Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
09 H2.51 Reflected Ceiling Plan 2.0 GLB CCOA_210112
Lease 05 1/ H4.00 3/ H4.00 1/ H4.01 20 21 21 21 2024 24 25 25 S1S1S1S1S1S1 S1S1S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 S1 S1 S1 S1 L2 L2 L2 L2 L2 L2 L2 L2 L1 L1 L1 L1 L1 S1 Scope of Burned Joists to be Removed Infill and Patch (E) Exposed Concrete Ceiling (E) Exposed Wood Ceiling, Painted P-1 Sistered Reclaimed Wood Joists and (E) Roof to be Cleaned, Unpainted 2/ H4.00 4/ H4.00 2/ H4.01 22 23 23 18 KITCHENETTE STORAGE STORAGE 7 RCP Legend (N) Gypsum Wall Board, Painted 2x6 Wood Roof Strucutre, Painted (E) Lay-in Ceiling to be Removed (E) Structure, Cleaned & Exposded (E) Concrete Structure (E) Plaster Ceiling to be Removed MINARIK ARCHITECTURE, INC 2020 | 971 319 6249 | MINARIKARCH.COM H2.51Gallatin Laundry Building | Bozeman, MT 59715Reflected Ceiling Plan |1/16" = 1'-0"REFLECTED CEILING PLAN - LEVEL 2.0 (PROPOSED) 1 1/16" = 1'-0"REFLECTED CEILING PLAN - LEVEL 2.0 (EXISTING) 2 Historic Submittal Notes No.DESCRIPTION 1 Remove Past Alteraltions and Prepare for (N) 2 (N) Replica/Restored Entry Door and Sidelight 3 (N) Storefront Entry System 4 Future Tenant Improvments 5 Outdoor Patio/ Lease 03 Entry 6 Remove Skylights and Replace (N) 7 Demo & Remove Damaged Flue 8 (E) Concrete Drain Basin, Remove or Patch Level 9 Protect and Repair Column Wrap, Typ. 10 (N) Open Stair at Building Core 11 New Back of House Egress Stair 12 Line to Indicate Skylight Monitor Above 13 Install Salvaged Wood Floor 14 (N) Wood Floor - Reclaimed Wood Floor 15 Remove (E) Membrane Roofing Layers 16 Protect and Salvage Sign 17 (N) Roof Drain and Overflow 18 Demolish & Remove Ceiling 19 Lower Sill and Replicate (E) Door 20 Cleaned, Exposed Wood Structure to Remain 21 Rebuild Skylight Monitor, GWB (P-1) 22 Demolish Skylight Monitor 23 Remove and Salvage Burned Joists 24 Sister New Structure to Existing Roof 25 Clean and Repair (E) Roof Structure 26 Infill (E) Door Opening 27 (E) Concrete Slab to Remain 28 (N) Concrete Slab CCOA | 01/2021