HomeMy WebLinkAbout014 P103 Phase III Site PlanWEST
M
AI
N
S
T
R
E
E
T
PURE BARRE
POND
PHASE III SITE PLAN
P103
1
P103
GALLATIN CROSSING - PHASE III SITE PLAN
NTS
COPYRIGHT C
THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE
DESIGN THEY REPRESENT ARE THE SOLE PROPERTY OF
COLLABORATIVE DESIGN ARCHITECTS. THESE
DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE
SITE INDICATED. ANY USE, REPRODUCTION,
MODIFICATION OR ADAPTATION WITHOUT THE EXPRESS
WRITTEN CONSENT OF ARCH406 LLC or COLLABORATIVE
DESIGN ARCHITECTS IS STRICTLY PROHIBITED.
2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443
www.cd-mt.com
COLLABORATIVE DESIGN ARCHITECTS
PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : C O L L A B O R A T I V ED E S I G N A R C H I T E C T SISSUE DATES:
ARCH ITECTS
PRELIMINARY
NOT FOR
CONSTRUCTION
GALLATIN CROSSING
BOZEMAN, MONTANA
GALLATIN MALL GROUP JEFF KANNING AIA 2126
-
-
-
-
-
-
2021 2126 - GALLATIN CROSSINGGALLATIN CROSSING
NEW PARKING
EXISITNG PARKING PARKING
EXISITNG PARKING
PARKING UNDER
CONSTRUCTION
ROCKY MOUNTAIN BANKWHOLE FOODS MARKET
TACO
BELL
PETCO
TIRE RAMA
(UNDER CONSTRUCTION)
EXISITNG PARKING
PARKING SUMMARY
PARKING REQUIRED (STANDARD)1,649 SPACES
PARKING REQUIRED (10% REDUCTION)1,484 SPACES
PARKING PROVIDED 1,584 SPACES
BIKE RACK
PHASE III - FALL 2023
PAD D
PAD F
PAD E
PAD C
ENTRY PLAZA
HEALTHCARE
35,000 SF
NEW BUILDINGS
PAD G 3,122 SF
ENTRY PLAZA
BIKE RACK
BIKE RACK
BIKE RACK
PAD G
TRASH ENCLOSURE
DRIVE THROUGH
NEW PARKING
DRIVE TO
ADJACENT SITE
THEATER
BOOKS
APPROACH MODIFICATIONS
PER FUTURE TRAFFIC STUDY