Loading...
HomeMy WebLinkAbout7-4 Utility Occupancy Permit - StormMail To: City of Bozeman Engineering P.O. Box 1230, Bozeman, MT 59771 Or Fax to: 406-582-2263 Permit Number: PUBLIC RIGHT-OF-WAY UTILITY OCCUPANCY PERMIT Applicant Information Applicant/Utility: Phone: Mailing Address: Email for Permit Correspondence: Contractor: Phone: Project Information Facility Type: Overhead Trenched Underground Bored, Pushed, Trenchless Other Detailed Description of Proposed Installation: Location (Identify in detail the streets, alleys or public easement where this installation is proposed: Proposed dates of work: Attach construction drawings (3 copies) which are to be incorporated with this permit. Distances from right-of-way line, centerline, and existing utilities, to the proposed installation MUST BE PROVIDED. All above-ground structures must be clearly identified on the drawings. Street Cut Permit: If the proposed installation will require trenching, potholing or any other disruption of the traveled roadway (street or alley), roadway shoulders, or pedestrian or bikeway facilities, a Street Cut Permit must be obtained prior to commencing work. Traffic Impacts: If the proposed installation will require the closing of one or more lanes of traffic, a detailed Traffic Control Plan must be attached and incorporated with this permit. All construction zones shall be signed in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). Permit Conditions: This installation is subject to compliance with the City of Bozeman’s Utility Occupancy Guidelines and the following requirements: 1. The Applicant/Utility will notify the City Engineer at least 48 hours in advance of initiation of any work detailed in the permit with the exception of emergency situations. 2. The City of Bozeman shall not be liable to the general public for any injury to or death of any person whomsoever belonging when such injury, death, loss or damage arises out of or results from the construction, maintenance, or repair of existing or future utility facilities located within public right-of-way, or the installation or operation of such utility facilities within the public right-of-way, regardless of whether or not the City of Bozeman has expressed or implied approval of the construction, maintenance, repair, installation or operation of such facilities within the public right-of-way. In accepting this permit, the Permittee, its/his/her successors or assignees, agrees to indemnify the City and hold it harmless from all claims, actions, liability, and damage of every kind and description which may accrue to or be suffered by any person or person, corporations or property by reason of the performance of any such work, character of materials used, or manner of installations, maintenance and operation, or by the improper occupancy of said roadway right-of-way, and in case any suit or action is brought against the City and arising out of, or by reason of, any of the above causes, the Permittee, its/his/her successors or assignees, will upon notice to it/him/her of the commencement of such action, defend the same at its/his/her sole cost and expense and satisfy any judgment which may be rendered against the City in any such suit or action. City includes its officers, employees, agents and assignees. 3. This approval is granted with the understanding that the installation will be made according to the plans as submitted. Field revision may only be made with the approval of the City Engineer or designee. If the installation is not made as shown on the plans or approved amendment, the City of Bozeman, at its discretion, may require the removal of the installation. 4. CONSTRUCTION, MAINTENANCE, REMOVAL OF INSTALLATION OR STRUCTURES. Permittee, at permittee’s sole cost and expense shall construct, maintain, replace, relocate and/or remove the installation, facility, or structure in accordance with the applicable City and industry standards. Furthermore, after completion of any of the aforementioned construction, permittee shall fill in any excavations and restore the right-of-way to its original condition. The City shall have the right at any time to require permittee to maintain, reconstruct, replace, relocate and/or remove its facility from the right-of-way, all at the permittee’s expense. 5. Additional Requirements: Applicant Signature (required) Signature: Printed Name: Utility: Title: Date: Official Use Only Approved _ Disapproved By: Title: Date: Permit Fee: Permit Number: