Loading...
HomeMy WebLinkAbout151 PLUMBING SCHEDULES & DETAILSMETER 276 MBH WORK BY UTILITY PROVIDER WORK BY PLUMBING CONTRACTOR SERVICE PRESSURE|14" W.C. EQ-AS1 BBQ 76 MBH EQ-AS2 FIRE PIT 100 MBH EQ-AS2 FIRE PIT 100 MBH 1 1/4" 1" 3/4" 3/4" 3/4" 4.5" W.C. REGULATOR GAS PIPE SIZING CRITERIA PIPE SIZE CAPACITY IN MBH 1/2"60 3/4"126 1"237 1 1/2"486 1 1/2"728 2"1400 3"3950 4"8050 NOTES: 1. CAPACITY VALUES PER 2021 IFGC TABLE 402.4(2) FOR SCHEDULE 40 METALLIC PIPE, INLET PRESSURE OF LESS THAN 2 PSI, AND PRESSURE DROP OF 0.5 IN W.C. ACE JOB 22BZ5529 12 N. BROADWAY SECOND FLOOR BELGRADE, MT 59714 406-388-3320 Sheet Number: © 2022 Solomon Cordwell Buenz Project Number: Drawn By: Checked By: PLUMBING SCHEDULES & DETAILS P0.01 2022001.000 NT KW Tschache Lane & 27 Ave. Bozeman, MT 59718 2695 TSCHACHE LANE TOTAL 426 MBH EQ-### OUTDOOR BBQ 76 MBH EQ-### OUTDOOR FIRE PIT 100 MBH EQ-### INDOOR FIREPLACE 125 MBH EQ-###RANGE 125 MBH TAG DESCRIPTION ITEM INPUT DEMAND DEMAND UNITS SINGLE UNIT NATURAL GAS FUEL LOAD SUMMARY 20 28 1" 1" 1" DCBPV 80 1" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT SINGLE UNIT WATER SERVICE SCHEDULE NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE ANGLE STOP. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 14" W.C. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE BUILDING PLUMBING DRAWINGS FOR COORDINATION AND ADDITIONAL REQUIREMENTS. 39 83.5 1 1/2" 1 1/2" 1 1/2" RPZA 80 1 1/2" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT ROWHOME BUILDING WATER SERVICE SCHEDULE NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE ANGLE STOP. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE ANGLE STOP. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. 28 42.5 1" 1" 1" RPZA 80 1" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT ROWHOME DUPLEX BUILDING WATER SERVICE SCHEDULE 260 1467 4" 4" 4" RPZA 80 4" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT FLATS WATER SERVICE SCHEDULE NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE GATE VALVE. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. 80 157 2" 2" 2" RPZA 80 2" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT CLUBHOUSE WATER SERVICE SCHEDULE NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE ANGLE STOP. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 14" W.C.. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE BUILDING PLUMBING DRAWINGS FOR COORDINATION AND ADDITIONAL REQUIREMENTS. TOTAL 2,475 MBH EQ-### OUTDOOR BBQ 76 MBH EQ-### OUTDOOR BBQ 76 MBH EQ-### OUTDOOR FIRE PIT 100 MBH EQ-### OUTDOOR FIRE PIT 100 MBH EQ-###RANGE 125 MBH B-2 BOILER 399 MBH B-1 BOILER 399 MBH POOL EQIUPMENT POOL EQUIPMENT 1,200 MBH TAG DESCRIPTION ITEM INPUT DEMAND DEMAND UNITS AM-1 CLUBHOUSE NATURAL GAS FUEL LOAD SUMMARY TOTAL 76 MBH EQ-### OUTDOOR BBQ 76 MBH TAG DESCRIPTION ITEM INPUT DEMAND DEMAND UNITS AM-3 GEAR GARAGE NATURAL GAS FUEL LOAD SUMMARY 53 55 1 1/2" 1 1/2" 1 1/2" RPZA 80 1 1/2" 75 PEAK DEMAND (GPM) PEAK DEMAND (WSFU) SERVICE LINE SIZE METER SIZE BACKFLOW PREVENTER SIZE BACKFLOW PREVENTER TYPE STATIC PRESSURE AT SERVICE PRESSURE REDUCING VALVE SIZE PRESSURE REDUCING VALVE SETPOINT GEAR GARAGE WATER SERVICE SCHEDULE NOTES: 1. CONTRACTOR SHALL VERIFY SITE WATER SUPPLY STATIC PRESSURE AND SHALL NOTE DISCREPENCIES TO THE ENGINEER. 