Loading...
HomeMy WebLinkAbout021 GroundwaterJarrett Subdivision Preliminary Plat Application Groundwater Monitoring wells have been drilled on site to monitor the groundwater throughout the high-water season. In December of 2022 the groundwater depth across the site was approximately 13.5 ft. This is stated in the included Preliminary Geotech Assessment Report.