HomeMy WebLinkAbout005 A204 Pad D ElevationsCOPYRIGHT C
PREPARED FOR :PROJECT NUMBER:PROJECT ARCHITECT :
ISSUE DATES:GVM RETAIL BUILDING
2825 WEST MAIN STREET, BOZEMAN, MT 59715
GALLATIN MALL GROUP JEFF KANNING 2027
PAD D
10/20/2021 - DESIGN DEVELOPMENT
-
-
-
-
2021 A204
PAD D
- C O L L A B O R A T I V ED E S I G N A R C H I T E C T S2027 - GVM RETAIL BUILDING2280 GRANT ROAD, SUITE C BILLINGS, MT 59102 406.248.3443www.cd-mt.comA R C H I T E C T S
THESE DOCUMENTS, IN PART OR IN WHOLE, AND THEDESIGN THEY REPRESENT ARE THE SOLE PROPERTYOF COLLABORATIVE DESIGN ARCHITECTS. THESEDOCUMENTS ARE INTENDED FOR THE PROJECT ON THESITE INDICATED. ANY USE, REPRODUCTION,MODIFICATION OR ADAPTATION WITHOUT THE EXPRESSWRITTEN CONSENT OF COLLABORATIVE DESIGNARCHITECTS IS STRICTLY PROHIBITED.15'-4"CITADEL ENVELOPE 2000
SYSTEM
STANDING SEAM METAL ROOF24 GA MECHANICAL LOCK QUALITY EDGE VESTA PLANK
SIDING
CITADEL ENVELOPE 2000
SYSTEM
10'-0"
2'-6"
60%
TRANSPARENCY
60%
TRANSPARENCY
PAC-CLAD PRECISION SERIES
WALL TILES
DALTILE WALL TILES
NATURAL STONE
CITADEL ENVELOPE 2000
SYSTEM
QUALITY EDGE VESTA PLANKSIDING
10'-0"
2'-6"
60%
TRANSPARENCY
60%
TRANSPARENCY
DALTILE WALL TILES
NATURAL STONE
CITADEL ENVELOPE 2000
SYSTEM
QUALITY EDGE VESTA PLANK
SIDING
DALTILE WALL TILES
NATURAL STONE
1
A204
NORTH ELEVATION
1/8" = 1'-0"
2
A204
WEST ELEVATION
1/8" = 1'-0"
3
A204
EAST ELEVATION
1/8" = 1'-0"