Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
24 H4.20 Skylight Comparison GLB CCOA_210112
(E) OVERALL DIM ( 12' - 6" ) V.I.F 2 H4.20 ______________________________(E)OVERALL DIM ( 6' - 6" ) V.I.FEQ EQ EQ EQ EQ EQ EQ 3 H5.00 ______________________________EQEQSlopeSlope(E) OVERALL DIM ( 12' - 6" ) V.I.F EQEQEQEQEQEQEQ T.O. PARAPET 121' - 0"2' - 5"2 1/2" (E) OVERALL DIM ( 12' - 6" ) V.I.F EQEQEQEQEQEQEQ T.O. PARAPET 121' - 0"2' - 5"2" 12' - 6"6' - 6"EQEQEQ EQ EQ EQ EQ EQ EQ 4 H4.20 ______________________________SlopeSlopeMINARIK ARCHITECTURE, INC 2020 | 971 319 6249 | MINARIKARCH.COM H4.20Gallatin Laundry Building | Bozeman, MT 59715Skylight Comparison |3/8" = 1'-0" PLAN - SKYLIGHT SL-1 (PROPOSED)1 3/8" = 1'-0" SECTION - SKYLIGHT SL-1 (PROPOSED)2 3/8" = 1'-0" SECTION - SKYLIGHT SL-1 (EXISTING)4 3/8" = 1'-0" PLAN - SKYLIGHT SL-1 (EXISTING)3 CCOA | 01/2021