 /1 A7.10 /1A7.10 /1 A7.10 /1A7.10 /1A7.10 /1A7.10 /1 A7.12 /1A7.12 /1 A7.12 /1 A7.12/1 A7.10 /1A7.14 /1 A7.26A /1 A7.19A /1A7.23A /1 A7.20A /1 A7.18 /1 A7.16 /1A7.11 iiW6G11 iiL4A00 iiL4A00 iiW4A01 iiW4A01 iiW4A01 iiN8003 6'-10"11'-2"8'-0"12'-0"14'-0"11'-0"7'-0" 25 25 25 25 25 25 25 25 25 25 25 25 25 E C210A 30 30 30DNSHAFT iiW6L12 iiW6C12 /1A2.12/1A2.12/1A2.14/1A2.14/1A2.13/1A2.13/1A2.13/1A2.1332'-0"6'-0"49'-0"20'-2"iAH UNIT A-2 238 UNIT C-6201 UNIT C-3202 UNIT A-1203 UNIT B-1204 UNIT B-3205 UNIT A-1 206 UNIT C-7 208 UNIT A-1 212 UNIT A-1 214 UNIT A-1 216 UNIT B-1 218 UNIT B-1 220 UNIT A-1222 UNIT A-1224 UNIT C-4230 UNIT A-1 232 UNIT A-1234 UNIT A-1236 UNIT B-4 240 UNIT B-5 233 UNIT C-1TYPE A231 UNIT B-1215UNIT A-1213UNIT C-1211 M C204A C203A eeW6W22 eeW6M22 eeW6W22 eeW6M22 TRASHC211SHAFT SHAFTSHAFT 3030 iiW6A01 RESTROOMC208C208A UP32'-0"25 iiS2B12 iiS2B12 iiS2B12 A2.37 1 A2.37 2 iiW6C12 iiW6C12 C211A FA-2 1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OFCONCRETE, FACE OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONSWILL BE +1/2" FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.3. SEE SHEET A1.11 FOR WALL TYPE DESIGNATIONS.4. FURNITURE SHOWN FOR REFERENCE ONLY, NOT PART OF THE CONSTRUCTIONCONTRACT.5. ALL LEVEL 6 UNITS WITH THE LABEL "PH" ARE DESIGNATED PENT HOUSE UNITS, SEE PENT HOUSE UNIT LEGEND FOR UNIT TREATMENT DIFFERING FROM TYPICAL UNIT TYPES. 6. PARKING SPACE NUMBERS TO BE LOCATED ON THE WALL CENTERED ON EACH PARKING SPACE, PARKING SPACE NUMBERS TO BE PAINTED ON FLOOR WHERE NOT ADJACENT TO A WALL7. NORTH ORIENTATION VARIES THROUGHOUT PLANS, SEE OVERALL FLOOR PLANS. SHEET NOTES -FLOOR PLAN SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DDRRAAWWNN BBYY::CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:AHJ APPROVAL: THIS SHEET IS INTENDED TO BE PRINTED IN COLOR HHEELLEENNAAP: 406-442-4933 BBOOZZEEMMAANNP: 406-219-2216 www.sma.design 5/12/2023 7:35:31 PMA2.02 22114455 22002233--0055--0088 FFLLOOOORR PPLLAANN --LLEEVVEELL 22 LECF 55tthh && MMAAIINN RREESSIIDDEENNCCEESS 22114455 442211 WW.. MMAAIINN SSTTRREEEETTBBOOZZEEMMAANN,, MMTT 5599771155 RREEUUTTEERR WWAALLTTOONN PPEERRMMIITT SSEETT 1/8" = 1'-0"A2.0211 LEVEL 2 FLOOR PLAN WEST EASTCENTER N KEYNOTES - FLOOR PLAN 1 DERO ULTRA SPACE SAVER, WALL MOUNTED BIKE STORAGE RACK, OR APPROVED EQUAL.PROVIDE ADDITIONAL BLOCKING AS REQ'D. 2 FLOOR DRAIN, SEE PLUMB 3 HVAC SHAFT, SEE MECH4 STAINLESS STEEL WASH TUB WITH OPERABLE DOOR AND RAMP - SEE PLUMBING 5 JULIET BALCONY - SEE DETAILS 6 MOVEABLE LAMINATE SHELVING7 NOT USED8 ALUMINUM FRAMED FULL WALL MIRROR 9 CASEWORK - BOOTH SEATING AND TABLE 10 GAS FIREPLACE INSERT - SEE ELECTRICAL11 75" FLAT SCREEN TV, CENTER AT 66" A.F.F. - OWNER FURNISHED, CONTRACTOR INSTALLED12 FINISHES SURFACE TO PLANE OUT, COORDINATE WITH WALL FRAMING 13 8" X 8" WOOD BEAM ACCENT FRAME 14 WATER BOTTLE FILLER - SEE PLUMBING15 BIKE FIX STATION 16 CASEWORK - LEASING DESK/OFFICE 17 METAL ACCENT PANEL18 RECESSED BUILT-IN LAMINATE SHELVES19 WRAP STRUCTURAL COLUMN IN GYP 20 FITNESS EQUIPMENT - OWNER FURNISHED, OWNER INSTALLED 21 BALCONY W/ GUARDRAIL22 FLOOR DRAIN - SEE PLUMBING23 DERO BIKE WALL RACK - CENTERED WITHIN PARKING SPACE, MOUNT 70" A.F.F. 24 MOP SINK - SEE PLUMBING 25 MECHANICAL LOUVER26 CLEANOUT - SEE MEP 27 BUILT IN ISLANDS - SEE TYP. ELEVATIONS & DETAILS 28 EMERGENCY BARRICADE TO SWING IN THE DIRECTION OF EGRESS30 CANOPY BELOW, PER STOREFRONT BLOCK FRONTAGE REQUIREMENTS31 FLOOR DRAIN - SEE PLUMBING 32 EV CHARGING STATION, SEE ELEC. 33 WRAP STRUCTURAL COLUMN IN BRICK - SEE ELEVATIONS FOR LAYOUT NNOO..DDAATTEE RREEVVIISSIIOONN DDEESSCCRRIIPPTTIIOONN 12 WW D W D W D WD WD UPUP AA AA 2 A4.00 2 A4.00 4 A4.02 4 A4.02 A3.00 1 A3.01 2 A3.011 55 55 EE EE 44 44 22..11 22..11 22..22 22..22 33 33 55..11 55..11 66 66 DD..11 DD..11 DD DD CC CC 2 A4.01 2 A4.01 1 A4.00 1 A4.00 1 A4.02 1 A4.02 A3.00 2 A3.02 1A3.022 5'-4"7'-5"6'-3 1/2"7'-2"7'-4"4'-6 1/2"5'-3 1/2"7'-3"6'-5 1/2"4'-10"5'-8"7'-10"5'-8 1/2"6'-4"7'-10"6'-2"3'-8 1/2"5'-3 1/2"7'-3"13'-7"7'-4"4'-6 1/2"5'-4"12'-0"9'-0"6'-0" 31'-8"19'-0 1/2"19'-0 1/2"19'-0"24'-0 1/2"24'-0"38'-0"32'-4"5'-0"3'-1"6'-6"9'-8"11'-6"5'-8 1/2"5'-3 1/2"7'-3"6'-5 1/2"7'-7"6'-8"6'-9"3'-5"10'-5 1/2"M.O.6'-0"1'-10 1/2"6'-1"10'-0"14'-0"6'-0"41'-5"19'-0"24'-5"18'-3 1/2"36'-1"139'-2"6'-0"11'-0"5'-11 1/2"6'-0 1/2"5'-8"6'-4 1/2"6'-2"5'-10 1/2"10'-9 1/2"6'-2 1/2" 34'-8"35'-4 1/2"24'-4"19'-0 1/2"23'-8"31'-8"38'-4" 70'-0"67'-0"70'-0" 5'-0"4'-6"8'-6"6'-4"4'-6 1/2"7'-6"7'-0"5'-8"8'-7"4'-5 1/2"5'-0"6'-2"6'-2 1/2"2'-2"6'-4"7'-4"5'-4"5'-8"10'-0"14'-0"6'-0"14'-6 1/2"19'-0"35'-8"4'-0"8'-8"9'-10"11'-6"5'-8 1/2"5'-3 1/2"7'-3"6'-5 1/2"7'-1 1/2"7'-4"4'-6 1/2"5'-4"7'-3"6'-5 1/2"5'-3 1/2"7'-3"7'-1 1/2"4'-4"5'-9"6'-9"6'-0"39'-8 1/2"19'-0"19'-0"19'-0 1/2"19'-8"22'-10"6'-10"11'-2"8'-0"12'-0"14'-0"11'-0"7'-0" 33'-4"23'-6" H J E E J H D E C E D C C C C C E C D C C EDJEH E C CC E D E C 312-R20 C314-R20 C 316-R20 C 322-R20 324-R20 C C 332-R20334-R20C C 336-R20C 313-R20 303-R20J F 306-R2011 11 JANITORC303 DATA/ITC304 ELEV. E300 ELEV.E301 STAIRS300 S300ASTAIRS301 S301A WEST CORRIDOR C302 EAST CORRIDORC314 NORTHCORRIDOR C305 304-R20308-R20E C C 318-R20 320-R20 330-R20C 338-R20340-R20333-R20331-R20311-R20 305-R20301-R20315-R20 6'-0"8'-0"7'-0"6'-0"4'-8" 308-R01 312-R01314-R01306-R01 304-R01 303-R01 301-R01302-R01 305-R01 302-R20316-R01318-R01320-R01315-R01313-R01311-R01332-R01 330-R01324-R01322-R01334-R01 336-R01 331-R01 338-R01 333-R01 340-R01BB BB A8.00 4 eeW6W22 eeW6W22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 eeW6B22 eeW6M22 eeW6W22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 eeW6W22 eeW6M22 eeW6M22 eeW6M22 eeW6M22 eeW6M22eeW6M22eeW6M22 eeW6F32eeW6M22 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6G11 iiW6E11 iiW6C12 iiW6C12 iiW6E11iiW6J12 iiW6C12 iiW6G11 iiY8F11 iiY8D11 iiW6G11 iiY8D11 iiY8A11 iiW6G11iiW6G11 iiY8A11 iiW6A00 iiW6C12iiS2B12 iiW6G11 iiY8D11 iiY8D11 iiW6E11 iiW6C12 iiW6C12iiW6C12 iiW4L12 iiW6G11 iiW6G11 iiY8A11 iiW6G11 iiY8D11 iiY8D11 iiY8A11 iiY8D11 iiY8A11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8A11 iiY8D11 iiY8D11 iiY8F11 iiY8D11 iiY8D11 iiW6G11 iiY8A11 eeW6W22 1 A4.01 1 A4.01 21 21 21 21 21 21 21 iiS2B12 iiS2B12 E302A A7.03 6 ELEV LOBBY E302 SKI LOCKERSC310 /1A7.10 /1 A7.10 /1A7.10 /1 A7.10 /1A7.10 /1 A7.10 /1A7.10 /1 A7.10 /1 A7.10 /1 A7.10 /1A7.10 /1A7.22A/1 A7.22A /1A7.12 /1A7.12 /1A7.12 /1A7.14 /1 A7.26A /1A7.19A /1A7.19A /1 A7.23A /1A7.21A /1 A7.11 /1 