Loading...
HomeMy WebLinkAbout023 - L 600 - Park Irrigation Water Use EstimatePARK 41.39 acs.PARK 20.34 acs.PARK 30.19 acs.PARK 11.95 acs.8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S8S8S8S8S8S8S8S8S8S8S8S8S8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S8S8S8S8S8S8SS SSSS8S8S8S8S8S8S8S8S 8S SSSS8S 8S 8S 8S 8S8S8S8S8S8S 8S 8S 8S 8S8SSSSSSSSSSSS8S 8S SSSSSSS8S 8S 8S8S8S8S8S8S8S8S8S8S8S8S8S 8S SSSSSSSSSSSSSSSS8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8SSSSSSS8S8S8S8S8S 8S 8S 8S 8S 8S 8S 8S8S8S8S8S8S8S8S8S8S 8S 8S 8S 8S 8S 8S8SSSS8S8SSS 8S SSS8S8S8S8SSS8S8S8S8S 8SSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SD SD SD SD SD SDDD>>>>>>>>>>>>>>>>>>>>>>>>>>>> SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDD>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SDDSD >>>>>>>> >>>>>>>> SD SD >>>>DD>SD>>>>>>>>>>>>>>>>>>>>>>>>>>>>DDD>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>DSDDSD SD SD SD SD SD SD SD DDDSDSDSDSDSDSDSDSDSDSDDSD SD SD SD DDDDDDD>SDDSD D>>>>>>>> >>>>>>>>> >>>>>>>>>DD>>>>>>>>>>>>>>>DDDDSDSD8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W8W 8W 8W 8W 8W8W8W8W8W8W8W 8W 8W8W8W8W8W8W8W 8W 8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 12W12W12W12W12W12W12W12W12W12W12W12W8W DYH DYHDYH DYH DYHDYHDYHDYHDYHDYH8W8W8W8W8W8W8W8WBBBB8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W DYH 8W8W8W8WDYH8W8W 8W 8W 8W 8W W8W 8W 8W 8WBBB B BBBBB B B B B8W8WBBB DYH DYH DYH WSWSWSWSWSFIREWSDYH WSWSWSWSWSWSWSWSWSWSWSWSWSWS WS WS WS WS WS WS WSWSWSWSWSWSWS WSSDDDDSS S S S S S S S S S S S S S S SS SSSSSS8001874987.197CS 16014604983.863CS 16014744980.544CS 16014144996.248CS 16014154996.781BO 8015624983.833CS8015634983.677BO 5368709144983.833CS5368709154983.677BO8017665001.401WV8017675001.395WV 16014154996.781BO S700024991.746MHS-CL CO8003454980.389CO CO8003464982.113CO CO8015654970.969COCO5368709164970.969COS SDSDSDS SDSDSDSDSDDSSSSSSSSSSSS W W W W W W W W W W W W W S S S S S S S S S S S S SWWSTPARK 41.39 acs.PARK 20.34 acs.PARK 30.19 acs.PARK 11.95 acs.BTBTBTBTBTBT BT BTBT BT BT BT BT BT BT BT BT BTBTBTBTBT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BTBT BT BT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BT BT BT BT BT BTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBT BTBTBTBTBTBTBTBTBTBTBT BT BTBTBTBTBTBTBTBTBTBT BTBTBT78'-0"37'-0"Fitness30'-8" x 37'-1"14'_clg Break Rm12'-0" x 13'-0"12'_clgIT6'-2" x 7'-6"12'_clgcoffee bar Leasing16'-3" x 11'-9"12'_clgLounge21'-0" x 37'-1"12'_clgEnt Foyer14'-4" x 28'-1"16'-6"_clgClubhouse Floor PlanGround Floor: Gross 5,206 sfGround Floor Net: 4,928 sf Pool45'-0" x 25'-0"Spa11'-0" x 8'-0"roll-up door BBQ Ent Porch14'-0" x 10'-0"9'_clgWomen's16'-3" x 