Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
091 NOTES AND LEGENDS 1
BOZEMAN, MONTANA CODE OF ORDINANCESSETBACK LANDSCAPING-REQUIRED AND PROVIDED: ALL FRONT, SIDE, AND REAR SETBACKS MUST BELANDSCAPEDDROUGHT TOLERANT SPECIES-REQUIRED: A LANDSCAPE PLAN MUST PROVIDE 75% OF GREATER OF THE PROPOSEDTREES AND SHRUBS AS DROUGHT TOLERANT SPECIES.-PROVIDED: THE OVERALL LANDSCAPE PLAN PROVIDES 79% OF THE PROPOSED TREESAND SHRUBS AS DROUGHT TOLERANT SPECIES FOR PLANTINGS ON SITE. SEE SHEETL001 FOR PLANT SCHEDULES THAT IDENTIFY ALL PROPOSED DROUGHT TOLERANTTREES AND SHRUBSSERVICE ENCLOSURES LANDSCAPINGREQUIRED & PROVIDED: LANDSCAPE SCREENING AT LEAST 5 FEET IN WIDTH IS PROVIDED.STREET FRONTAGE LANDSCAPINGSTREET FRONTAGE FOR NORTH 27TH AVENUE: 690 LF = 14 TREESSTREET FRONTAGE FOR TSCHACHE LN: 409 LF = 8 TREESSTREET FRONTAGE FOR TURBULENCE LN: 928 LF = 19 TREESSTREET FRONTAGE FOR NORTH 25TH AVENUE: 2,023 LF = 41 TREESSTREET FRONTAGE FOR TRADE WIND LN: 253 LF = 5 TREES-REQUIRED: ONE LARGE CANOPY TREE FOR EACH 50 FEET OF TOTAL STREETFRONTAGE ROUNDED TO THE NEAREST WHOLE NUMBER.-PROVIDED:--14 TREES FOR NORTH 27TH AVENUE--11 TREES FOR TSCHACHE LN--15 TREES FOR TURBULENCE LN(275 LF IN CONFLICT WITH UTILITIES)--30 TREES FOR NORTH 25TH AVENUE(857 LF IN CONFLICT WITH UTILITIES)--5 TREES FOR TRADE WIND LNPARKING LOT LANDSCAPING-REQUIRED AND PROVIDED:ALL PARKING LOTS LOCATED BETWEEN A PRINCIPALSTRUCTURE AND A PUBLIC STREET, MUST BE SCREENED FROM THE PUBLIC STREET.SCREENING MUST BE CONTINUOUS AND NOT LESS THAN FOUR FEET IN WIDTH.SCREENING MUST BE MAINTAINED AT A HEIGHT OF FOUR TO SIX FEET-REQUIRED:--A) ONE LARGE CANOPY TREE; OR B) ONE LARGE NON-CANOPY TREE AND ONESMALL TREE; OR C) THREE SMALL TREES FOR EACH NINE PARKING SPACESREQUIRED OR PROVIDED--TREES MUST BE IN OR WITHIN 20 FEET OF THE PARKING LOT--NO PARKING SPACE SHALL BE LOCATED MORE THAN 70 FEET FROM THE TRUNKOF A TREE--NO TREE SHALL BE PLANTED CLOSER THAN THREE FEET TO THE BACK OF THECURB OR EDGING EQUIVALENT368 PARKING SPACES =368 TOTAL PARKING SPACES IN PARKING LOT368 ÷ 9 = 42 OF A) B) AND / OR C) LISTED ABOVE-PROVIDED:--45 LARGE CANOPY TREES / WITHIN 20 FEET OF THE PARKING LOT (10 OF A) B) AND/ OR C) LISTED ABOVE)--ALL PARKING SPACES ARE LOCATED WITHIN 70 FEET OF THE TRUNK OF A TREE-REQUIRED: ANY PARKING LOT PROVIDING 15 OR MORE PARKING SPACES MUST HAVE AMINIMUM OF 20 SQUARE FEET OF LANDSCAPE AREA WITHIN THE PARKING LOT FOREACH OFF-STREET PARKING SPACE IN THE LOT368 X 20 = 7,360 SQUARE FEET OF LANDSCAPE AREA WITHIN THE PARKING LOT-PROVIDED: 8,861 FT² OF LANDSCAPING WITHIN THE PARKING LOT