A7.18 /1A7.173'-1"8'-6"5'-4"8'-8"18'-5"7'-2"12'-0"6'-0"31'-6 1/2"37'-8"iiW6E11 iiW6L12 iiW6G11 xx1166 xx1166 25 25 25 25 25 25 25 25 25 25 25 25 E iiW6C12 iiW6C12 iiW6C12 TYPE A UNIT ON LEVEL 5, SEE A7.15 SHAFT 32'-0"6'-0"32'-0"67'-0"32'-0"6'-0"32'-0"4'-6 1/2" 211'-6 1/2"32'-0"6'-0"32'-0"49'-0"20'-2"eeW6M22 /1 A7.23A UNIT C-3 301UNIT C-3 302 UNIT A-1303 UNIT B-1 304 UNIT B-3 305 UNIT A-1306 UNIT C-7 308 UNIT A-1 312 UNIT A-1 314 UNIT A-1 316 UNIT B-1 318 UNIT B-1 320 UNIT A-1 322 UNIT A-1 324 UNIT C-4330 UNIT A-1332 UNIT A-1334 UNIT A-1336 UNIT A-2338 UNIT B-4 TYPE A340 UNIT B-5333 UNIT C-2 331 UNIT C-1315UNIT A-1313UNIT C-1311 G C310A iAJ iiW6C12 iiL4A00 iiL4A00 C303A C304A A8.02 4 iiS2B12 iiS2B12 iiS2B12 EXP eeW6M22 TRASHC311SHAFT iiW6M22 iiW6M22iiW6M22 iiW6M22 iiW6M22 iiW6M22 iiW6W22 iiW6M22 SHAFTSHAFT iiW6M22 UP25 iiS2B12iiS2B12 iiS2B12 /1A2.15/1A2.16/1A2.17/1A2.16/1A2.15/1A2.17/1A2.16/1A2.16iiW6C12 C311A 1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OFCONCRETE, FACE OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONSWILL BE +1/2" FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.3. SEE SHEET A1.11 FOR WALL TYPE DESIGNATIONS.4. FURNITURE SHOWN FOR REFERENCE ONLY, NOT PART OF THE CONSTRUCTIONCONTRACT.5. ALL LEVEL 6 UNITS WITH THE LABEL "PH" ARE DESIGNATED PENT HOUSE UNITS, SEE PENT HOUSE UNIT LEGEND FOR UNIT TREATMENT DIFFERING FROM TYPICAL UNIT TYPES. 6. PARKING SPACE NUMBERS TO BE LOCATED ON THE WALL CENTERED ON EACH PARKING SPACE, PARKING SPACE NUMBERS TO BE PAINTED ON FLOOR WHERE NOT ADJACENT TO A WALL7. NORTH ORIENTATION VARIES THROUGHOUT PLANS, SEE OVERALL FLOOR PLANS. SHEET NOTES -FLOOR PLAN SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DDRRAAWWNN BBYY:: CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:AHJ APPROVAL: THIS SHEET IS INTENDED TO BE PRINTED IN COLOR HHEELLEENNAAP: 406-442-4933 BBOOZZEEMMAANNP: 406-219-2216 www.sma.design 5/12/2023 7:35:45 PMA2.03 22114455 22002233--0055--0088 FFLLOOOORR PPLLAANN --LLEEVVEELL 33 LE CF 55tthh && MMAAIINN RREESSIIDDEENNCCEESS 22114455 442211 WW.. MMAAIINN SSTTRREEEETTBBOOZZEEMMAANN,, MMTT 5599771155 RREEUUTTEERR WWAALLTTOONN PPEERRMMIITT SSEETT 1/8" = 1'-0"A2.0311 LEVEL 3 FLOOR PLAN CENTERWEST EAST N KEYNOTES - FLOOR PLAN 1 DERO ULTRA SPACE SAVER, WALL MOUNTED BIKE STORAGE RACK, OR APPROVED EQUAL.PROVIDE ADDITIONAL BLOCKING AS REQ'D. 2 FLOOR DRAIN, SEE PLUMB 3 HVAC SHAFT, SEE MECH4 STAINLESS STEEL WASH TUB WITH OPERABLE DOOR AND RAMP - SEE PLUMBING5 JULIET BALCONY - SEE DETAILS 6 MOVEABLE LAMINATE SHELVING 7 NOT USED8 ALUMINUM FRAMED FULL WALL MIRROR9 CASEWORK - BOOTH SEATING AND TABLE 10 GAS FIREPLACE INSERT - SEE ELECTRICAL 11 75" FLAT SCREEN TV, CENTER AT 66" A.F.F. - OWNER FURNISHED, CONTRACTOR INSTALLED 12 FINISHES SURFACE TO PLANE OUT, COORDINATE WITH WALL FRAMING13 8" X 8" WOOD BEAM ACCENT FRAME14 WATER BOTTLE FILLER - SEE PLUMBING 15 BIKE FIX STATION 16 CASEWORK - LEASING DESK/OFFICE17 METAL ACCENT PANEL18 RECESSED BUILT-IN LAMINATE SHELVES 19 WRAP STRUCTURAL COLUMN IN GYP 20 FITNESS EQUIPMENT - OWNER FURNISHED, OWNER INSTALLED21 BALCONY W/ GUARDRAIL22 FLOOR DRAIN - SEE PLUMBING 23 DERO BIKE WALL RACK - CENTERED WITHIN PARKING SPACE, MOUNT 70" A.F.F. 24 MOP SINK - SEE PLUMBING 25 MECHANICAL LOUVER26 CLEANOUT - SEE MEP 27 BUILT IN ISLANDS - SEE TYP. ELEVATIONS & DETAILS 28 EMERGENCY BARRICADE TO SWING IN THE DIRECTION OF EGRESS 30 CANOPY BELOW, PER STOREFRONT BLOCK FRONTAGE REQUIREMENTS31 FLOOR DRAIN - SEE PLUMBING32 EV CHARGING STATION, SEE ELEC. 33 WRAP STRUCTURAL COLUMN IN BRICK - SEE ELEVATIONS FOR LAYOUT NNOO..DDAATTEE RREEVVIISSIIOONN DDEESSCCRRIIPPTTIIOONN 13 WD UP W D WD W D W D AA AA 2 A4.00 2 A4.00 A3.00 1 A3.01 2 A3.011 55 55 EE EE 44 44 ELEC/DATA/ITC604 22..11 22..11 22..22 22..22 33 33 55..11 55..11 66 66 DD..11 DD..11 DD DD CC CC 2 A4.01 2 A4.01 1 A4.00 1 A4.00 1 A4.02 1 A4.02 xx55 xx55A3.00 2 A3.02 1A3.022 19'-0 1/2"19'-0 1/2"19'-0"24'-0 1/2"24'-0"38'-0"32'-4"6'-6"11'-6"6'-4 1/2"5'-0"37'-1"19'-0"23'-9"42'-6 1/2"11'-10"139'-2"32'-0"32'-0"23'-8"19'-0 1/2"24'-4"19'-0"13'-0"6'-0"32'-0" 70'-0"67'-0"70'-0" 4'-5 1/2"7'-0 1/2"10'-0"7'-0"13'-2"9'-2"19'-2 1/2"5'-0"4'-6"8'-6"5'-8"6'-4"8'-7"4'-5 1/2"5'-0"39'-8 1/2"19'-0"24'-0"24'-0"8'-0"33'-4"23'-6" 5'-4"7'-5"6'-3 1/2"7'-2"7'-4"4'-6 1/2"5'-3 1/2"7'-3"6'-5 1/2"4'-10"5'-8"7'-10"5'-8 1/2"6'-4"7'-10"6'-2"3'-8 1/2"5'-3 1/2"7'-3"13'-7"7'-4"4'-6 1/2"5'-4"12'-0"9'-0"6'-0"4'-0"8'-8"9'-10"6'-9"4'-9 1/2"5'-8 1/2"5'-3 1/2"7'-3"6'-5 1/2"4'-3 1/2"6'-2"7'-10"5'-8 1/2"6'-4"7'-10"5'-2"4'-8 1/2"4'-10"8'-4"11'-4"24'-6"5'-2 1/2"7'-6"6'-4"4'-7 1/2"7'-3"7'-1 1/2"6'-10"6'-9"6'-9"3'-5"10'-5 1/2"M.O.6'-0"C 612-R20 614-R20 C C 632-R207'-5 1/2"7'-0"1'-6"6'-2 1/2"13'-10 1/2"C 613-R20 603-R20J 616-R20C 624-R20 C 11 11 ELEV.E600 STAIRS600 S600AELEV.E601 STAIR S601 S601A C603A WEST CORRIDOR C602 NORTHCORRIDORC605 E C C C 608-R20D E F 606-R20604-R20C 605-R20C 611-R20 615-R20 C E C H E 631-R20 J J J638-R20 C C636-R20634-R20C C D630-R20C ECC AJ601D601AS600C603-R01 604-R01 606-R01 605-R01 608-R01 612-R01614-R01616-R01618-R01620-R01622-R01624-R01615-R01613-R01611-R01632-R01 630-R01 634-R01 636-R01 638-R01 603-R01 618-R20 620-R20 622-R20 BB BB WATER HEATERC603 /1A7.12 /1A7.10 /1 A7.10 /1 A7.26A /1A7.14 /1A7.19A /1A7.23A /1 A7.24A /1 A7.13 A8.00 7 E MECHE603 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6B22 eeW6W22 eeW6W22 eeW6M22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22 eeW6W22eeW6W22eeW6W22eeW6W22eeW6W22 iiY8D11 iiY8A11 iiY8D11 iiY8A11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8D11 iiY8A11 iiY8A11 iiW6C12 iiW6C12 iiW6J12iiW6J12 iiW6A01 iiW6G11 iiW6G11 iiW6G11 iiY8F11 iiY8D11 iiY8A11 iiY8A11 iiY8A11 iiW6G11 iiW6A00 iiW6C12 iiS2B12 iiW6A01 iiW6G11 iiY8D11 iiW6A01 iiW4A01 iiW6C12 iiW6C12 iiW4L12 iiW6G11 iiW6G11 iiY8A11 iiW6G11 iiY8D11 iiW6E11 iiW6A01 iiW6A01 iiW6G11 iiW6A01 iiW6G11 iiW6G11 iiW6A01 iiW6G11 iiW6G11 1 A4.01 1 A4.01 21 21 21 216'-6"9'-8"6'-0"8'-0"7'-0"6'-0"4'-8" 31'-8" AH 601CE602A A7.03 11 42'-2 1/2" ELEV. LOBBYE602 TV LOUNGEC610 EAST CORRIDORC614 /1 A7.10 /1 A7.10 /1 A7.10 /1 A7.10 /1 A7.10 /1A7.10 /1 A7.10 /1A7.12 /1A7.19A /1A7.12 iiW4A01 iiW6C12 EAST DECK 607 6'-2"7'-0"4'-10"18'-5"10'-0"8'-7"10'-0"5'-0" iiW6G11 iiW6G11 iiW6G11 C604A iAL 25 25 25 25 25 25 25 25 256'-5"11'-0 1/2"5'-10 1/2"13'-4 1/2"20'-0 1/2"4'-5 1/2"C604A iiW6C12 C C C 25 612A LOUNGE601 4'-5 1/2" RESTROOM612 iiY8D11 iiY8A11 iiS2B12 iiS2B12 32'-0"6'-0"32'-0"67'-0"19'-0"13'-0"6'-0"32'-0"32'-0"6'-0"32'-0"49'-0"20'-2"207'-0" 