HomeMy WebLinkAbout030 UtilitiesJarrett Subdivision
Preliminary Plat Application
Utilities
Northwestern Energy has been notified that electricity and natural gas service will need to be
provided to the subdivision and has confirmed that they can provide service, as seen in the
attached letter. It has been requested from Northwestern to work concurrently and in
cooperation with other utilities and services, including telephone, internet, and cable TV
providers to provide for their respective infrastructure in joint utility trenches. Gas, electricity,
and information utilities will be phased and will be installed after completion of roads but prior
to construction of dwellings. All utilities will be located underground and per the City of
Bozeman Standards.
Scott Beraud
Engineer
NorthWestern Energy I 121 E Griffin Drive I Bozeman, MT 59715I Mobile (406) 223-6498
Scott.Beraud@northwestern.com
121 East Griffin Drive | P.O Box 490 | Bozeman, MT 59771 | New Construction: 406-582-4600
NorthWesternEnergy.com
March 2, 2023
Perryn Raymond
Madison Engineering, LLC
895 Technology Boulevard, Suite 203
Bozeman, MT 59718
Dear Perryn Raymond,
Northwestern Energy is willing and able to provide natural gas and electric service to the Jarrett
Subdivision which includes one hundred and four (104) Single family homes. These services can be
provided in accordance with applicable Montana Public Services rules and regulations and the current
Northwestern Energy tariff schedule. Please note that the nearest natural gas is at the intersection of
11th Ave and Arnold St. The nearest electric is at the intersection of 11th Ave and Arnold St.
Northwestern Energy shall determine the locations of all transformers, underground lines and equipment
to provide for maintenance and installation. These facilities shall be located on front lot lines in a
minimum 10’ wide utility easement.
Please call or email me if you have any questions or concerns at (406) 223-6498. Also, we require
having a copy of the approved plat of this proposed area prior to providing a cost to bring in these
services. If installation is required prior to approval of the plat, it will be your responsibility to keep us
informed of any changes which would alter our utility design and installation. To request a cost estimate
we would also require a signed application for new service along with an electronic layout of the
subdivision.
Sincerely,
Scott Beraud