10'-11"12'_clgMen's14'-1" x 8'-2"12'_clg Document9'-2" x 6'-8"12'_clgMaintanence24'-10" x 28'-2"12'_clg drinking fountain40'-0"FR11'-7" x 7'-6"12'_clg Covered Patio12'-0" x 50'-0"12'_clgsunshelf stone veneerstone veneer Jan6'-0" x 7'-6"12'_clg Leasing12'-0" x 10'-3"12'_clgIsland Bar13'-11" x 16'-0"12'_clgPool Equip11'-0" x 19'-2"12'_clg ChemicalStorage Temp Leasing8'-0" x 10'-3"12'_clgref closetclg brkclg brkwall above 252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clgPatio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg17rstoragecoatsPorch4'-6" x 5'-8"9'_clgFoyer5'-4" x 5'-10"9'_clgD11'-0" x 12'-0"9'_clgK22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg 17rstoragecoatsPorch4'-6" x 5'-8"9'_clg Foyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clg K22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0 "12'-0" 5'-0 "21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"pan upPdr5'-0" x 5'-11"10'_clg17r storagecoatsPorch4'-6" x 5'-8"9'_clg Foyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clgK22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clg GR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg 17rstorage coatsPorch4'-6" x 5'-8"9'_clgFoyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clg K22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clg KpanupPdr5'-0" x 5'-11"10'_clg17rstoragecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clg utilityraceway 12'-0"Open Sp12'-0" x 12'-0"24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11"P1P3R P3 7'-0"1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clgKpanupPdr5'-0" x 5'-11"10'_clg 17rstoragecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clgutilityraceway12'-0"Open Sp12'-0" x 12'-0"24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11"P1P3R P3 7'-0"1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clg Kpan upPdr5'-0" x 5'-11"10'_clg17r storagecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clg utilityraceway12'-0"Open Sp12'-0" x 12'-0" 24'-11"52'-0"5'-0"69'-0 "12'-0" 5'-0 " 21'-10"24'-11" P1P3R P3 7'-0" 1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clg GR13'-0" x 14'-0"9'_clgKpanupPdr5'-0" x 5'-11"10'_clg 17rstorage coatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clgutilityraceway12'-0"Open Sp12'-0" x 12'-0" 24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11" P1P3R P3 7'-0"1'-72"5'-0"21'-8 "2"2"5'-0"21'-8"2"2"5'-0"21'-8"2"2"78'-0"37'-0"Fitness30'-8" x 37'-1"14'_clg Break Rm12'-0" x 13'-0"12'_clgIT6'-2" x 7'-6"12'_clgcoffee bar Leasing16'-3" x 11'-9"12'_clgLounge21'-0" x 37'-1"12'_clgEnt Foyer14'-4" x 28'-1"16'-6"_clgClubhouse Floor PlanGround Floor: Gross 5,206 sfGround Floor Net: 4,928 sf Pool45'-0" x 25'-0"Spa11'-0" x 