631-R01 UNIT A-1 603 UNIT B-1 PH 604 UNIT B-3 PH 605 UNIT A-1606 UNIT C-7PH 608 UNIT A-1612 UNIT A-1614 UNIT A-1616 UNIT B-1PH 618 UNIT B-1PH 620 UNIT A-1622 UNIT A-1624 UNIT C-4PH 630 UNIT A-1632 UNIT B-1PH 634 UNIT B-1 PH636 UNIT B-2 PH 638 UNIT C-5 PH631 UNIT C-1PH615 UNIT A-1613 UNIT C-1PH611 G 25 eeW6W22 eeW6W22eeW6W22 eeW6W22 14'-4" ROOF DECK 603 AK iiY8D11 eeW8W22S600B 3'-2 1/2"10'-0"AK 601B AL 3'-3 1/2"5'-4"2'-0"10'-0"3'-2 1/2"23'-9 1/2"C610A C611ATRASHC611 SHAFT SHAFT eeW6W22 eeW6W22 eeW6W22eeW6W22 eeW6G11 A8.02 5 iiW6W22iiW6W22 iiW6W22 iiW6W22 iiW6W22 iiW6W22 eeW6W22 DN4 A4.02 4 A4.02 25 25 iiS2B12 iiS2B12 iiS2B12 /1A2.24/1A2.24/1A2.26/1A2.26/1A2.25/1A2.25/1A2.25/1A2.25/1 A7.12 /1 A7.12 6'-0" A2.38 1 A2.38 2 iiW6C12 iiW6C12 A7.05 1 1. DIMENSIONS ARE TYPICALLY TAKEN TO GRID, FACE OF MASONRY, FACE OFCONCRETE, FACE OF STUD OR DOOR/WINDOW OPENINGS. DIMENSIONS TO OPENINGS ARE NOMINAL, VERIFY ALL OPENINGS WITH ROUGH OPENING REQUIREMENTS.2. MASONRY IS DIMENSIONED NOMINALLY TO THE FACE. ACTUAL DIMENSIONSWILL BE +1/2" FOR INSIDE DIMENSIONS AND MASONRY OPENINGS, AND -1/2" FOR OUTSIDE DIMENSIONS.3. SEE SHEET A1.11 FOR WALL TYPE DESIGNATIONS.4. FURNITURE SHOWN FOR REFERENCE ONLY, NOT PART OF THE CONSTRUCTIONCONTRACT.5. ALL LEVEL 6 UNITS WITH THE LABEL "PH" ARE DESIGNATED PENT HOUSE UNITS, SEE PENT HOUSE UNIT LEGEND FOR UNIT TREATMENT DIFFERING FROM TYPICAL UNIT TYPES. 6. PARKING SPACE NUMBERS TO BE LOCATED ON THE WALL CENTERED ON EACH PARKING SPACE, PARKING SPACE NUMBERS TO BE PAINTED ON FLOOR WHERE NOT ADJACENT TO A WALL7. NORTH ORIENTATION VARIES THROUGHOUT PLANS, SEE OVERALL FLOOR PLANS. SHEET NOTES -FLOOR PLAN SHEET NO.: TITLE: COPYRIGHT 2023 SMA, P.C. REVISIONS: KEYMAP: ARCHITECT/ENGINEER SEAL: PROJECT: PROJECT LOCATION: PREPARED FOR: OWNER LOGO: CONSULTANT LOGO/CONTACT: PROJECT NUMBER: DDRRAAWWNN BBYY::CCHHEECCKKEEDD BBYY:: TEAM: PHASE: DATE: SMA PROJECT NUMBER:Plot Date:AHJ APPROVAL: THIS SHEET IS INTENDED TO BE PRINTED IN COLOR HHEELLEENNAAP: 406-442-4933BBOOZZEEMMAANNP: 406-219-2216 www.sma.design 5/12/2023 7:36:25 PMA2.06 22114455 22002233--0055--0088 FFLLOOOORR PPLLAANN --LLEEVVEELL 66 LE CF 55tthh && MMAAIINN RREESSIIDDEENNCCEESS 22114455 442211 WW.. MMAAIINN SSTTRREEEETTBBOOZZEEMMAANN,, MMTT 5599771155 RREEUUTTEERR WWAALLTTOONN PPEERRMMIITT SSEETT 1/8" = 1'-0"A2.0611 LEVEL 6 FLOOR PLAN KEYNOTES - FLOOR PLAN 1 DERO ULTRA SPACE SAVER, WALL MOUNTED BIKE STORAGE RACK, OR APPROVED EQUAL.PROVIDE ADDITIONAL BLOCKING AS REQ'D.2 FLOOR DRAIN, SEE PLUMB3 HVAC SHAFT, SEE MECH4 STAINLESS STEEL WASH TUB WITH OPERABLE DOOR AND RAMP - SEE PLUMBING 5 JULIET BALCONY - SEE DETAILS 6 MOVEABLE LAMINATE SHELVING 7 NOT USED 8 ALUMINUM FRAMED FULL WALL MIRROR 9 CASEWORK - BOOTH SEATING AND TABLE10 GAS FIREPLACE INSERT - SEE ELECTRICAL11 75" FLAT SCREEN TV, CENTER AT 66" A.F.F. - OWNER FURNISHED, CONTRACTOR INSTALLED12 FINISHES SURFACE TO PLANE OUT, COORDINATE WITH WALL FRAMING13 8" X 8" WOOD BEAM ACCENT FRAME 14 WATER BOTTLE FILLER - SEE PLUMBING 15 BIKE FIX STATION 16 CASEWORK - LEASING DESK/OFFICE 17 METAL ACCENT PANEL 18 RECESSED BUILT-IN LAMINATE SHELVES19 WRAP STRUCTURAL COLUMN IN GYP20 FITNESS EQUIPMENT - OWNER