HomeMy WebLinkAbout012 P101 Phase I Site PlanWEST
M
AI
N
S
T
R
E
E
T
POND
PHASE I SITE PLAN
P101
1
P101
GALLATIN CROSSING - PHASE I SITE PLAN
NTS
COPYRIGHT C
THESE DOCUMENTS, IN PART OR IN WHOLE, AND THE
DESIGN THEY REPRESENT ARE THE SOLE PROPERTY OF
COLLABORATIVE DESIGN ARCHITECTS. THESE
DOCUMENTS ARE INTENDED FOR THE PROJECT ON THE
SITE INDICATED. ANY USE, REPRODUCTION,
MODIFICATION OR ADAPTATION WITHOUT THE EXPRESS
WRITTEN CONSENT OF ARCH406 LLC or COLLABORATIVE
DESIGN ARCHITECTS IS STRICTLY PROHIBITED.
2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443
www.cd-mt.com
COLLABORATIVE DESIGN ARCHITECTS
PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT : C O L L A B O R A T I V ED E S I G N A R C H I T E C T SISSUE DATES:
ARCH ITECTS
PRELIMINARY
NOT FOR
CONSTRUCTION
GALLATIN CROSSING
BOZEMAN, MONTANA
GALLATIN MALL GROUP JEFF KANNING AIA 2126
-
-
-
-
-
-
2021 2126 - GALLATIN CROSSINGGALLATIN CROSSING
EXISITNG PARKING
EXISITNG PARKING
EXISITNG PARKING
PARKING UNDER
CONSTRUCTION
ROCKY MOUNTAIN BANK
WHOLE FOODS MARKET
TACO
BELL
PETCO
TIRE RAMA
(UNDER CONSTRUCTION)
PHASE I - FALL 2022
EXISITNG PARKING
PARKING SUMMARY
PARKING REQUIRED (STANDARD)1,593 SPACES
PARKING PROVIDED 1,979 SPACES
MIXED-USE TENANT SPACE
HEALTHCARE 35,000 SF
FOOD HALL ENTRY
RESTAURANT
SEATNG
FOOD HALL SEATING
HEALTHCARE
ENTRY
CANOPY
COVERED BIKE RACK
SEATING
LAWN
NEW PARKING
PATIENT EXIT
CANOPY
EXISTING PARKING
NEW TRAIL TO TIE
INTO EXISTING TRAIL
THEATER
BOOKS
35,000 SF