PROVIDEDBICYCLE PARKING-REQUIRED: MINIMUM OF 10% BIKE PARKING TO BE PROVIDED FOR AMOUNT OFVEHICLE PARKING STALLS (557 VEHICLE STALLS X 10% = 58 PARKING SPACES)-PROVIDED: 46 EXTERIOR, 66 INTERIOR = 112 BICYCLE PARKING SPOTSUTILITY METERS LANDSCAPING-REQUIRED AND PROVIDED: IF SUCH ELEMENTS ARE MOUNTED IN A LOCATION VISIBLEFROM THE STREET, PEDESTRIAN PATHWAY, SHARED OPEN SPACE, OR SHARED AUTOCOURTYARDS, THEY MUST BE SCREENED WITH VEGETATION AND / OR INTEGRATEDINTO THE BUILDING'S ARCHITECTURECRUSHER FINES TRAILPER PLANAPPROX.5,169 SF1,360 LFSITE HATCH SCHEDULEROCK BARK MULCH*ALL STONE MULCH TO BE WASHED PRIOR TO INSTALLATIONPER PLAN56,878 SFRECOMMENDED NATIVE/UPLAND LOW MOISTURE SEED MIXPARADISE SHEEP FESCUE (FESTUCA OVINA "PARADISE")HARD FESCUE (FESTUCA TRACHYPHYLLA "SWORD")BOREAL RED FESCUE (FESTUCA RUBRA "BOREAL")PER PLAN83,200 SFSYMBOL% PLSNOTESQUANTITYDETENTION POND WETLAND SEED MIXTHICKSPIKE WHEATGRASS 'CRITANA'(ELYMUS LANCEOLATUS)STREAMBANK WHEATGRASS 'SODAR'(ELYMUS LANCEOLATUS 'SODAR')IDAHO FESCUE (FESTUCA IDAHOENSIS)WESTERN WHEATGRASS 'ROSANNA'(PASCOPYRUM SMITHII)PER PLAN86,600 SF33%33%33%30%40%5%25%SOD BLENDTURF TYPE FESCUE BY GALLATIN VALLEY SODFESCUE BLENDPER PLAN4,750 SFSEED RATE4 LBS/ACRE4 LBS/ACREMELVILLE PLANK(POOL DECK AND CLUBHOUSE)BELGARD BRAND40% SLIM, 60% LARGE, RIO COLOR; SEE L5.01 DETAIL 3PER PLAN6,835 SFPOOLDECK &CLUBHOUSESYNTHETIC TURFSYNLAWN BRAND OR XGRASSPRODUCT: TBDSEE L5.02, DETAIL 3PER PLAN1,663 SFPLAYGROUND SURFACINGTBD:PRODUCT: TBDPER PLAN1,410 SF*NOTE:FINAL STEEL PLANTER LAYOUT AND DETAILING OF GROUND PLANEINTERFACE TO BE COORDINATED FOR FINAL IFC DOCUMENTS AND 100%CDLANDSCAPE INSTALL NOTESGENERAL1.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TOBEGINNING WORK. CALL 811.2.PLACE TREES, SHRUBS, AND PLANT MATERIAL WITH LANDSCAPE ARCHITECT PRESENT. LANDSCAPEARCHITECT TO BE NOTIFIED 48 HOURS IN ADVANCE.3.PLACE ALL BOULDERS WITH LANDSCAPE ARCHITECT PRESENT.LANDSCAPE ARCHITECT TO BE NOTIFIED 48HOURS IN ADVANCE.4.THE LOCATION OF ALL FLAGSTONE, STEPS, AND PATIO AREAS SHALL BE COORDINATED ON SITE WITH THELANDSCAPE ARCHITECT, WHEN APPLICABLE.5.ALL PLANT MATERIAL SHALL CONFORM TO THE CURRENT AMERICAN STANDARD FOR NURSERY STOCK.6.VERIFY ALL QUANTITIES. ILLUSTRATED PLAN SHALL DICTATE COUNT.7.NO SUBSTITUTIONS WILL BE ALLOWED WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE ARCHITECT.ALL REQUESTS SHOULD BE SUBMITTED TO DESIGN 5 LANDSCAPE ARCHITECTURE. 