Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
002 CONSTRUCTION TRAFFIC ROUTE MAP
TSCHACHE LN OAK STINTERSTATE9019THAVEN19THAVENTOPROPOSEDSITEBAXTERLNAVEN27TH LEGENDCONSTRUCTIONTRAFFIC -ENTERINGCONSTRUCTIONTRAFFIC - EXITING2004001002000SCALE IN FEET1.ALL IMPROVEMENTS ON THIS PROJECT SHALL BE COMPLETED IN ACCORDANCE WITH THE MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS, 7TH EDITION DATED APRIL 2021 (MPWSS); THE CITY OF BOZEMAN MODIFICATIONS TO THE MPWSS; AND THE PROJECT SPECIFICATIONS.2.CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL REGULATIONS (OSHA) SAFETY STANDARDS. IF REQUESTED BY THE INSPECTOR, THE CONTRACTOR SHALL PROVIDE PROOF OF A PERMIT FROM SAID DIVISION.3.THE CONTRACTOR'S OPERATIONS SHALL BE CONFINED WITHIN THE PROJECT LIMITS. MATERIALS AND EQUIPMENT SHALL BE STORED ON THE PROJECT SITE WHERE APPROVED BY THE OWNER. IT SHALL BE UNDERSTOOD THAT THE RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OFEQUIPMENT AND MATERIALS ON OR NEAR THE SITE WILL BE ENTIRELY THAT OF THE CONTRACTOR AND THAT NO CLAIM SHALL BE MADE AGAINST THE OWNER BY REASON OF ANY ACT OF AN EMPLOYEE OR TRESPASSER.4.THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE CITY, COUNTY, AND/OR STATE INSPECTOR 48 HOURS PRIOR TO COMMENCING CONSTRUCTION AND 24 HOURS IN ADVANCE OF SPECIFIC INSPECTION NEEDS DURING THE COURSE OF THE WORK. ALL WORK SHALL BE PERFORMEDDURING NORMAL WORKING HOURS AND SUBJECT TO THE AVAILABILITY OF AN INSPECTOR AND APPROVED BY THE ENGINEER. THE CONTRACTOR WILL BE BILLED FOR SAID INSPECTION SERVICES AS PROVIDED IN THE MOST RECENTLY ADOPTED FEES FOR SUCH SERVICES.5.THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN A MANNER TO MINIMIZE INCONVENIENCE TO THE ADJACENT BUSINESSES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PUBLIC AND PRIVATE PROPERTY INSOFAR AS IT MAY BE AFFECTED BY THESE OPERATIONS, ALL COSTS FOR PROTECTING, REMOVING, AND RESTORING EXISTING IMPROVEMENTS SHALL BE BORNE SOLELY BY THECONTRACTOR.7.THE CONTRACTOR SHALL AT ALL TIMES TAKE WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL REGULATIONS.8.THE CONTRACTOR SHALL IMMEDIATELY CLEAN UP ANY CONSTRUCTION MATERIALS INADVERTENTLY DEPOSITED ON EXISTING STREETS, SIDEWALKS, OR OTHER PUBLIC RIGHTS-OF-WAY AND MAKE SURE STREETS AND WALKWAYS ARE CLEANED AT THE END OF EACH WORKING DAY.9.CONSTRUCTION WORK ZONE TRAFFIC SIGNS SHALL BE FURNISHED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF THE REGULATORY AGENCIES HAVING JURISDICTION. A TRAFFIC CONTROL PLAN, PREPARED BY THE CONTRACTOR, MAY BE REQUIRED BYTHE CITY OR STATE. "CONSTRUCTION AHEAD" WARNING SIGNS ARE TO TO BE INSTALLED ALONG ADJACENT ROADS OR DRIVEWAYS. FLASHERS WITH CAUTION TAPE ARE TO BE INSTALLED WHERE ANY CONSTRUCTION ACTIVITY CROSSES A SIDEWALK OR PEDESTRIAN PATH IN ACCORDANCEWITH THE SPECIFICATIONS AND ANY OR ALL LOCAL REGULATIONS.10.NO STOPPING, PARKING, OR STORING OF CONSTRUCTION MATERIALS IN THE PUBLIC STREETS /ROADS, RIGHTS-OF-WAY, OR ANY DRIVEWAY IS ALLOWED.11.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THAT THERE IS A CONSTRUCTION PERMIT APPROVED BY THE MONTANA DEPARTMENT OF ENVIRONMENTAL QUALITY (MDEQ) OR LOCAL GOVERNING AGENCY AS APPROPRIATE FOR THE CONTROL OF STORM WATER RUNOFF. IF THERE IS NOT ANAPPROVED PERMIT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE NECESSARY APPROVALS FROM MDEQ OR THE LOCAL GOVERNING AGENCY.12.CONTRACTOR IS RESPONSIBLE FOR PROJECT DUST CONTROL.GENERAL NOTES:CONSTRUCTIONTRAFFIC ROUTEMAPCCFWEHC0-2SheetNumber:© 2022 Solomon Cordwell BuenzProjectNumber:Drawn By:Checked By:Tschache Lane & 27 Ave.Bozeman, MT 597182695 Tschache Lane2022001.000NO.DATEDESCRIPTIONSITE PLAN REVIEW - RC 102.17.2023ASITE PLAN REVIEW SUBMISSION08.31.20224SITE PLAN REVIEW - RC 205.10.2023BSITE PLAN RC-2 05/2023