8'-0"roll-up door BBQ Ent Porch14'-0" x 10'-0"9'_clgWomen's16'-3" x 10'-11"12'_clgMen's14'-1" x 8'-2"12'_clg Document9'-2" x 6'-8"12'_clgMaintanence24'-10" x 28'-2"12'_clg drinking fountain40'-0"FR11'-7" x 7'-6"12'_clg Covered Patio12'-0" x 50'-0"12'_clgsunshelf stone veneerstone veneer Jan6'-0" x 7'-6"12'_clg Leasing12'-0" x 10'-3"12'_clgIsland Bar13'-11" x 16'-0"12'_clgPool Equip11'-0" x 19'-2"12'_clg ChemicalStorage Temp Leasing8'-0" x 10'-3"12'_clgref closetclg brkclg brkwall above 252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clgPatio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg17rstoragecoatsPorch4'-6" x 5'-8"9'_clgFoyer5'-4" x 5'-10"9'_clgD11'-0" x 12'-0"9'_clgK22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg 17rstoragecoatsPorch4'-6" x 5'-8"9'_clg Foyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clg K22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0 "12'-0" 5'-0 "21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clgGR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"pan upPdr5'-0" x 5'-11"10'_clg17r storagecoatsPorch4'-6" x 5'-8"9'_clg Foyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clgK22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"252'-0"5'-0"69'-0"12'-0"5'-0"21'-10"21'-10"21'-9"Composite First Floor Plan 4-PlexScale: 18"=1'-0"22'-9"2"2-CG24'-1" x 22'-0"9'_clg GR13'-1" x 13'-8"9'_clg Patio12'-6" x 7'-6"panupPdr5'-0" x 5'-11"10'_clg 17rstorage coatsPorch4'-6" x 5'-8"9'_clgFoyer5'-4" x 5'-10"9'_clg D11'-0" x 12'-0"9'_clg K22'-0"WaterService12'-0"Open Sp12'-0" x 12'-0"3'-812"P1P2P2RP3Alt5'-0"21'-8"2"2"12'-0"7'-0"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clg KpanupPdr5'-0" x 5'-11"10'_clg17rstoragecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clg utilityraceway 12'-0"Open Sp12'-0" x 12'-0"24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11"P1P3R P3 7'-0"1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clgKpanupPdr5'-0" x 5'-11"10'_clg 17rstoragecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clgutilityraceway12'-0"Open Sp12'-0" x 12'-0"24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11"P1P3R P3 7'-0"1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clgGR13'-0" x 14'-0"9'_clg Kpan upPdr5'-0" x 5'-11"10'_clg17r storagecoatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clg utilityraceway12'-0"Open Sp12'-0" x 12'-0" 24'-11"52'-0"5'-0"69'-0 "12'-0" 5'-0 " 21'-10"24'-11" P1P3R P3 7'-0" 1'-72"24'-10"2"2-CG24'-1" x 22'-0"9'_clg GR13'-0" x 14'-0"9'_clgKpanupPdr5'-0" x 5'-11"10'_clg 17rstorage coatsPorch12'-6" x 7'-6"D11'-0" x 12'-0"9'_clgsFoyer10'-9" x 5'-2"9'_clgutilityraceway12'-0"Open Sp12'-0" x 12'-0" 24'-11"52'-0"5'-0"69'-0"12'-0"5'-0"21'-10"24'-11" P1P3R