Loading...
HomeMy WebLinkAboutStorm Water BMP Stormwater Division MT Construction Stormwater Permit P.O.Box 1230 Bozeman,Montana 59771 Sin a-Famil Residential Protects 406)582-2916 Stormwater Division January3,2022 The City requires all single-family residential contractors/owners to submit this application and receive an approval letter before initiating construction activities pursua it to Chapter 40 Article 4 of the Bozeman Municipal Code(BMC).The City's Stormwater Division reviews, inspects,and enforces all provided information.This Permit is active once approved by the City and considered terminated upon the contractor/owners receipt of a Certificate of Occupancy. Section 1:Applicant Information(All Fields Must Be Completed) OWNER:Mark&Trisha Sherman Company:Miller Design Build,LLC Phone:906-370-9044 Email:millerdesignbuild@gmail.com Address:116 S. 11th Ave. Bozeman MT 59715 City:Bozeman State:MT Zip code:59715 CONTRACTOR:owner Company: Phone: Email: Address: City: State: Zip code: Section 2:Project Information(All Fields M st Be Completed) Project Type (Check): NewQRemode1 ­' ddition Demo I Disturbance Area (square feet):500sgft Project Address:114 S.11th Ave Bozeman,MT 5015 Section 3: Project Schedule(All Fields Mus Be Completed) Estimated Completion Date (MM/YYYY):12/2023 Start Date (M M/YYYY):06/2023 Section 4:Site Map 1. Contractor/owner agrees to install Best Management Practices(BMPs) per the example layout below before beginning land disturbance activities and maintain throughout the entire length of the project: INITIAL HERE:MS ----------------- ••----------- --------------- er a�iwriu�tai —Property Boundary Lime, 1 � ! n 1.f Disturbed Area Silt fence,Foam wattle,or Straw Wattle Adjacent to Road or Sidewalk"*low to r wtrf?t douse I ootprint -� Grade is not an approved amp" 1 I I k City Road,Curb,and Gravel Gutter , - - ------------ ------ 7 - --------------------------J I ..A ••"to Scale Section 5:Local Erosion and Sediment Control Requirements *Refer to the City of Bozeman's Best Management Practice(BMP) Manual to select required controls." 1. Control disturbed areas: Project boundar es require BMPs that control stormwater flowing from disturbed areas pursuant to§40.04.360.B. BMC.Approved options: ❑ Silt Fence ® Foam or Straw Wattle ❑ Other: 2. Mitigate tracking: Exit points require BM s that mitigate the tracking of debris off-site onto the right-of-way pursuant to§40.04.360.C. BMC. Approved options: ❑ Gravel ❑ Proprietary Tracking Control Product ® Other: Equipment directly unloaded onto Job site.Clean area daily during machine use 3. Control concrete waste,slurry and other masonry wash waters:Concrete activities require BMPs that allow for the capture and disposal of wastes, slurries, and wash-waters, pursuant to§40.04.360.F. BMC.Approved options: ® Reusable or Disposable Product ❑ Other: 4. Manage dewatering flows:Accumulated groundwater or stormwater discharges pumped into infrastructure or waterways are MDEQ permitted activities and are required to meet the effluent limitations in the MDEQ General Permit for Construction Dewatering pursuant to 40.04.360.B. BMC, Montana Clean Water Act, and Federal Clean Water Act.Approved options: ❑ Land Application ❑ Well Point ❑ MDEQ Construction Dewatering Geneal Permit Coverage iO Other: No-dewatering with 2ft depth excavation Section 6:Administrative and Operational ontrols 1. Contractor/Owner agrees to implement the following required administrative controls: ® Street Sweeping:Frequency: as require On-site Spill Kit Control of Construction Wastes ® Removal of Temporary BMPs Upon P ject Completion Section 7:Acknowledgment Certificate _ I certify that I am the contractor/owner or an authorized agent. If acting as an authorized agent, I certify that I am authorized to act as the contractor/owner agent regarding the property at the above-referenced address for the purpose of filing applications for decisions, plans, or review under Chapter 40 Article 4 of the BMC and Ordinances #1763 and #2002, and have full power and authority to perform on behalf of the contractor/owner all acts required to enable the City to process and review such applications.I certify that the information on this application is true,will be implemented, and maintained throughout the life of the project. By checkingthis box,I acknowledge that non-compliance with this Permit,aforementioned BMC,and City Ordinances may result in op work order, city withholding a certificate of occupancy, or a lien filed against the project for unpaid co s of atement of violations. 4-25-2023 Signature of Legally Responsible Person Date Mark Sherman owner Printed Name Title