406-587-4873 ORTROY@DESIGN5LA.COM.8.LANDSCAPE ARCHITECT SHALL MEET WITH LANDSCAPE CONTRACTOR ON SITE, AT PREDETERMINEDINTERVALS TO DISCUSS PROGRESS, QUESTIONS, AND PRODUCT PLACEMENT.9.ALL EDGING SHALL BE 316" X 4" NATURAL STEEL ON STRAIGHT RUNS AND 18" X 4" NATURAL STEEL FORCURVED RUNS (OR AS OTHERWISE SPECIFIED IN DETAILS). TAC WELD TO #4 REBAR DRIVEN A MINIMUM OF18" DEEP.10.ALL AREAS ON SITE DISTURBED BY CONSTRUCTION ACTIVITIES NOT INDICATED ON LANDSCAPE PLAN ARETO BE RECLAIMED AND RE-ESTABLISHED TO PRE-DISTURBANCE CONDITION, VERIFY DISTURBANCE AREASIN FIELD. CONTRACTOR IS RESPONSIBLE FOR THE COST OF RESTORING ANY DISTURBANCE OUTSIDE OFTHE AGREED UPON LIMIT OF WORK BOUNDARY INDICATED ON THE PLANS.SITE SOIL PREP11.ALL BACKFILLED AND DISTURBED AREAS TO BE RAKED SMOOTH. ALL ROCKS GREATER THAN 3" DIAMETERAND ALL CONSTRUCTION DEBRIS TO BE PICKED UP AND REMOVED FROM SITE BEFORE SOIL AMENDMENTSARE ADDED.12.SEED AREAS(WHEN APPLICABLE)- LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.-SEEDED AREA AMENDED TOPSOIL: MIX 1" COMPOST WITH MIN. 3" NEW TOPSOIL (COMBINED SETTLEDDEPTH OF 4"). HYDROSEED WITH *FLEXTERRA TACKIFIER*. ADD EROSION CONTROL MAT TO ALL AREASWITH SLOPES STEEPER THAN 3:113. SOD AREAS (WHEN APPLICABLE) - LIGHTLY SCARIFY SURFACE OR LIGHTLY TILL AND RAKE SMOOTH PRIORTO ADDING SOIL.-SOD AREA AMENDED SOIL: MIX 1" COMPOST WITH MIN. 5" NEW TOPSOIL (COMBINED SETTLED DEPTH OF6"). TOPSOIL SHALL BE DRUM ROLLED OR TRACK-PACKED AND GRADED SMOOTHLY AND EVENLY PRIORTO LAYING SOD. RAKE SMOOTH TO MATCH FINAL GRADING PLAN.14. ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES AND BOTTOM TO REMOVE GLAZING.15. ALL PLANTING BEDS TO RECEIVE NEW, AMENDED SOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL (COMBINED SETTLED DEPTH OF 18") TO PROMOTE PLANT GROWTH. RAKE SMOOTH TO MATCH FINALGRADING PLAN.16. ALL PLANTING BEDS SHALL HAVE A WEED BARRIER INSTALLED BETWEEN THE SOIL AND COVERING LAYER OF ROCK OR MULCH PER PLAN. DRIP IRRIGATION SHALL BE PLACED ABOVE WEED FABRIC, BUT UNDERMULCH AND PINNED IN PLACE.PLANTING17. ALL TREES SHALL BE STAKED FOR A MINIMUM OF 2 YEARS. REMOVE STAKES AFTER 2 YEARS.18. ALL TREES AND OTHER SIGNIFICANT LANDSCAPING FEATURES MUST BE PLANTED A MINIMUM OF 10' OF SEPARATION FROM WATER AND SEWER SERVICES.19. ALL TREES TO HAVE A 3' DIAMETER CEDAR BARK MULCH RING AROUND BASE OF TREE AT TIME OFINSTALLATION TO HELP PROMOTE HEALTH AND GROWTH. ALL TREES TO RECEIVE INDIVIDUAL DRIPIRRIGATION ADJUSTED PER SPECIES FOR ESTABLISHMENT.20. RECOMMENDED TO PLACE 6" DIAMETER PLASTIC TREE GUARD AROUND BASE OF ALL TREES TO PROTECTFROM TRIMMER AND MOWER DAMAGE DURING MAINTENANCE.IRRIGATION21. PERMANENT UNDERGROUND IRRIGATION SYSTEM TO BE INSTALLED AT TIME OF LANDSCAPE INSTALLATION. MAIN LINE, LATERAL