P3 7'-0"1'-72"5'-0"21'-8 "2"2"5'-0"21'-8"2"2"5'-0"21'-8"2"2"LANLANLANLANLANLANLANLANWESWESWESWESWESWESSIOSIOSIOSIOSIOSIOSIO8'8'8'8' 8' 8'8'8'8'8' 8'WESWES8'8'SIO8'8'LANLANWESWESLANRRWW5000'4998'4996'4998'4997'4998'4997'4998'4999'4997'4997'4998'4999' 4995 '4996'4995' 49 94 ' 4993 ' 4992'4997'4998'4999'4998'4999'5000'5001'4996'4995'4997'4994'4995'4994'4993'4993'4992'4994'4991'4997' 5001'5000'5002'4995'4997'4997'4998'4999' 4999 ' 4999'4996'4998'4999'4998'4999'5000'UE UEUEUEUE UEUEUEUEUEUEUEUEUEUEWWBFCPBFCPPROPOSEDIRRIGATION WELL #2CONNECTION POINT& BACKFLOW PREVENTEREXISTINGIRRIGATION WELL #1CONNECTION POINT& BACKFLOW PREVENTERIRRIGATIONSLEEVE, TYP.IRRIGATIONSLEEVE, TYP.IRRIGATIONTYPETOTALAREA / QTYANNUALET RATETOTALANNUAL H2O16,536 SF29 IN / SF835,328 GALH.E.SPRAY IRRIG. SOD 120,435 SF6 IN / SF309,499 GALH.E.SPRAY IRRIG. SEEDH.E. TREEBUBBLER138 TREES16.5 GAL /WEEK40,986 GALH.E. SHRUBDRIP IRRIG.0 SHRUBS7.5 GAL /WEEK0 GALTOTAL ANNUAL H2O REQUIRED: 1,185,813 GALTOTAL ACRE FEET PER YEAR: 3.64 ACRE FEETIRRIGATION SCHEDULE - WELL #2PROPOSED WELL TO IRRIGATE PARKSYMBOLSIZEDESCRIPTIONIRRIGATION LEGEND*BACKFLOW PREVENTER1"BFCONNECTION POINTCPIRRIGATION SLEEVE, 4" MIN. SCH 40 PVC*NOTES:-IRRIGATION LAYOUT TO BE DETERMINED IN FIELD BYIRRIGATION CONTRACTOR-FINAL IRRIGATION AS-BUILT MAPS TO BE PROVIDED TOTHE CITY OF BOZEMAN PARKS DIVISION-WELLS TO BE INSTALLED AT DISTANCE FROM SANITARYSEWER LINES PER CURRENT REGULATIONS-IRRIGATION SYSTEM TO BE HUNTER 2-WIRESYSTEM/DECODERS WITH HUNTER CONTROLLER ONMETAL PEDESTAL MOUNT, UNLESS OTHERWISEAPPROVED BY THE CITY'S PARKS OPS SUPT-SEEPLANN/AWELLN/AWCONCEPTUAL IRRIGATION NOTES:1.ALL SECTIONS OF MAINLINE CROSSING UNDER CONCRETE, ROADS, OR OTHER LARGE HARDSCAPE SURFACES TOBE IN SCH. 40 PVC SLEEVES.1.1.SLEEVES TO BE DOUBLE THE DIAMETER OF PROPOSED MAINLINE.1.2.LATERAL LINE SLEEVES TO BE SCH. 40 PVC AT LEAST DOUBLE THE DIAMETER OF THE LATERAL LINE SIZEPROPOSED.2.ALL SYSTEMS TO BE ON A LOOPED MAINLINE WHERE POSSIBLE, REFER TO CONCEPTUAL IRRIGATION MAINLINELAYOUT.3.ALL SYSTEMS WILL BE 2 WIRE DECODER TYPE SYSTEMS.4.ALL INFORMATION SHOWN ON CONCEPTUAL DRAWINGS TO BE VERIFIED BY IRRIGATION DESIGNER, ANDCONTRACTOR. COORDINATION WITH GENERAL CONTRACTOR IS NECESSARY BEFORE CONSTRUCTION BEGINSTO ENSURE PROPER LOCATION OF SLEEVES, ELECTRICAL CONNECTIONS, AND WATER SOURCE CONNECTIONS.5.ALL IRRIGATION COMPONENTS TO BE HIGH EFFICIENCY, HEADS, NOZZLES, DRIP, VALVES, AND FITTINGS.GENERAL IRRIGATION NOTES AND SPECIFICATIONS1.THESE PLANS PROVIDE GENERAL ANTICIPATED WATER DEMAND AND TYPE OF IRRIGATION FOR THE SUBDIVISIONPARKS, WHICH ARE IRRIGATED BY (1) WELL. THE SUBDIVISION OPEN SPACES AND DETENTION PONDS AREIRRIGATION BY (1) EXISTING WELL ON