FURNISHED, OWNER INSTALLED21 BALCONY W/ GUARDRAIL 22 FLOOR DRAIN - SEE PLUMBING 23 DERO BIKE WALL RACK - CENTERED WITHIN PARKING SPACE, MOUNT 70" A.F.F. 24 MOP SINK - SEE PLUMBING 25 MECHANICAL LOUVER 26 CLEANOUT - SEE MEP27 BUILT IN ISLANDS - SEE TYP. ELEVATIONS & DETAILS28 EMERGENCY BARRICADE TO SWING IN THE DIRECTION OF EGRESS30 CANOPY BELOW, PER STOREFRONT BLOCK FRONTAGE REQUIREMENTS31 FLOOR DRAIN - SEE PLUMBING 32 EV CHARGING STATION, SEE ELEC. 33 WRAP STRUCTURAL COLUMN IN BRICK - SEE ELEVATIONS FOR LAYOUT CENTERWEST EAST N NNOO..DDAATTEE RREEVVIISSIIOONN DDEESSCCRRIIPPTTIIOONN 14 15 lobby 16 ramp and seating 17 tv lounge | dark island in place of soft seating 18 elevator (1) 19 fitness 20 bike storage + dog wash (1) 21 ski lockers 22 yoga 23 cowork focus rooms 24 Level 6 TV Bar 25 sky lounge 26 spa deck 27 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executives Director Downtown Bozeman Partnership SUBJECT:Executive Director's June 2023 Report MEETING DATE:June 20, 2023 AGENDA ITEM TYPE:Plan/Report/Study RECOMMENDATION:Discuss STRATEGIC PLAN:7.3 Best Practices, Creativity & Foresight: Utilize best practices, innovative approaches, and constantly anticipate new directions and changes relevant to the governance of the City. Be also adaptable and flexible with an outward focus on the customer and an external understanding of the issues as others may see them. BACKGROUND:Ellie will present the monthly report of general program updates and updates to topic relating to downtown. Board will discuss relevant matters. UNRESOLVED ISSUES:None ALTERNATIVES:None FISCAL EFFECTS:None. Attachments: Alley design_draft.pdf DBP Monthly ED Report 6-23 - URD.pdf Report compiled on: April 12, 2023 28 N. TRACY AVE.N. BLACK AVE.29 30 31 32 33 34 35 Downtown Bozeman Partnership – ED Report June 2023 General Downtown Updates: • DBP Office/Programs: o DBP, DBA, BID, DURD FY24 Budgets have been reviewed and approval at ALL relevant board meetings and by the City Commission. Once the Professional Services Agreements for the DBP with the BID and DURD, I will share all FY24 budgets and works plans through the website for viewing and referral. o DBP Staff Annual Reviews have been completed and approved benefit/salary changes will be effective July 1, 2023. Ellie to complete her review with the PMC on June 23. • Upcoming Board Vacancies: o Both the Downtown URD and BID have vacancies. Apply here: https://www.bozeman.net/departments/city-commission/advisory-boards/apply-for- an-advisory-board • Downtown Sewer Project: Work will begin on E Main St between Rouse Ave and Church Ave on Monday, June 5, and will continue as listed below: o June 5 - July 5: E Main from Rouse to Church o June 19 - August 1: Church from Main to Babcock, and Babcock from Rouse to Church o August 11 - August 18: N Bozeman from Main to alleyway o August 21 – Sept. 1: N Bozeman from alleyway to Mendenhall o August 21 - September 21: E Main from Bozeman to Rouse ▪ More information is available on the City of Bozeman website: https://www.bozeman.net/departments/transportation- engineering/projects/east-main-street-construction. For weekly information about the project please follow BZNStreetReport on Facebook or