HomeMy WebLinkAbout001 - SRX MSP Narrative
South Range Crossing
Master Site Plan
May 2023
2
Table of Contents
1. Project Team
2. Narrative
a. REMU Zoning Analysis
b. Project History
3. Project Design
a. Land use analysis
b. Streetscape
d. Landscape
e. Parkland
f. Neighborhood center
g. Infrastructure & utilities
4. Entitlement Period
5. Phasing
6. Design Regulations
7. Departures
Appendices
Appendix A - Vicinity Map
Appendix B - Land Use Diagram
Appendix C - Block Frontage Diagram
Appendix D - Developable Area Diagram
Appendix E - Phasing Plan
Appendix F - Parks Master Plan
Appendix G - Environmental Assessment
Appendix H – Subdivision Green Plan
Appendix I - CCR's
Appendix J - Design Regulations
Appendix K - Traffic Impact Study
Appendix L – Wetland Delineation Report
Appendix M - Water Design Report
Appendix N - Sewer Design Report
Appendix O - Stormwater Management Report
Appendix P – Draft Preliminary Plat
Appendix Q - Concurrent Construction request
Appendix R - DNRC Intent to Issue Well Permit - Letter
Appendix S - Weed Management Plan
Appendix T – Conservation District Determination
Appendix U- Agricultural Water Users Memo
Appendix V – Commercial Area Tracking Table
3
1. Project Team
Owner & Applicant:
Providence Development Company, LLC
Attn: Parker Lange
529 East Main Street
Bozeman, MT 59715
Ph: 406-595-4560
Email: plange@providencedevco.com
Representative:
Intrinsik Architecture, Inc
Attn: Tyler Steinway
106 East Babcock Street, Suite 1A
Bozeman, MT 59715
Ph: 406-582-8988
Email: tsteinway@intrinsikarchitecture.com
Planning:
KTGY
Attn: Casey Roberts
17911 Von Karman Avenue, Suite 200
Irvine, CA 92614
Ph: 949-268-8545
Email: croberts@ktgy.com
Engineering:
Morrison – Maierle
Attn: Matt Ekstrom
2880 Technology Blvd W
Bozeman, MT 59718
Ph: 406-922-6784
Email: mekstrom@m-m.net
Landscape Architecture:
Design 5
Attn: Troy Scherer
111 North Tracy Ave
Bozeman, MT 59715
Ph: 406-587-4873
Email: troy@design5la.com
4
2. Project Narrative
I. Project Overview
Executive Summary
The project team is submitting a Master Site Plan for the South Range Crossing Development project.
This project will divide 38.4 Acres into 97 lots and associated street/trails, which further breakdown into
4 park lots, 5 stormwater lots, 9 open space lots, 8 commercial lots, and 71 residential lots. There have
been several Pre-Application calls with the city to discuss this project and the overall vision.
Vision
South Range Crossing (Project or the Development) is a 38.4-acre undeveloped parcel located on the
south side of Bozeman. The proposed project consists primarily of residential housing units (rental and
for sale product) with accompanying parkland and commercial uses to support the residential
neighborhood. The location provides a unique opportunity to provide Bozeman with an additional well-
planned addition to the city. The subdivision will support the areas’ natural amenities to create a unique
framework that fosters walkability and a sense of place with a variety of offered housing options and
supporting commercial spaces. South Range Crossing is envisioned as an active community which will
consists of a diverse set of residents with a range of income and demographics, that also enhances the
surrounding amenities and will offer services to surrounding neighborhoods.
5
Site Analysis
The South Range Crossing property is situated at the southeast corner of the intersection of South 19th
Avenue (Principal Arterial) and Graf Street (Collector), which makes it a great location for infill
development. When looking at the zoning in the area there is REMU to the south (Blackwood Groves)
R-2 to the east (Alder Creek), R-3 to the west (Southbridge) and R-1 & R-2 on an underdeveloped parcel.