SITE. THE WELLS WILL NOT BE CONNECTED IN ANY WAY.2.ALL VALVE BOXES TO BE STANDARD SIZE OR LARGER3.IRRIGATION MAIN LINE TO BE SCH. 40 PVC SOLVENT WELDED PVC IN CONTINUOUS LOOP, SIZE OF LINEDEPENDENT ON WATER DEMAND AS DETERMINED BY LANDSCAPE CONTRACTOR. LATERAL LINES TO BE 1" SCH 40SOLVENT WELDED PVC; DEPENDENT ON PRESSURES AND GALLONS PER MINUTE AT DISCRETION OF LANDSCAPECONTRACTOR BASED ON PROFESSIONAL EXPERIENCE AND OPINION UPON DESIGN AND INSTALLATION OF THESYSTEM.4.ALL TREES TO BE IRRIGATED THROUGH DEDICATED BUBBLERS EVENLY DISTRIBUTED AROUND BASE OF TREEWITH FOUR (4) EVENLY SPACED 1 GPH BUBBLER EMITTERS.5.TREES AND SHRUBS PLACED WITHIN PLANTING BEDS MAY UTILIZE DRIP IRRIGATION ADJUSTED PER INDIVIDUALPLANT REQUIREMENTS.6.ALL SHRUBS OUTSIDE OF DEDICATED PLANTING BEDS TO HAVE DEDICATED BUBBLERS EVENLY DISTRIBUTEDAROUND BASE, WITH TWO (2) EVENLY SPACED 1 GPH EMITTER.7.BUBBLERS TO TREES MAY BE OMITTED WHERE OVERHEAD IRRIGATION WILL PROVIDE ADEQUATE WATER.8.ALL MIXED SHRUB AND PERENNIAL PLANTINGS TO BE IRRIGATED WITH DEDICATED DRIP TUBING W/ EMITTERSADJUSTED PER INDIVIDUAL PLANT REQUIREMENTS.9.LAWN AND SEED AREAS TO BE IRRIGATED WITH SPRAY OR ROTOR OVERHEAD IRRIGATION AS INDICATED PERPLAN.9.1.ALL SPRAY OR ROTOR OVERHEAD IRRIGATION HEADS WILL BE INSTALLED AND ADJUSTED PROPERLY TOMINIMIZE WATER OVER THROW ONTO PAVEMENT.9.2.ALL SPRAY OR ROTOR OVERHEAD IRRIGATION TO UTILIZE WATER EFFICIENT NOZZLES (MULTI-SPRAY,MULTI-TRAJECTORY, OR ROTATING SPRAY).10.ALL HEADS MUST ACHIEVE HEAD-TO-HEAD COVERAGE FOR SOD AREAS.11.SYSTEM SHALL UTILIZE WEATHER / MOISTURE MONITOR.12.BACKFLOW ASSEMBLY AND BLOWOUT ASSEMBLY SHALL BE LOCATED IN APPROVED EXTERNAL GRADEBOX, ANDIS THE RESPONSIBILITY OF THE LANDSCAPE CONTRACTOR TO COORDINATE INSTALLATION PER LOCAL CODESAND ORDINANCES, WITH ARCHITECTURE AND WITH ALL OTHER TRADES.13.POWER SOURCE FOR IRRIGATION CONTROLLER TO BE COORDINATED WITH ELECTRICAL ENGINEERING ANDELECTRICAL CONTRACTOR BY LANDSCAPE CONTRACTOR.14.DO NOT INSTALL IRRIGATION SYSTEM WHEN OBVIOUS OBSTRUCTIONS OR GRADE CHANGES ARE PRESENT.15.ALL INFORMATION TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO INSTALLATION.16.THE CONTRACTOR SHALL MAINTAIN AN ACCURATE & CURRENT 'AS-BUILT' IRRIGATION PLAN ON SITE AT ALLTIMES.17.ALL SPRAY AND ROTOR HEADS WITHIN SOD LAWN AREAS TO PROVIDE A PRECIPITATION RATE OF 0.4-0.8"/sqft.80400160N1L6001"=80'-0"Park Irrigation Water Use Estimate Park IrrigationWater UseEstimateL 600design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\south range crossing\autocad\01_sheets\park sheets\l600_south40-parks_irrigation.dwg South Range Crossing Parks Master Plan Bozeman, Montana KHM/HU TMS 12/21/22Prelim Plat03/20/23Prelim Plat RC105/18/23Prelim Plat RC2