Loading...
HomeMy WebLinkAbout015 P104 Phase IV Site PlanWEST M AI N S T R E E T PURE BARRE T PHASE IV SITE PLAN P104 1 P104 GALLATIN CROSSING - PHASE IV SITE PLAN NTS COPYRIGHT C THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE DESIGN THEY REPRESENT ARE THE SOLE PROPERTY OF COLLABORATIVE DESIGN ARCHITECTS. THESE DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE SITE INDICATED. ANY USE, REPRODUCTION, MODIFICATION OR ADAPTATION WITHOUT THE EXPRESS WRITTEN CONSENT OF ARCH406 LLC or COLLABORATIVE DESIGN ARCHITECTS IS STRICTLY PROHIBITED. 2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443 www.cd-mt.com COLLABORATIVE DESIGN ARCHITECTS PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : C O L L A B O R A T I V ED E S I G N A R C H I T E C T SISSUE DATES: ARCH ITECTS PRELIMINARY NOT FOR CONSTRUCTION GALLATIN CROSSING BOZEMAN, MONTANA GALLATIN MALL GROUP JEFF KANNING AIA 2126 - - - - - - 2021 2126 - GALLATIN CROSSINGGALLATIN CROSSING NEW PARKING EXISITNG PARKING PARKING NEW PARKING PARKING UNDER CONSTRUCTION ROCKY MOUNTAIN BANKWHOLE FOODS MARKET TACO BELL PETCO TIRE RAMA (UNDER CONSTRUCTION) PARKING SUMMARY PARKING REQUIRED (STANDARD)1,688 SPACES PARKING REQUIRED (10% REDUCTION)1,519 SPACES PARKING PROVIDED 1,584 SPACES BIKE RACK PHASE IV - FALL 2024 PAD D PAD F PAD E PAD C ENTRY PLAZA HEALTHCARE 35,000 SF REMODEL INTERIORS 50,000 SF ENTRY PLAZA BIKE RACK BIKE RACK BIKE RACK PAD G NEW TRUCK DOCKS EXISTING TRUCK DOCK NEW PARKING NEW PLAZA BUS TRANSFER STATION NEW CONNECTIONS TO PARK PATHS NEW CONNECTIONS TO PARK PATHS WAITING SHELTERS INTERIOR REMODEL 50,000 SF THEATER BOOKS APPROACH MODIFICATIONS PER FUTURE TRAFFIC STUDY