Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
015 EROSION, SEDIMENT CONTROL PLAN 1
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWBPBPBPBPNGSSSSSSSSSSSSSSOOOOOOOOOOOOOOOO21 2627 28 29 30 31 32 33 204 1604230 SSSSSSCO22201 WWWWWWWWWWWWWW BFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBPBP BP BP BPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNG NG NG NG NG NGNGNGNGNGNGNGNGNGNGNGNGNGNGNGNGBF BF BF BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTVBTVBTVBTVBTVBTVBTVBTVBTVBTVOHPOHPOHPOHPOHPOHPBTVBTVBTVBTVBTVBTVBFBFBFBFNG NG NG NG NGNGBTVBTVBFBFBPBPBPBPBPBF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BF BFBFBF BPBTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTV BTVBP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BPBTBTBTBTBTBTBTBTBT BT SDSD SD BTVBTV BTV BTV BTV BTV BTV BTV BTV BTV S S S S S S S S S S S S S SSD SD BTVSD W W W WBF BFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFBFOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPTVPEFDETESTPTDESTTVPPDBTVSWWWWWWNGNGNGNGNGNGNGNGS89°39'17"W 661.13'N1°27'25"E 833.73'N89°45'16"W 413.83'S1°28'13"W 320.88'S89°53'55"W 247.21'S1°28'13"W 482.48'S1°27'31"W 666.81'SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFS F SFSFSFSFSFSFSFSFSFSFSFSFSFSF5010025500SCALE IN FEETEROSION, SEDIMENTCONTROL PLAN 1CCFWEHC2-3SheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NO.DATEDESCRIPTIONSITE PLAN REVIEW - RC 102.17.2023ASITE PLAN REVIEW SUBMISSION08.31.20224SITE PLAN REVIEW - RC 205.10.2023BTRACT 1COS 1256A14.42 ACRESZONING : R -4PROPERTYBOUNDARY(TYP.)EXISTINGSTORMWATERDETENTIONPONDINSTALL SILT FENCE ALONGWETLAND SETBACK.INSTALL SILT FENCE ALONGPROPERTY BOUNDARY. SEEDETAIL, DRAWING C1-1EXISTING WETLAND.TO BE PROTECTED.INSTALL SILT FENCE ALONGPROPERTY BOUNDARY. SEEDETAIL, DRAWING C1-1INSTALL TEMPORARYGRAVEL CONSTRUCTIONENTRANCE. SEE DETAIL,DRAWING C1-1INSTALL SILT WATTLE INDRAINAGE DITCH. SEEDETAIL, DRAWING C1-1INSTALL INLET PROTECTIONPER DETAIL, DRAWING C1-1NATURAL VEGETATIVEBUFFER WITHIN 50' OFWETLANDEROSION & SEDIMENT CONTROL NOTES:1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 7TH EDITION DATED APRIL 2021 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONSTO THE MPWSS; AND THE PROJECT SPECIFICATIONS.2.ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED EROSION CONTROL MEASURESSHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND STORMWATER MANAGEMENT PLAN.3.AT ALL TIMES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY WATERED SO AS TO MINIMIZE WINDBLOWN SEDIMENT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN HEREIN.4.PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S) REQUIRED FOR IMMEDIATE CONSTRUCTIONOPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME.5.CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT IS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE DETERMINED NECESSARY TOCONTROL ON-SITE EROSION.6.ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY APPROPRIATE EROSION CONTROL METHODS. ANY SOIL STOCKPILE THAT WILL BE DORMANT FOR OVER THIRTY (30) DAYS SHALL BE SEEDED.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLELOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS OR OTHER PUBLIC RIGHTS OF WAY, AND MAKE SURE STREETS ARE CLEANED AT THE ENDOF EACH WORKING DAY.NATURAL VEGETATIVE BUFFERMATERIALS & EQUIPMENTSTORAGE / STAGING AREATEMPORARY 30CY ROLL OFF JOBSITE DUMPSTERJOB SITE TRAILERTEMPORARYSANITARYFACILITYCONCRETEWASHOUTAREAEXISTING WETLAND.TO BE PROTECTED.SITE PLAN RC-2 05/2023 EXISTING"BAXTERAPARTMENTS"DEVELOPMENTINLETPROTECTIONTSCHACHE LANEN 27TH AVE.BAXTER LANETRADE WIND LANE