visit bozemanstreetreport.com. For other questions or concerns please contact us at bznstreetreport@bozeman.net or 406-582-2913. • Downtown Maintenance: Now advertising as our summer-seasonal positions EC-UPDATE - $19/hr., great work environment, for job listing visit https://downtownbozeman.org/downtown-jobs/part-time-winter-seasonal-downtown- maintenance-employee. • Trainings/Volunteer Work Updates: o Ellie graduated from Leadership Montana 2023! o Ellie completed volunteer commitments with Special Olympics Montana at the very successful final Bozeman Games, they will move to Billings 2024-2026. o Emily received her certificate for CPTED Training – Crime Prevention Through Environmental Design. We are excited to work on what she learned into our DURD grant programs and future projects. Downtown/DURD Project Updates: 36 • Alley Project: We’re excited to announce that there’s been significant progress on the Alley Project design. Artists have been chosen and designs finalized. The official bid is at: https://weblink.bozeman.net/WebLink/Browse.aspx?id=275484&dbid=0&repo=BOZEMAN& cr=1. We hope to hire a contractor by June 23 and for design work to be completed through summer 2023. • Downtown REwrap Electrical Box Project – Re-wrapping after 11 years, art panel chose 11 amazing new pieces and Clean Slate will be starting coordination and install soon. • North Black Pocket Park: Work slated to be completed through June, DURD to order and place benches and planters in project area once complete. • Tree Replacement Project CONTINUES: Sprout Inc. has been hired to replace 3 more trees through summer 2023, while the City will handle the remaining 5 with intention for ALL current stumped trees to be removed and replanted by fall 2023. It was another rough winter, with possible 10-12 more dead trees to be removed by fall. City Forestry and DBP are developing a replacement program for the near future. • 5th & Main Sewer Project: See June 20 DURD agenda, discuss. Upcoming DBP/DBA Events • Art Walks – 2nd Friday, next AW July 14, 6-8pm • Music on Main – Thursday nights, 6:30-8:30pm - July 6th, July 13th, July 20th, July 27th, August 3rd, August 10th City of Bozeman/Community Updates: • City Commission Meetings – Next meeting – June 6 at 6pm o The six-month City Commission calendar can be found here: https://www.bozeman.net/Home/ShowDocument?id=10727. Previously recorded public meetings and live streams of meetings may be viewed here: https://www.bozeman.net/services/city-tv-and-streaming-audio. New Businesses/Building Projects: • Meridian Men opening THIS WEEK • Grey Dog Bar open on North Bozeman, not sure on details • Est. 1864 (a “noir bar”) now open • LV Wood West opening soon at 225 East Mendenhall (formerly Onyx tile) • El Camino/Kitty Warren closed and for sale or lease • Downtown Antiques closing their doors this week • Smoke, Fire & Coal closed, gallery to open in space • Stio to open Main Street Market (slated for in summer) • Chocolate Moose for sale • Girls Outdoors closing soon • Additional vacancies: Little Angels, • US Bank Building (104 East Main)—Development project continues, to be restored to original façade. New building name is The National • Village Downtown 92 condos are under construction on the other lot to the South of the 37 existing Lofts building. • North Central (20 North Tracy)—Mountain View & Medical Arts buildings, phased master site plan development proposing a total of 9 new mixed-use buildings, associated parking, open space and infrastructure. Lots of construction underway. 