Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
001_SP001_COVER SHEET
1. AIA DOCUMENT A201, GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION APPLIES TO THIS PROJECT AND SHALL BE INCORPORATED IN THE SERVICES PROVIDED BY THE GENERAL CONTRACTOR. 2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB SITE CONDITIONS BEFORE COMMENCING WORK AND SHALL REPORT ANY DISCREPANCIES TO THE ARCHITECT. 3. USE WRITTEN DIMENSIONS. DO NOT SCALE DRAWINGS. WHERE NO DIMENSION IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4. THE DESIGN, ADEQUACY, AND SAFETY OF ERECTING, BRACING, SHORING, TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND HAS NOT BEEN CONSIDERED BY AN ENGINEER. THE CONTRACTOR IS RESPONSIBLE FOR THE STABILITY OF THE STRUCTURE PRIOR TO THE COMPLETION OF WALLS, CEILING, AND FINISH MATERIALS. 5. GENERAL CONTRACTOR TO COORDINATE ARCHITECTURAL DRAWINGS WITH MECHANICAL, ELECTRICAL, AND PLUMBING. 6. ALL MATERIALS AND FINISHES ARE TO BE AS SPECIFIED, OR PRE-APPROVED EQUAL. 7. SUBSTITUTIONS SHALL BE BY APPROVAL PRIOR TO THE BID, OR INDICATED AS A LINE ITEM ON THE BID AS AN ALTERNATE TO THE BASE BID. SEE SPECIFICATIONS IF AND WHEN APPLICABLE. 8. CONTRACTOR IS TO USE WATER-RESISTANT GYPSUM WALL BOARD IN ALL WET SPACES (RESTROOMS, JANITORIAL AREAS, MECHANICAL/PLUMBING ROOMS, FOOD SERVICE ROOMS, ETC.) 9. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS, SHOWING ANY CHANGES TO PLANS, ELEVATIONS, SYSTEMS, DIMENSIONING, ETC. GENERAL PROJECT NOTES LIST OF ABBREVIATIONS AP ACCESS PANEL ACT ACOUSTIC CEILING TILE ALT ALTERNATE AB ANCHOR BOLT ∠ANGLE APPD APPROVED APPR APPROXIMATE ARCH ARCHITECTURAL ASPH ASPHALT @ AT AVE AVERAGE BM BEAM BRG BEARING BM BENCH MARK BLKG BLOCKING BD BOARD BS BOTH SIDES BOT BOTTOM BRK BRICK DS DOWN SPOUT D DRYER EA EACH E EAST ELEC ELECTRIC EL ELEVATION EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXT EXTERIOR FT FEET FIN FINISH FF FINISHED FLOOR FE FIRE EXTINGUISHER FIX FIXTURE FL FLOOR FD FLOOR DRAIN FT FOOT FTG FOOTING MATL MATERIAL MAX MAXIMUM MTL METAL MIN MINIMUM MISC MISCELLANEOUS MOD MODULAR MECH MECHANICAL NOM NOMINAL N NORTH NTS NOT TO SCALE NO NUMBER OC ON CENTER OPNG OPENING OPP OPPOSITE OVHD OVERHEAD PTD PAINTED PNL PANEL PTN PARTITION PERM PERMANENT SERV SERVICE SHT SHEET SHTHG SHEATHING SIM SIMILAR S SOUTH SPEC SPECIFICATION SQ SQUARE STD STANDARD STL STEEL STG STORAGE STRUCT STRUCTURAL SYS SYSTEM THRU THROUGH T&G TONGUE AND GROOVE TR TREAD TYP TYPICAL UNO UNLESS NOTED OTHERWISE VIF VERIFY IN FIELD VP VENT PIPE BLDG BUILDING CAB CABINET CLG CEILING CL CENTER LINE CC CENTER TO CENTER CER CERAMIC CIR CIRCLE CLR CLEAR COL COLUMN CONC CONCRETE CMU CONCRETE MASONRY UNIT CONST CONSTRUCTION CONT CONTINUE CT CERAMIC TILE DP DAMP ROOFING DIA DIAMETER DIM DIMENSION DW DISHWASHER DN DOWN FND FOUNDATION GALV