Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
016 EROSION, SEDIMENT CONTROL PLAN 2
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWBPBPBPBPNGSSSSSSSSSSSSSOOOOOOOOOOOOOOOO21 2627 28 29 30 31 32 33 204 1604230 SSSSSS22201 WWWWWWWWWWWWWW BFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBPBP BP BP BPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNG NG NG NG NG NGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGBF BF BF BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTVBTVBTVBTVBTVBTVBTVBTVBTVBTVOHPOHPOHPOHPOHPOHPOHPBTVBTVBTVBTVBTVBTVBFBFBFBFNG NG NG NG NG NGNGBTVBTVBFBFBPBPBPBPBPBF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BFBFBF BPBTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTVBP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BPBTBTBTBTBTBTBTBTBT BT S D SD SD BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV S S S S S S S S S S S S S SSD SD BTVSD W W W WBF BFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPTVPEFDETESTPTDESTTVPPDBTVSWWWWWW>>>>>>>>>>>>>>>>>>>>>>>8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8S8S8S8S8S8S8S8S8S8S8W8W8W8W8W8W8W8W8W8W8W8WNGNGNGNGBPBPBPBPBPBPSSSSSSS24SD12SD>>>>>>>18SD18SD18SD18SD12SD12SD12SD15SD15SD15SD15SD12SD12SD8SDSSSSWSWS WS FS FS FSWSSSSSS12SD12SD>6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD>>>6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD6SD FSSS>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>W24SD24SD24SD24SD24SD15SD15SD15SD15SD15SD15SD18SD18SD18SD18SD18SD18SD24SD FSWS8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8SWSWSWSWSWSWSWSWSWS FSSSSS8SD12SD6SD6SD6SD6SD12SD12SDNGNGNGNGNGNGNGNGNGNGNGBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGBFBFBFBFBFBFBFBFBFBFBFBPBPBPBPBPNGNGNGNGBFBFBFBFBFBPBPBPBPBPBPBFBFBFBFNGNGNGBPBPBPBPBPBPBPBPBPBPBPBFBFBFBFBFBFBFBFBFNGNGNGNGNGNGNGBPBPNGNGBPNGNGNGNGNGNGNGNGNGNGNGNGNGNGNG FS6SD6SDBFBFNGNGBPBPBPBPBPBPBPBPBPBPBFBPNGBPBPBPBPBPBPBPBPBPBPBPBPBFNGSS8S8S8SNGBPBPBPBPBPBFBFBFBFBFNGNGNGBPBPBPBPNGNGNGNGNG FSWSWS FSWSWS FSWSWS FS FSWS FSWS8SD8SD FSWS FSWS8SDWS FSSSWS FSSS8SD8SD8SD8SD8SDBP6SD4738 4736 47344732 4732 4732 474247404740473847364734 47324730472847264 7 2 4 4724 4722 4722 4724 4724SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>5010025500SCALE IN FEETEROSION, SEDIMENTCONTROL PLAN 2 WEHC2-4SheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NO.DATEDESCRIPTIONSITE PLAN REVIEW - RC 102.17.2023ASITE PLAN REVIEW SUBMISSION08.31.20224SITE PLAN REVIEW - RC 205.10.2023BFLAT 1 (FL-1)FLAT 2 (FL-2)FLAT 3 (FL-3)AM-1(CLUBHOUSE)AM-3(GEARGARAGE)RH-1RH-2RH-7RH-9RH-10SU-1RH-3RH-4RH-5RH-6RH-8RH-11RH-12SU-2SU-3TRACT 1COS 1256A14.42 ACRESZONING : R -4KEY NOTESINSTALL INLET PROTECTION BMP FOLLOWING COMPLETION OF NEW STORM DRAIN INLET PER DETAIL, DRAWING C1-130 CY ROLL-OFF DUMPSTERS21CONCRETEWASHOUTAREAPROPERTYBOUNDARY(TYP.)EXISTINGSTORMWATERRETENTIONPONDSSILT FENCE INSTALLED INSEQUENCE 1SILT FENCEINSTALLED INSEQUENCE 1TEMPORARY GRAVELCONSTRUCTION ENTRANCEINSTALLED IN SEQUENCE 4.TEMPORARY GRAVELCONSTRUCTION ENTRANCEINSTALLED IN SEQUENCE 1.INSTALL INLET PROTECTIONPER DETAIL, DRAWING C1-1PRESERVE NATURALGRASS BUFFER WITHIN 50'OF WETLANDEROSION & SEDIMENT CONTROL NOTES:1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 7TH EDITION DATED APRIL 2021 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THEMPWSS; AND THE PROJECT SPECIFICATIONS.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURES SHALLBE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WIND BLOWNSEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TO CONTROLON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL,STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE END OF EACHWORKING DAY.EXISTING WETLAND.TO BE PROTECTED.PRESERVE NATURALGRASS BUFFER WITHIN 50'OF WETLAND11111111111111111111111111111N 25TH AVE.TURBULENCE LANESITE PLAN RC-2 05/2023 1111111EXISTING"BAXTERAPARTMENTS"DEVELOPMENTJOB TRAIL E R TEMPORARY GRAVELCONSTRUCTION ENTRANCEINSTALLED IN SEQUENCE 2.TEMPORARY GRAVELCONSTRUCTION ENTRANCEINSTALLED IN SEQUENCE 3.SEQUENCE 4SEQUENCE 3SEQUENCE 2SEQUENCE 1TOPSOILSTOCKPILE2222PORTA POTTYTEMPORARYSANITARYFACILITYTSCHACHE LANEN 27TH AVE.BAXTER LANETRADE WIND LANEMATERIALS &EQUIPMENTSTORAGE AREAMATERIALS &EQUIPMENTSTORAGE AREAMATERIALS &EQUIPMENTSTORAGE AREAMATERIALS & EQUIPMENTSTORAGE AREA