38 Memorandum REPORT TO:Downtown Area Urban Renewal District Board FROM:Ellie Staley, Executive Director SUBJECT:Monthly Finance Report MEETING DATE:June 20, 2023 AGENDA ITEM TYPE:Finance RECOMMENDATION:Discussion. STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant Downtown, Midtown, and other commercial districts and neighborhood centers – including higher densities and intensification of use in these key areas. BACKGROUND:Ellie will present the monthly finance report. UNRESOLVED ISSUES:None. ALTERNATIVES:None. FISCAL EFFECTS:None. Attachments: URD Finance Report 6-23.pdf Report compiled on: June 15, 2023 39 Downtown URD June 2023 Finance Report Downtown Urban Renewal District Finance Report Category Approved FY2023 Budget FY2023 YTD recent activity Income Starting Cash Balance 4,263,910$ 4,263,910$ ** not finalized number Income from TIF 335,000$ COB Interlocal Share 1,504,048$ Entitlement Share State of Montana 58,761$ Interest Income Other Income Total Income 6,161,719$ 4,263,910$ Expenses Operations DBP Management Fee 203,500$ 203,500$ Total Operations 203,500$ 203,500$ Infrastructure Improvements Street Furniture and Park Maintenance 25,000$ 19,742$ $849 greenspace Streetscape--new purchases 25,000$ 26,594$ North Willson Streetscape Project 75,000$ Streetscape Assistance Grant Program 50,000$ 18,365$ Alley Improvements 200,000$ FY20 Encumbered DBIP: Bozeman Creek Improvements 10,000$ DBIP: Wayfinding & Parking Signage 15,000$ Life-Safety Grant Program 30,000$ Fiber-Broadband Infrastructure--Grants 10,000$ 475$ Intersection Cable Anchor Repairs 25,000$ Parklet 50,000$ 7,690$ Alternative Transportation Projects 50,000$ Workforce Housing Project- Fire Station One 1,600,000$ Total Improvements 2,165,000$ 72,866$ Planning City Economic Development Specialist 35,500$ Technical Assistance Grants 50,000$ 7,500$ $7500 ridge TAG FY20 & FY21 Encumbered Funds Residential Incentive Program 200,000$ DBIP: Transportation Planning 50,000$ 32,182$ 21 Encumbered- Part Two--Data, Analysis, Cost Est DBIP: Alley Planning 50,000$ 43,864$ DBIP: Bozeman Creek Planning 10,000$ DBIP: Soroptomist Park Planning 25,000$ DBIP: Code Amendments 20,000$ DBIP: Design Guidelines 25,000$ DBIP: Downtown Infrastructure & Public Realm 50,000$ DBIP: General Implementation 50,000$ 30,372$ DBIP: Employee Paid Parking Permit System 20,000$ DBIP: Wayfinding Plan & Parking Signage 25,000$ Utility and Infrastructure Improvement 100,000$ Structured Parking Informal, Site Plan, Bids 1,250,000$ 14,657$ $7744 SS Professional Services Term Contract 75,000$ Streetscape Preliminary Engineering 50,000$ Total Planning 2,085,500$ 128,575$ Parking Structure Garage Bond Payment 335,000$ Total Parking Garage Payments 335,000$ -$ Total Expenses 4,789,000$ 404,941$ Balance 1,372,719$ 3,858,969$ $2100 groundprint $4898 design 5 URD Finance Report 6-23 40