Loading...
HomeMy WebLinkAbout034 ELECTRICAL SITE PLANS S S HY DW ST WVSNOW STORAGE 69.10 269°46'02"30.00179°46'02"68.91 89°46'02"30.00109.7427.50 18.09180°08'02"105.50 270°08'02"52.500°08'02"163.42 270°08'02" 163.84 270°08'02"17.5025.009.89 44°59'17" 161.26 89°59'17" 32.35 359°54'26" 131.38 269°59'17" 30.0'10.00PHASE 3D6030 STAFFORD AVENUEEX. SSMH RIM: 4799.56 FL IN (W): 4786.17 FL IN (S):4786.17 FL IN (E):4786.17 FL OUT (N):4786.07 EX. STORM INLET TBC: 4799.62 FL OUT (W):4797.37(15") EX. SSMH RIM: 4802.30 FL IN (S): 4788.88 FL IN (E):4788.83 FL OUT (N):4788.75 EX. SSMH RIM: 4803.90 FL OUT (N):4795.20 (15") 4795.66(15") HYDRANT ARROW BOLT ELEV: 4808.01 ELEC. BOX EX.SIDEWALKEX.SIDEW ALKEX.SIDEWALKFND. 5/8" REBAR WITH YPC MARKED "MORRISON-MAIERLE" FND. 5/8" REBAR WITH RPC MARKED "MORRISON-MAIERLE"365.00 180°08'02"[S0°08'02"W]300.04 270°08'02" [N89°51'58"W] 163.12 090°08'02" [S89°51'58"E]45.00 180°08'02"[S0°08'02"W]130.00 090°08'02" [S89°51'58"E] SANITARY SEWER END CAP BENCHMARK LOT 4 13,585 SF LOT 6 55,236 SF LOT 5 11,118 SF 25.0' PUBLIC ACCESS EASEMENT 30.0' PUBLIC UTILITY EASEMENT 20.0' UTILITY EASEMENT EASEMENT 10.0' UTILITY EASEMENT 10.0' UTILITY EASEMENT SNOW STORAGE STOP STREET SIGN BENCHMARK CP #50 SET 5/8" REBAR WITH RPC ELEV: 4800.86 BENCHMARK CP #51 SET NAIL ELEV: 4800.16 139.43 270°08'02" 139.50 090°08'02"97.41 000°08'02"97.41 180°08'02"J GENERAL NOTES A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE CODES/STANDARDS. B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE BRANCH CIRCUITS. BUILDING FOOTPRINT 4930 SF EXISTING PRIMARY JUNCTION CAN EXISTING TELECOM PEDESTAL 2 3 6 4 7 1 5 1A-36 1"C, 2#10 1#10 GND #KEYNOTES 1. NEW UNDERGROUND PRIMARY ELECTRICAL SERVICE TO BE INSTALLED BY NORTHWESTERN ENERGY (NWE). ELECTRICAL CONTRACTOR TO COORDINATE SERVICE INSTALLATION. 2. NOTESNEW PAD MOUNT TRANSFORMER TO BE INSTALLED BY NWE. PROVIDE PAD PER NWE REQUIREMENTS. 3. NEW UNDERGROUND SECONDARY ELECTRICAL SERVICE. PROVIDE (2) 3' SCHEDULE 40 PVC CONDUITS. CONDUCTORS PROVIDED BY NWE. 4. PROVIDE CT ENCLOSURE AND METER BASE PER NWE REQUIREMENTS. 5. NEW UNDERGROUND TELEPHONE/INTERNET/CABLE TV SERVICES. PROVIDE (2) 2' SCHEDULE 40 PVC CONDUITS PER SERVING UTILITY REQUIREMENTS. COORDINATE TERMINATION LOCATION WITH UTILITY. 6. SERVICE DISCONNECT SWITCH. SEE ONE-LINE DIAGRAM FOR REQUIREMENTS. 7. PROVIDE A 1" CONDUIT WITH PULL STRING TO PANEL 1A FOR FUTURE MONUMENT SIGN LIGHTING. REVISIONS 3/24/2023 2:01:59 PM ELECTRICAL SITE PLAN E100 03.24.2023 © 2023 | ALL RIGHTS RESERVED SITE PLAN SUBMITTALBHHS BOZEMAN OFFICEBERKSHIRE HATHAWAY HOME SERVICES | Project# BERKH_BZN | L:\ PROJ# | BERKH_BZN DESIGNED BY | MAEHL DRAWN BY | GALLI REVIEWED BY | MAEHL 1" = 20'-0"E100 1 ELECTRICAL SITE PLAN NORTH M AONTAN PAROFESSIONLERNGINEECARL J. MAEHL 10488 PE L DICE N S E