Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
103 LANDSCAPE DETAILS 1
1L5.003/8" = 1'-0"Typ. Deciduous Tree B&B PlantingMIN. 2 X ROOT BALL DIAM.FINISH GRADEELEVATION OF TREE FLARE TO BE 2" ABOVEFINISH GRADE ELEVATION. REMOVE EXCESSSOIL FROM ROOT BALL, AS REQUIRED, INORDER TO EXPOSE FLAREPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT. SOILAT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3" DIAM.)FROM PIT PRIOR TO PLANTINGBACKFILL WITH MIX: 13 NATIVE BACKFILLSOIL, 13 SANDY LOAM AND 13 DEBRISFREE TOPSOILNATIVE SOILTREE STAKING, SEE SHEET L500: DETAIL 5ROOT BALL3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH TRUNK3" HIGH ROUND-TOPPED CIRCULAR RING FORWATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PIT2L5.003/8" = 1'-0"Typ. Deciduous Tree B&B Planting - On SlopeMIN. 2 X ROOT BALL DIAM.FINISH GRA D E BACKFILL WITH MIX: 13 NATIVE BACKFILL SOIL,13 SANDY LOAM AND 13 DEBRIS FREE TOPSOILNATIVE SOIL3" - 4" LAYER OF BARK MULCH. DO NOT ALLOWMULCH TO COME IN CONTACT WITH TRUNKORIGINAL GRADEPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT. SOILAT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3" DIAM.)FROM PIT PRIOR TO PLANTING3" - 5" HIGH ROUND-TOPPED CIRCULAR RINGFOR WATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PITTREE STAKING, SEE SHEET L500: DETAIL 5ELEVATION OF TREE FLARE TO BE 2" ABOVEFINISH GRADE ELEVATION. REMOVE EXCESSSOIL FROM ROOT BALL, AS REQUIRED, INORDER TO EXPOSE FLAREROOT BALLFINISH GRADETREE FENCE / CAGE. CAGE SHALL BE MIN. 6'TALL. FASTEN CAGE TO STAKE WITH CABLETIES OR WIRE. CAGE TO BE NO. 14 GAUGEGALVANIZED WELDED WIRE MESH 2" X 4"TWO 2" X 2" X 8' HARDWOOD STAKES DRIVENMIN. 24" BELOW FINISHED GRADE AND MIN. 6'HEIGHT ABOVE FINISHED GRADE. STAKES TOBE SET OUTSIDE OF TREE DRIP LINE. STEELSTAKES MAY BE USED FOR LARGER TREES.STAKES SHALL NOT PENETRATE ROOT BALL.REMOVE STAKES AFTER TWO YEARSPROTECT TREE TRUNK WITH APPROVED PLANTTIE MATERIAL. SET TIES LOOSE ENOUGH TOALLOW FOR TRUNK AND ROOT DEVELOPMENT.TIES TO BE OF SOFT, WIDE (MIN. 1") POLYMERMATERIAL. WIRE SHALL NOT BE WRAPPEDAROUND TRUNK. FASTEN TIES AT LESS THAN 13OF THE TOTAL TREE HEIGHT, AT LOWESTBRANCHES TO PREVENT SLIDING10" GAUGE WIREINDUSTRY GRADE PLASTIC TREE GUARDS,DO NOT USE TRUNK WRAPS3L5.003/8" = 1'-0"Typ. Plant Protection Methods6'-0"4L5.003/4" = 1'-0"Typ. Shrub Planting, Individual Planting PitMIN. 2 X ROOT BALL DIAM.FINISH GRADEELEVATION OF ROOT CROWN TO BE 1" - 2"ABOVE FINISH GRADE ELEVATION3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH SHRUB STEMSNATIVE SOILPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT. SOILAT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3"DIAM.) FROM PIT PRIOR TO PLANTINGROOT BALLBACKFILL WITH MIX: 13 NATIVEBACKFILL SOIL WITH 13 SANDY LOAMAND 13 DEBRIS FREE TOPSOIL3" HIGH ROUND-TOPPED CIRCULAR RINGFOR WATER RETENTION. FORM RING OFSOIL ALONG THE PERIMETER OF THEPLANTING PIT5L5.001/2" = 1'-0"Typ. Shrub Planting, Individual Planting Pit - On SlopeMIN. 