2. SITE CONTRACTOR SHALL PROVIDE WATER SERVICE PIPING AND ACCESSORIES UP TO AND INCLUDING THE SERVICE ANGLE STOP. SITE CONTRACTOR SHALL PROVIDE DISINFECTION, FLUSHING, PRESSURE TESTING, AND BACTERIOLOGICAL TESTING OF THE SERVICE PIPING. PLUMBING CONTRACTOR SHALL PROVIDE PIPING AND ACCESSORIES DOWNSTREAM OF THE SERVICE ANGLE STOP. 3. COORDINATE WITH THE CITY OF BOZEMAN FOR PROCUREMENT AND INSTALLATION OF THE SERVICE WATER METER. 4. SEE PLUMBING SECTIONS AND DETAILS FOR ADDITIONAL REQUIREMENTS. NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 2 PSIG AND SHALL BE REDUED TO 14" W.C. AT EACH PIECE OR GROUP OF EQUIPMENT. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE BUILDING PLUMBING DRAWINGS FOR COORDIANTION AND ADDITIONAL REQUIREMENTS. TOTAL 276 MBH EQ-AS3 OUTDOOR FIRE PIT 100 MBH EQ-AS2 OUTDOOR FIRE PIT 100 MBH EQ-AS1 OUTDOOR BBQ 76 MBH TAG DESCRIPTION ITEM INPUT DEMAND DEMAND UNITS AMENITY SPACE NATURAL GAS FUEL LOAD SUMMARY NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 14" W.C.. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-AS3 ~75 FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE SITE PLUMBING DRAWINGS, PLUMBING DETAILS, AND GAS RISER DIAGRAM FOR COORDINATION AND ADDITIONAL REQUIREMENTS. NOT TO SCALE1AMENITY SPACE NATURAL GAS SYSTEM SCHEMATIC BUILDING TOTAL 300 MBH METER D TOTAL 75 MBH EQ-###RANGE 75 MBH METER D METER C TOTAL 75 MBH EQ-###RANGE 75 MBH METER C METER B TOTAL 75 MBH EQ-###RANGE 75 MBH METER B METER A TOTAL 75 MBH EQ-###RANGE 75 MBH METER A TAG DESCRIPTION ITEM INPUT DEMAND (E.A.)DEMAND UNITS ROWHOME NATURAL GAS FUEL LOAD SUMMARY NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 14" W.C. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE BUILDING PLUMBING DRAWINGS FOR COORDINATION AND ADDITIONAL REQUIREMENTS. TOTAL 7,350 MBH EQ-### RANGE 98 75 7,350 MBH TAG DESCRIPTION QUANTITY ITEM INPUT DEMAND (E.A.) INPUT DEMAND (TOTAL)DEMAND UNITS FLATS NATURAL GAS FUEL LOAD SUMMARY NOTES: 1. EQUIPMENT INPUT DEMAND AT SITE ELEVATION IS BASED ON "ANSI Z21-13/CSA 4.9 INPUT RATING REQUIREMENTS AT SITE ELEVATION" OR THE PUBLISHED INPUT DEMAND RATING AT SITE ELEVATION BY THE EQUIPMENT MANUFACTURER. 2. SYSTEM DELIVERY PRESSURE SHALL BE 2 PSIG AND SHALL BE REDUED TO 14" W.C. AT EACH PIECE OR GROUP OF EQUIPMENT. COORDINATE WITH THE LOCAL UTILITY PROVIDER. 3. MOST REMOTE FIXTURE IS EQ-### ~#### FEET EQUIVALENT PIPE LENGTH FROM METER. 4. PLUMBING CONTRACTOR SHALL PRIME AND PAINT ALL NATURAL GAS PIPING ON THE BUILDING EXTERIOR TO MATCH THE BUILDING COLOR. COORDINATE WITH GENERAL CONTRACTOR. 5. SEE BUILDING PLUMBING DRAWINGS FOR COORDINATION AND ADDITIONAL REQUIREMENTS. NO. DATE DESCRIPTION 08.31.2022 SITE PLAN REVIEW DOCUMENTS A 02.17.2023 SITE PLAN REVIEW - RC 1 M O N T A N A PROFE SSIONA L E N G IN EERLICENSE D T WEEDA KIP A. No. 12615 PE 8/31/2022