PHASE II SITE PLAN
P102
1
P102
GALLATIN CROSSING - PHASE II SITE PLAN
NTS
COPYRIGHT C
THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE
DESIGN THEY REPRESENT ARE THE SOLE PROPERTY OF
COLLABORATIVE DESIGN ARCHITECTS. THESE
DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE
SITE INDICATED. ANY USE, REPRODUCTION,
MODIFICATION OR ADAPTATION WITHOUT THE EXPRESS
WRITTEN CONSENT OF ARCH406 LLC or COLLABORATIVE
DESIGN ARCHITECTS IS STRICTLY PROHIBITED.
2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443
www.cd-mt.com
COLLABORATIVE DESIGN ARCHITECTS
PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : C O L L A B O R A T I V ED E S I G N A R C H I T E C T SISSUE DATES:
ARCH ITECTS
PRELIMINARY
NOT FOR
CONSTRUCTION
GALLATIN CROSSING
BOZEMAN, MONTANA
GALLATIN MALL GROUP JEFF KANNING AIA 2126
-
-
-
-
-
-
2021 2126 - GALLATIN CROSSINGGALLATIN CROSSING
EXISITNG PARKING
EXISITNG PARKING
PARKING
EXISITNG PARKING
PARKING UNDER
CONSTRUCTION
ROCKY MOUNTAIN BANKWHOLE FOODS MARKET
TACO
BELL
PETCO
TIRE RAMA
(UNDER CONSTRUCTION)
EXISITNG PARKING
PARKING SUMMARY
PARKING REQUIRED (STANDARD)1,639 SPACES
PARKING REQUIRED (10% REDUCTION)1,475 SPACES
PARKING PROVIDED 1,584 SPACES
COVERED
BIKE RACK
PHASE II - FALL 2022
PAD D
PAD F
PAD E
PAD C
ENTRY PLAZA
HEALTHCARE
35,000 SF
NEW BUILDINGS
PAD C 11,920 SF
PAD D 12,073 SF
PAD E 10,558 SF
PAD F 12,552 SF
TOTAL:47,103 SF
ENTRY PLAZA
BIKE RACK
COVERED
BIKE RACK
COVERED
BIKE RACK
NEW PARKING
TRASH ENCLOSURE
TRASH ENCLOSURE
ENTRY SIGNAGE
ROUNDABOUT
NEW PARKING
PATIO
THEATER
BOOKS