Loading...
HomeMy WebLinkAbout030 UtilitiesJarrett Subdivision Preliminary Plat Application Utilities Northwestern Energy has been notified that electricity and natural gas service will need to be provided to the subdivision and has confirmed that they can provide service, as seen in the attached letter. It has been requested from Northwestern to work concurrently and in cooperation with other utilities and services, including telephone, internet, and cable TV providers to provide for their respective infrastructure in joint utility trenches. Gas, electricity, and information utilities will be phased and will be installed after completion of roads but prior to construction of dwellings. All utilities will be located underground and per the City of Bozeman Standards. Scott Beraud Engineer NorthWestern Energy I 121 E Griffin Drive I Bozeman, MT 59715I Mobile (406) 223-6498 Scott.Beraud@northwestern.com 121 East Griffin Drive | P.O Box 490 | Bozeman, MT 59771 | New Construction: 406-582-4600 NorthWesternEnergy.com March 2, 2023 Perryn Raymond Madison Engineering, LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 Dear Perryn Raymond, Northwestern Energy is willing and able to provide natural gas and electric service to the Jarrett Subdivision which includes one hundred and four (104) Single family homes. These services can be provided in accordance with applicable Montana Public Services rules and regulations and the current Northwestern Energy tariff schedule. Please note that the nearest natural gas is at the intersection of 11th Ave and Arnold St. The nearest electric is at the intersection of 11th Ave and Arnold St. Northwestern Energy shall determine the locations of all transformers, underground lines and equipment to provide for maintenance and installation. These facilities shall be located on front lot lines in a minimum 10’ wide utility easement. Please call or email me if you have any questions or concerns at (406) 223-6498. Also, we require having a copy of the approved plat of this proposed area prior to providing a cost to bring in these services. If installation is required prior to approval of the plat, it will be your responsibility to keep us informed of any changes which would alter our utility design and installation. To request a cost estimate we would also require a signed application for new service along with an electronic layout of the subdivision. Sincerely, Scott Beraud