The Community Plan has designated this property as Urban neighborhood within the Future Land Use
Map. Prior to submitting this application, a Zone Map Amendment was submitted to rezone this
property to REMU, which would match the zoning to the south. The REMU Zoning will allow for the
South Range Crossing vision to be realized.
The South Range Crossing project will look to extend all logical road connections from both the east and
the south and will look to align accesses across 19th into the neighbors to the west. Furthermore, South
Range Crossing will integrate into the existing parks system to fill in a vital missing component. When
looking at the larger park system this will complete the last piece in creating a large three neighborhood
loop. A resident or pedestrian will be able to visit parks in three different neighborhoods with a very
minimal distance on a street sidewalk.
Project History
This project formally began back in June of 2022 with a kickoff Pre-Application call with City staff. This
call was the precursor to the submittal of an Zone Map Amendment (for REMU) in August of 2022. The
City Commission approved the Zone Map Amendment on December 13th. The ordinance formally
adopting the Zoning is in the process of being finalized likely be effective in the first part of 2023.
Following the ZMA, Subdivision Pre-Application was submitted to outline the overall vision and
framework for this project. The comments generated from that application have been used as a guide as
6
this Master Site Plan Application. Submitted concurrently with this application is a Preliminary Plat
Application.
3. Project Design
Land Use Analysis - Residential
As an alternative to traditional 2 and 3 story apartment-style rental communities, the Build-for-Rent
(BFR) neighborhoods at South Range Crossing are configured to deliver a single-family home rental
lifestyle while also providing residents with the benefits of shared amenity spaces. Designed with
pedestrian connectivity in mind, the BFR neighborhood is a collection of individual homes that positions
front doors around green spaces and public streets. Residents can enjoy the interconnected system of
paseos, pathways, and sidewalks with a focus on communal open spaces and an attractive street scene.
Each unit is allocated an attached or remote single car garage. With privacy, quality and convenience,
build-for-rent neighborhoods take the best aspects of the for-sale neighborhoods residents love and
offer single family homes within a professionally managed rental community.
The second product type highlighted in the Sough Range Crossing Project is townhouse/rowhouses.
There are several lots proposed to be fee simple townhouse lots. Additionally, there are larger lots that
will facilitate the development of Rowhouses through a further site plan review.. All of the
townhouse/rowhouses will have front on either a street or open space lot and will take vehicular access
from an alley. It is understood that there are additional Townhouse/Rowhouse design standards in the
Bozeman code that will be adhered to. These standards will be confirmed with a future site plan/sketch
plan review.
Land Use Analysis - Commercial
South Range Crossing will feature 7 commercial development lots and 1 common shared parking lot
area. This common parking lot will service all of the commercial uses in the project. Locating this lot on
its own lot will allow for the parking to be maintained, owned and operated by the HOA.
The total allowed commercial area will be dictated by the gross square footage of residential space
created in the neighborhood. The REMU zoning caps the amount of commercial space to 30% of the
gross square footage of the project. While the specific layouts and square footages are still being design
it is anticipated that the total gross square footage will be approximately 355,00 GSF. This puts the total
allowed commercial area to be approximately 106,500 SF. Because the specific floor plans and square
footages are in flux, a commercial tracking table has been included to track the gross square footage. It
is anticipated that this commercial tracking table will be submitted with each subsequent commercial
site plan to ensure compliance with the 30% standard.
