Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
007 C0.4 CONCURRENT CONSTRUCTION PLAN
C0.4CONCURRENTCONSTRUCTIONPLAN1 8/9/2022 PRELIMINARY PLAT CDP ZWL 2 8/20/2022 PRELIMINARY PRICING CDP ZWL 3 12/20/2022 PRELIMINARY PLAT RC1 CDP ZWL PROFESSIONALENGINEERS &SURVEYORSSTAHLYENGINEERING& ASSOCIATESCANYON GATE CANYON GATE INVESTORS, LLC BOZEMAN, MONTANA Weeping Rock Ln Boylan RoadStory Mill Road Northview Street Maiden Star Ln Spirit Crossing Ln Maiden Spirit St.Valhalla Court Boylan RoadW W W W W W W Boylan RoadPutter CourtPar CourtWWWWWWWWWWWWWWWW WWWWWWWWW WWWWMAIDEN SPIRIT ST.CANYON GATE BLVD.LUCY LANE BLOCK 1 LOT 354,787 SF1.26 ACBLOCK 2 LOT 182,331 SF1.89 ACBLOCK 3 LOT 143,125 SF0.99 ACPUBLIC PARK C5,831 SF0.13 ACBLOCK 3 LOT 221,953 SF0.50 ACBLOCK 4 LOT 339,306 SF0.90 ACBLOCK 4 LOT 438,383 SF0.88 ACBLOCK 5 LOT 1139,020 SF3.19 ACPUBLIC PARK B62,482 SF1.43 ACBLOCK 4 LOT 173,487 SF1.69 ACBLOCK 4 LOT 274,569 SF1.71 ACPUBLIC PARK A33,599 SF0.77 ACOPEN SPACE A31,918 SF0.73 AC(PUBLIC ACCESS EASEMENT)BLOCK 1 LOT 158,526 SF1.34 ACBLOCK 1 LOT 257,949 SF1.33 ACROW234,346 SF5.38 ACCANYON GATE BLVD.Bridger Canyon Road (AKAHWY 86 - 144' ROW)BBBSS SS SSSS SSSSSUBDIVISION STREETS TO BE IMPROVEDTO GRAVEL SURFACING PRIOR TO BLOCK4 VERTICAL CONSTRUCTION.WATER MAIN AND FIRE HYDRANTS PRIORTO BLOCK 4 VERTICAL CONSTRUCTION.BLOCK3 LOTS REQUESTED FORCONCURRENT CONSTRUCTION.BLOCKS 1 & 2 LOTS REQUESTEDFOR CONCURRENT CONSTRUCTION.BLOCK 4 LOTS REQUESTED FORCONCURRENT CONSTRUCTION.LEGENDSITE TO BE CONSTRUCTEDCONCURRENTLY WITHSUBDIVISION IMPROVEMENTSSITE TO BE CONSTRUCTEDAFTER COMPLETION OFSUBDIVISION IMPROVEMENTSSUBDIVISION PARK & OPENSPACE IMPROVEMENTSSUBDIVISION STREETIMPROVEMENTS