LINE, AND SPRINKLERS NOT BURIED AT TIME OF PROJECT COMPLETION WILL NOT BE ACCEPTED.22. IRRIGATION TO BE INSTALLED IN ACCORDANCE WITH ALL STATE AND LOCAL CODES AND ORDINANCES.45'20'-25'TREESSYMB.SIZETYPESPACING#POPULUS SONGARICASONGARICA POPLAR2.5" CALB & BPER PLAN16POPULUS ACUMINATALANCELEAF POPLAR2.5" CALB & BPER PLAN16MATUREHEIGHT50'-60'MATURESPREAD20'-40'SALIX LUTEAYELLOW WILLOWPOTPER PLAN2010'-25'6'-10'POTPER PLAN446'-12'6'-8'SALIX GEYERIANA GEYER WILLOWB & BPER PLAN5315'8'PRUNUS VIRGINIANA NATIVE CHOKECHERRYSHRUBS5'B&BPER PLAN568'-15'6'-10'ALNUS VIRIDIS GREEN ALDER6'-8'5 GAL5 GALSIOBOTANICAL NAMECOMMON NAME5 GALPOTPER PLAN516'-9'6'-10'CORNUS SERICEA RED OSIER DOGWOOD10'-30'8'-15'BETULA NIGRARIVER BIRCH2.5" CALB & BPER PLAN172.5" CALB & BPER PLAN96'-10'20'-25'CRATAEGUS DOUGLASII BLACK HAWTHORNWETLAND SETBACK/ENHANCEMENT, RETENTION POND, & WATERCOURSE PLANT SCHEDULE10'40'-75'10'-25'PICEA PUNGENSCOLORADO SPRUCE10' & 12'PER PLANB & BPER PLAN8OTHER3'X3' MINROCKPER PLAN21NANAFLAT WILLOW BOULDERSACCENT BOULDERSBOZEMAN, MONTANA TSCHACHE PROJECT CASH AND IMPROVEMENTS IN LIEU OF CALCS3.81 ACRES OF CIL IS THE MAX DEDICATION FOR THIS ZONING (UP TO 12 DWELLING UNITS/ACRE).3.81 ACRES X 43,560 SF X $2.60= $431,505.36 DUE TO THE CITY AS CILSUBDIVISION TRAIL IIL:6' GRAVEL FINES TRAIL COST ESTIMATE= $8.50/LF(822LF)= $6,987ADDED BENCHES ON CONCRETE PADS= $7,500TOTAL IIL COST= $14,487WEST WINDS BIKE TRAIL:8' WIDE 6" DEEP CONCRETE BIKE PATH= 18.00/SF(5,000 SF) = $90,000BRIDGE (TBD) = 1,500/LF(22LF)= $33,00016 DECIDUOUS TREES TO HELP ENHANCE TRAIL($650/TREE)= $10,400TOTAL IIL COST= $133,400COMBINED IIL COST: $147,887431,505.36 - 147,887 = $ 283,618.36 CIL OWED TO C.O.B.WATERCOURSE SETBACK PLANTING350' LINEAL FT OF WATERCOURSEREQUIRED: 1 SHRUB FOR EVERY 10 LINEAR FT = 35 SHRUBS1 TREE FOR EVERY 30 LINEAR FT = 12 TREESPROVIDED: 52 SHRUBS AND 25 TREES WITHIN 25' OFWATERCOURSE THAT PASSES THROUGH SITESheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NBTSNO.DATEDESCRIPTION108/31/22Site Plan Review SubmissionA02/14/23Site Plan Review- RC 1B05/10/23Site Plan Review- RC 2NOTES ANDLEGENDSL-0.01NOTE: SEE L3.09 FOR CONCEPT ILL LANDSCAPE PLAN- WEST WINDS BIKE PATHRC-2RC-2RC-2RC-2RC-2 REVISIONS:- PLANTINGS ADJUSTED FOR SITE CHANGES AS NEEDED, ADDITIONAL SHRUBSINCREASED DROUGHT TOLERANT LANDSCAPE PERCENTAGE- THREE (3) EXTERIOR BIKE RACKS REMOVED FOR CLEAR ACCESS TO FIREDEPARTMENT CONNECTION(FDC) WITH 3' MIN CLEAR CONCRETE PATH ATREQUEST OF THE C.O.B. FIRE MARSHALL- IIL BIKE PATH MATERIAL CHANGE FROM ASPHALT TO CONCRETE PER C.O.B.PARKS AND TRANSPORTATION REQUESTS