7
Land Use analysis - Density
The REMU zoning district envisions a balance of both residential at a variety of shapes and scales,
coupled with a small amount of neighborhood commercial. The intention is to create 2 distinct product
types, Townhouses/Rowhouses and Build for Rent Single-Households. These housing types and the
housing in the surrounding area will greatly feed the larger community commercial component that are
envisioned at the corner of South 19th Avenue and Graf Street. At this time the dwelling unit
configurations (floor plan size and total number) is still in flux, but more concrete numbers will be
submitted with each site plan application. The goal is to achieve an average density between 12-25
DU/A. Please see the Land use table below:
Area (in Acres) Percent of Total
Area in Residential Lots 71 19.34 54%
Townhouse/Rowhouse Lots 12 3.09 8%
Build For Rent Pod Lots 59 16.9 44%
Area in Commercial Lots 8 3.76 10%
Area in ROWs NA 7.71 20%
Area In Park 4 3.87 10%
Area in Open Space 9 2.60 7%
Area in Stormwater 5 0.47 1%
Total Site Area 97 38.40 100%
8
Streetscape
The streetscape and block frontage will take the shape in variety of different ways in South Range
Crossing. The majority of the public streets will utilize the block frontage landscape with the exception
of the commercial lots. As outlined in section 38.510.020 D. all new or undesignated street in
commercial and mixed use zones shall use the block frontage mixed. It is anticipated that these lots will
have a primary frontage along an external street. Additionally, they will likely have a street frontage
fronting along a internal parking lot which swill conform with internal roadway or special residential
block frontage standards. The buildable lots adjacent to parks will have a secondary “Park” block
frontage. Lastly, the buildable lots that front onto open space tacks will utilize the special residential
block frontage standards. these block frontages are depicted on the community design framework
master plan included as appendix C. These lots are somewhat large, so additional block frontages may
be identified as each lot goes through site plan review.
Landscape
All landscaping will comply with the mandatory landscaping provision of the UDC, include the use of
drought tolerant plants, use of appropriately sized landscape plant material, coordination with utilities,
use of permanent irrigation and perpetual maintenance in a health condition. Furthermore, all required
ROW landscaping will comply with the UDC regulations. All mature trees and significant vegetation will
be preserved where possible, as they are a direct enhancement of the pedestrian streetscape
environment. All site development will go through a future site plan application to verify all on site
landscaping meets the intent of the UDC.
Parkland
By putting a focus on the parkland and shared community areas, South Range Crossing will create
opportunities for the community to gather and move through the site. The overall park system is
proposed to integrate into the parks system of the adjacent neighborhoods of Alder Creek and
Blackwood Groves. Additionally, the neighborhood’s design reflects the REMU zoning district’s intent to
preserve and integrate the natural amenities into the development. Please refer to the Parks Master
Plan for detailed information on the specific park features and amenities.
9
Neighborhood center
The South Range Crossing project will have 2 distinct focal points within the neighborhood. The first
focal point will be the commercial component proposed on the corner of 19th and Graf. This area is
envisioned to have a series of plazas/outdoor gathering areas as well as be a neighborhood commercial
hub for the neighborhood and surrounding area. The second Neighborhood center will be the central
park. This larger park is planned to have a variety of amenities that will serve a wide audience.
The size and scale of the Property, along with the proposed zoning designations, allow for the creation
of a diverse and dynamic focal point for all the residents and adjacent neighborhoods. It is anticipated
that South Range Crossing will have 2 main focal points, the commercial center in the NW corner of the
site and then the larger central park. The main focal point, while not included in this application, will be
the area between South 25th Avenue, South 22nd Avenue and south of West Kagy Boulevard.
The park area dedicated in phase 1 will aim to be the central focal point highlighting amenities centered
around all ages. It is proposed that there will be multi-sport courts, ping pong tables, cornhole, custom
seating features and pavilion shade structures. The commercial center while still under development
aims draw in a wide range of users. The anticipated site plans will feature plazas in between buildings
generating a community gathering space. Please see the Parks Master Plan Appendix F for more
information about the phasing of park improvements and amenities. The qualifying criteria for this
location are described below:
38.410.020.A.1 - The proposed neighborhood center is within 600’ of the geographical center of the site.
38.410.020.A.2 – This park is proposed to be developed in one phase.
38.410.020.A.3&4 - This neighborhood center has less than 100% frontage but more than 50%.
Maintenance of this neighborhood center is further described in the Parks Master Plan Appendix F.
10
38.410.020.A.5&6 - This neighborhood center is also being used to meet our parkland requirements for
the project. There is significant area in land used as open space with enhanced natural features and a
nice gathering space in the middle.
