Loading...
HomeMy WebLinkAbout006 Park Landscape Plan 250' 50' w 4780 4781 4782 4783 4784 4785 4786478547864787 4788 4789 47804780478047854785 4786 4785 4784 4783 4782WATERCOURSE SETBACKZONE 1 ZONE 2 LAWN LAWN SEED MIX 2 RETENTION POND POND BAY POND BAY WETLAND SEED MIX LAWN 10' CLASS 1 ASPHALT PATH6' CLASS 11 GRAVEL PATH 6' CONCRETE PATH SEED MIX 3 SEED MIX 2 SEED MIX 3 SEED MIX 2 CLIMBING BOULDER PROPOSED IRRIGATION WELL BENCH, TYP. DOG WASTE STATION, TYP. FOOT BRIDGE, TYP. BENCH AND WASTE RECEPTACLE, TYP. 6' CLASS I1 GRAVEL PATH WATERCOURSE SETBACK ZONE 1 TREE AND SHRUB PLANTINGS EDGE OF STREAMBANK EDGE OF STREAMBANK PATH CONNECTION TO LAKES SUBDIVISION 50' WATER COURSE SETBACK ASPHALT PATH TO MATCH EXISTING. TRAIL TOTEM PARK BOUNDARY SIGN, TYP. BIKE RACK S. EL DORADO AVE.S. EL DORADO AVE.WESTGATE AVE.SEE SHEET L104 SEE SHEET L102NProject For:Norton Ranch Phase 5 ParksBozeman, MTRETENTION POND PARK AND LINEAR PARK PLAN L101 4/20/18 For Review Date Issue 3084 Thorpe Road Belgrade, Montana 59714 Ph 406.924.8038 alyssa@redbarnmontana.com CLIMBING BOULDER MANUFACTURED BY: NICROS, INC. 845 PHALEN BLVD. SAINT PAUL, MN 55106 WWW.NICROS.COM PH: 1-800-699-1975 CLIMBING BOULDER1 L101 AAJKER CREEKSCALE: 1"=30'-0" 4/27/18 City Submittal 8/13/19 City Submittal 9/17/19 City Submittal 4/21/20 City Submittal 8/20/20 City Submittal 03/03/23 22203 Norton East Ranch Ph. 5B FP