Loading...
HomeMy WebLinkAbout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heetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NO.DATEDESCRIPTIONSITE PLAN REVIEW - RC 102.17.2023ASITE PLAN REVIEW SUBMISSION08.31.20224SITE PLAN REVIEW - RC 205.10.2023BPROPOSED 24'PRIVATE UTILITY EASEMENTPROPOSED 60'PUBLIC UTILITYAND ACCESS EASEMENTRH-3RH-4RH-5RH-6RH-8RH-11RH-12SU-2SU-3SITE PLAN RC-2 05/2023 PROPOSED 60' PUBLIC UTILITYAND ACCESS EASEMENTPROPOSED 10'PRIVATE UTILITYEASEMENTPROPOSEDSTORMWATERDETENTION PONDPROPOSED 30'PRIVATE UTILITY EASEMENTPROPOSED 10' PRIVATEUTILITY EASEMENTPROPOSED 30'PRIVATE UTILITY EASEMENTPROPOSED LIGHTPOLE (TYP.)PROPOSED LIGHTPOLE (TYP.)PROPOSED LIGHTPOLE (TYP.)PROPOSED STREETINTERSECTIONPROPOSED STREETINTERSECTIONPROPOSED STREETINTERSECTIONPROPOSED STREETINTERSECTIONCONSTRUCTION INCONSTRUCTION OUTCONSTRUCTION OUTCONSTRUCTION INTEMPORARY GRAVELCONSTRUCTION ENTRANCETEMPORARY GRAVELCONSTRUCTIONENTRANCECONSTRUCTION INCONSTRUCTION OUTCONSTRUCTION IN CONSTRUCTION OUTPROPOSED 25'PUBLIC ACCESS EASEMENTB