Loading...
HomeMy WebLinkAbout014 P103 Phase III Site PlanWEST M AI N S T R E E T PURE BARRE POND PHASE III SITE PLAN P103 1 P103 GALLATIN CROSSING - PHASE III SITE PLAN NTS COPYRIGHT C THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE DESIGN THEY REPRESENT ARE THE SOLE PROPERTY OF COLLABORATIVE DESIGN ARCHITECTS. THESE DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE SITE INDICATED. ANY USE, REPRODUCTION, MODIFICATION OR ADAPTATION WITHOUT THE EXPRESS WRITTEN CONSENT OF ARCH406 LLC or COLLABORATIVE DESIGN ARCHITECTS IS STRICTLY PROHIBITED. 2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443 www.cd-mt.com COLLABORATIVE DESIGN ARCHITECTS PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : C O L L A B O R A T I V ED E S I G N A R C H I T E C T SISSUE DATES: ARCH ITECTS PRELIMINARY NOT FOR CONSTRUCTION GALLATIN CROSSING BOZEMAN, MONTANA GALLATIN MALL GROUP JEFF KANNING AIA 2126 - - - - - - 2021 2126 - GALLATIN CROSSINGGALLATIN CROSSING NEW PARKING EXISITNG PARKING PARKING EXISITNG PARKING PARKING UNDER CONSTRUCTION ROCKY MOUNTAIN BANKWHOLE FOODS MARKET TACO BELL PETCO TIRE RAMA (UNDER CONSTRUCTION) EXISITNG PARKING PARKING SUMMARY PARKING REQUIRED (STANDARD)1,649 SPACES PARKING REQUIRED (10% REDUCTION)1,484 SPACES PARKING PROVIDED 1,584 SPACES BIKE RACK PHASE III - FALL 2023 PAD D PAD F PAD E PAD C ENTRY PLAZA HEALTHCARE 35,000 SF NEW BUILDINGS PAD G 3,122 SF ENTRY PLAZA BIKE RACK BIKE RACK BIKE RACK PAD G TRASH ENCLOSURE DRIVE THROUGH NEW PARKING DRIVE TO ADJACENT SITE THEATER BOOKS APPROACH MODIFICATIONS PER FUTURE TRAFFIC STUDY