HomeMy WebLinkAboutBozeman Planning Application_SIGNED Community Development
DEVELOPMENT REVIEW APPL1%C'f,AJ'10K,,
Remember to obtain owner signature on'his forin prior to upioading with the rest of your submittal
PROJECT INFORMATION
Project Name: 116 S. 11 th Garage ADU
Project Type(s): Neighborhood Certificate of Appropriateness NCOA
Street Address: won't validate 116 S. I 1TH AVE Bozeman MT 5.9715(,existing house
project on existing garage
West Park ADD,S1 2,T02 S, R05 E Block 6,Lot 9& 10
Legal Description:
Small addition to existing detached garage off alley.Construct efficiency
studio or 1 bedroom ADU above a portion ofgarage.The existing garage
Description of Project: has a portion within the typical setback,thus a deviation or variance may be
required?
Current Zoning: R-4 Residential High Density District
Existing Use: Residential
Proposed Use: Residential
Gross Lot Area: 6043
Number of Buildings: I
Type and Number of Dwellings: 1
Building Size(SF): 922
Non-Residential Building Size(SF): 0
Building Height(ft):
Affordable Housing (Y/N): No
Departure/Deviation Request(Y/N): Yes
Zoning Verification Expedited (Y/N): No
PROPERTY OWNER
Company Name: OWNER
Name: Mark and Patricia Sherman
Full Address: 116 S. 1 1th Ave,Bozeman, MT 59715
Email: msherman@keweenaw.com
Phone: WqR4 066)1 -3
APPLICANT
Company Name: Miller Design Build
Name: Scott Miller
Full Address: PoBox 2016,Bozeman, Montana 59771
Email: millerdesignbuild@gmaii.com
REPRESENTATIVE
Company Name: Miller Design Build
Name: Scott Miller
Full Address: PoBox 2016,Bozeman,Montana 59771
Email: millerdesignbuild@gmail.com
Phone: (406)531-9671
CERTIFICATIONS AND SIGNATURES
Applicant signature is captured electronically at time of application submittal.This application PDF must also be
signed by the property owner(s)for all application types before the submittal will be accepted.The only exception
to this is an informal review application that may be signed by the applicant(s)only.The applicant(s)and property
owner(s)submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is
further indicated that anywork undertaken to complete a development approved by the City of Bozeman shall be
in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by
the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed
for my project. Further, I agree to grant City personnel and other review agency representative's access to the
subject site during the course of the review process(Section 38.200.050, BMC).I(We)hereby certify that the
above information is true and correct to the best of my(our)knowledge.
Certification of Completion and Compliance-I understand that conditions of approval may be applied to the
application and that I will comply with any conditions of approval or make necessary corrections to the application
materials in order to comply with municipal code provisions.
Statement of Intent to Construct Accord' the Final Plan-I acknowledge that construction not in
compliance with the approved fi I,�Ian M ro&ult in delays of pccupanc or costs to correct noncompliance.
Property Owner Signature:,
Printed Name: Mark and Patricia Sherman
CONTACT US
Alfred M.Stiff Professional Building phone 406-582-2260
20 East Olive Street fax 406-582-2263
Bozemn,MT 59715 planning@bozeman.net
www.bozeman.net/planning