Infrastructure & Utilities
Common subdivision infrastructure improvements are critical to the Property utility, transportation, and
parkland networks. The construction of these improvements will be installed in phases. Please see
phasing plan Appendix E and the Phasing section of the narrative below. These common subdivision
improvements will need to be installed or financially guaranteed prior to occupancy of any structures
within each phase. Furthermore, a request to construct site improvements including residential
structures, concurrently with these common subdivision infrastructure improvements is included in this
application.
4. Entitlement period
The project is to be constructed over a period of three to five years. Extension to the Master Site Plan
may be sought, as necessary.
Following approval of the Master Site Plan, the applicant intends to submit sequential individual site
plans for specific areas within the Master Site Plan. Each subsequent application for a site plan shall be
consistent with the approved Master Site Plan and subject to the review criteria of Section 38.230.100.A
BMC.
5. Phasing
This application is a subdivision of the overall neighborhood that will be strategically constructed in
Phases. The proposed Phasing of the property will consist of six (6) phases of the project which will
provide self-contained housing, improvements, and parkland to appropriately serve each Phase.
Common Subdivision Infrastructure Improvements are identified on the Phasing Plan. A list of the
Common Subdivision Improvements by phase is:
Phase 1
• Construct Brookdale Drive from South 15th Avenue to the west Phase 1 Boundary including water,
sewer, and drainage facilities.
• Construct Canter Avenue from W Graf Street to the south Boundary including water, sewer, and
drainage facilities.
• Construct Street A including water, sewer and drainage facilities.
• Construct Alder Creek Drive from Street A to the phase 1 western boundary including water, sewer
and drainage facilities.
• Dedicate all of the park land
• Construct Phase 1 Build for Rent (BFR) neighborhoods & the townhouse/rowhouses.
• Begin construction of Park Improvements as Improvements In Lieu of Parkland for phase 1.
• Site improvements will be phased according to the South Range Crossing Phasing Plan
Phase 2
11
• Extend Alder Creek Drive to its connection with the existing South 15th Avenue connection including
water, sewer, and drainage facilities.
• Construct Phase 2 Build for Rent (BFR) neighborhoods.
• Begin construction of Park Improvements as Improvements In Lieu of Parkland for phase 2.
• Site improvements will be phased according to the South Range Crossing Phasing Plan.
Phase 3
• Complete Street B from Alder Creek Drive to Brookdale Drive including water, sewer, and drainage
facilities.
• Extend Brookdale Drive from Canter to its connection with Street B including water, sewer, and
drainage facilities.
• Construct Phase 3 Build for Rent (BFR) neighborhoods.
• Complete Construction of Park Improvements as Improvements In Lieu of Parkland for phase 3.
• Site improvements will be phased according to the South Range Crossing Phasing Plan
Phase 4
• Complete Southbridge Drive including water, sewer, and drainage facilities.
• Construct Phase 4 townhouse neighborhood with associated onsite utilities and improvements.
Phase 5
• Complete Brookdale Drive from Street B to South 19th Ave including water, sewer, and drainage
facilities.
• Construct the commercial buildings (7) with associated onsite improvements such as utilities,
parking and plaza areas.
The projected entitlement period for this Master Site Plan is five (5) years; however, based on the size
and scale of this project, extension(s) may be requested. A phasing plan has been included in this
application as Appendix E, however, should the phasing need to follow a different order, the applicant is
willing to provide contingencies described in modifications or extensions requested for the Master Site
Plan. Should a modification of the proposed phasing become necessary, the applicant will ensure any
modified phasing sequencing will line up with City standard and requirement to ensure that all
infrastructure networks are properly connected.
6. Draft Design Guidelines
The design guidelines have been included in the Preliminary Plat application as well as included herein
as Appendix P.
All infrastructure design reports have also been included as Appendices (Appendix M-O).
7. Departures
At this time, no departures are requested. Each lot will be required to go through the site planning
process, at that time departures may also be requested.