2 X ROOT BALL DIAM.FINISH GRADE NATIVE SOILPLANTING PIT. PIT TO HAVE BROADLYSLOPING SIDES; SCARIFY SIDES OF PIT.SOIL AT THE BOTTOM OF THE PIT TO BESUFFICIENTLY COMPACTED TO PREVENTSETTLEMENT. EXCAVATE PIT 2X - 5XDIAMETER OF ROOT BALL. REMOVE ALLDEBRIS AND ROCKS (LARGER THAN 3"DIAM.) FROM PIT PRIOR TO PLANTINGBACKFILL WITH MIX: 13 NATIVE BACKFILLSOIL WITH 13 SANDY LOAM AND 13 DEBRISFREE TOPSOIL3" - 5" HIGH ROUND-TOPPED CIRCULAR RINGFOR WATER RETENTION. FORM RING OF SOILALONG THE PERIMETER OF THE PLANTING PITORIGINAL GRADEROOT BALLELEVATION OF ROOT CROWN TO BE 1" - 2"ABOVE FINISH GRADE ELEVATION3" - 4" LAYER OF BARK MULCH. DO NOTALLOW MULCH TO COME IN CONTACTWITH SHRUB STEMS8L5.001" = 1'-0"Natural Steel Edging - Lawn1" REVEALNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 2" DIAMETER) FROM NATIVE SOIL2.ALL LAWN AREA SURFACES TO BE LIGHTLY SCARIFIED OR LIGHTLY TILLED ANDRAKED SMOOTH. SOD AREAS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOSTWITH MIN. 5" NEW TOPSOIL FOR A COMBINED SETTLED DEPTH OF 6". TOPSOILSHALL BE DRUM ROLLED OR TRACK PACKED AND GRADED SMOOTHLY AND EVENLYPRIOR TO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADENATIVE SOIL316" X 4" NATURALSTEEL EDGINGTAC WELDED TO#4 REBAR DRIVENMIN. 18". REBARSPACED 24" O.C.PLANTING BED ORNATIVE SEED &SOIL, PER PLANTOPSOIL, SEE NOTE 27L5.001" = 1'-0"Natural Steel Edging - Planting BedFINISH GRADENOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 3" DIAMETER)2.ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES ANDBOTTOM TO REMOVE GLAZING. ALL BEDS TO RECEIVE NEW, AMENDEDSOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL, FOR A COMBINEDSETTLED DEPTH OF 18". RAKE SMOOTH TO MATCH FINAL GRADING PLAN1" REVEALNATIVE SOIL316" X 4" NATURAL STEEL EDGINGTAC WELDED TO #4 REBAR DRIVENMIN. 18" REBAR SPACED 24" O.C.3" - 4" LAYER OF MULCH. MULCHTYPE PER PLAN.LAWN OR NATIVE SEED& SOIL, PER PLANTOPSOIL, SEE NOTE 26L5.003/4" = 1'-0"Typ. Planting BedNOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 3" DIAMETER)2.ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOMTO REMOVE GLAZING. ALL BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1"COMPOST WITH MIN. 17" NEW TOPSOIL, FOR A COMBINED SETTLED DEPTH OF 18".RAKE SMOOTH TO MATCH FINAL GRADING PLANFINISH GRADE3" - 4" MULCH LAYER,MULCH TYPE PER PLAN.DO NOT ALLOW MULCHTO COME IN CONTACTWITH SHRUB STEMSTOPSOIL, SEE NOTE 2NATIVE SOILPLANT CROWN TO BEPLANTED AT ORSLIGHTLY ABOVE FINISHGRADE AT MAXIMUM OF1"-2".SHEETS L500 LANDSCAPE DETAILS NOTES:1.LANDSCAPE CONTRACTOR SHALL ASSURE PERCOLATION OFALL PLANTING PITS PRIOR TO INSTALLATION2.ALL CONTAINMENT MATERIALS AROUND ROOT BALL TO BEREMOVED PRIOR TO INSTALLATION2.1.CAREFULLY REMOVE ENTIRE WIRE BASKETS AT PLANTING2.2.CAREFULLY REMOVE ALL TREATED BURLAP (ROT-PROOF)AT PLANTING2.3.UNTREATED BURLAP MAY PARTIALLY REMAIN ON ROOTBALL. REMOVE BURLAP FROM TOP HALF OF ROOT BALLBEFORE COMPLETION OF PLANTING3.CONTAINER PLANTS: CAREFULLY CUT ANY CIRCLING ROOTS TOPREVENT PLANT FROM BECOMING ROOT BOUND4.PRUNE ALL PLANT MATERIAL PRIOR TO PLANTING, ON AN ASNEEDED BASIS. REMOVE DEAD AND / OR DAMAGED BRANCHES,LIMBS, AND LEAVES5.ALL TREES TO BE STAKED, REMOVE STAKES AFTER TWO YEARS6.ALL DECIDUOUS TREES AND SHRUBS NOT PLANTED INFOUNDATION BEDS TO BE FENCED FOR PROTECTION FROMUNGULATES AND OTHER HERBIVORES7.PROVIDE TREE GUARDS ON ALL DECIDUOUS TREES OUTSIDE OFPLANTING BEDSSheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NBTSNO.DATEDESCRIPTION108/31/22Site Plan Review SubmissionA02/14/23Site Plan Review- RC 1B05/10/23Site Plan Review- RC 2LANDSCAPEDETAILSL-5.00