GALVANIZE GA GAGE GL GRADELINE GWB GYPSUM WALL BOARD HDWD HARDWOOD HT HEIGHT HOR HORIZONTAL HB HOSE BIB IN INCH INSUL INSULATION INT INTERIOR JT JOINT JST JOIST LAM LAMINATE LAV LAVATORY LG LENGTH LT LIGHT MFG MANUFACTURING PERP PERPENDICULAR PL PLATE PLMB PLUMBING PT POINT LB POUND PSI POUNDS PER SQUARE INCH PREFAB PREFABRICATED QTY QUANTITY R RADIUS REF REFRIGERATOR REG REGISTER REINF REINFORCE REQD REQUIRED REV REVISION R RISER RFG ROOFING RM ROOM SCHED SCHEDULE SECT SECTION VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD WTP WATERPROOFING WP WEATHERPROOF WH WEEPHOLE WT WEIGHT W WEST W WIDTH WDW WINDOW WG WIRE GLASS W/O WITH OUT WD WOOD WM WASHING MACHINE PROJECT DIRECTORY OWNER: THRIFTWAY SUPER STOP 2000 HOLMES AVE BUTTE, MT 59701 (406) 434.2305 CONTACT: LOUIE SUTEY ARCHITECT: BECHTLE ARCHITECTS 4515 VALLEY COMMONS DRIVE #201 BOZEMAN, MT 59718 (406) 585.4161 CONTACT: NICK FULTON GENERAL CONTRACTOR: MARKOVICH CONSTRUCTION 2827 LEXINGTON AVE BUTTE, MT 59701 (406) 494.3901 CONTACT: COREY MARKOVICH CIVIL ENGINEER: C&H ENGINEERING 1091 STONERIDGE DRIVE BOZEMAN, MT 59715 (406) 587.1115 CONTACT: RYAN HUDOCK STRUCTURAL ENGINEER: C&H ENGINEERING 1091 STONERIDGE DRIVE BOZEMAN, MT 59715 (406) 587.1115 CONTACT: MAX JOHNSON ELECTRICAL ENGINEER: CONSULTING DESIGN SOLUTIONS, INC. 7540 CHURCHILL ROAD MANHATTAN, MT 59741 (406) 282.7082 CONTACT: TANNER WHITLOCK MECHANICAL ENGINEER: CONSULTING DESIGN SOLUTIONS, INC. 7540 CHURCHILL ROAD MANHATTAN, MT 59741 (406) 282-7082 CONTACT: CHRISTOPHER DOYLE LANDSCAPE ARCHITECT: INCONTOUR 109 E OAK ST, STE 1F BOZEMAN, MT 59715 (406) 624.9111 CONTACT: LESSA RACOW FIRE SPRINKLER DESIGN: COFFMAN ENGINEERING 2011 N. 22ND AVE, SUITE 4 BOZEMAN, MT (406) 582.1936 CONTACT: ROBERT BLAKEMAN PROJECT SITE: S/2 SW/4 SW/4 SW/4 of Section 35, T1S, R53 3295 BAXTER LANE BOZEMAN, MT 59718 CODE INFORMATION: APPLICABLE CODES: (STATE OF MONTANA) -INTERNATIONAL BUILDING CODE, 2021 EDITION -UNIFORM PLUMBING CODE, 2021 EDITION -INTERNATIONAL MECHANICAL CODE, 2021 EDITION -INTERNATIONAL FUEL GAS CODE, 2021 EDITION -NATIONAL ELECTRICAL CODE, 2021 EDITION -INTERNATIONAL ENERGY CONSERVATION CODE, 2021 EDITION -NFPA 99C, 2021 EDITION ZONING: B2 FIRE SPRINKLERS: Y BUILDING CONSTRUCTION TYPE: VB BUILDING OCCUPANCY TYPE: MIXED M / B / S2 BUILDING OCCUPANCY LOAD: 111 ALLOWABLE BUILDING HEIGHT: 60 FEET ACTUAL BUILDING HEIGHT: 37'-3" BUILDING AREA: MAIN LEVEL: 8,331 SF UPPER LEVEL: 1,521 SF TOTAL: 9,852 SF PROJECT INFORMATION A101 1 SIM A ROOM TAG WINDOW NUMBER DOOR NUMBER DETAIL CALLOUT PLAN NOTE GRID HEAD NORTH ARROW PROJECT SYMBOLS SECTION HEAD WALL SECTION HEAD SPOT ELEVATION 1 A101 SIM 1 A101 SIM ROOM NAME 101 Wx1 XXX X THIS ACKNOWLEDGES THAT THE FOLLOWING PROJECT WAS DESIGNED BY BECHTLE ARCHITECTS WITH FULL KNOWLEDGE THAT THE CITY OF BOZEMAN BUILDING DIVISION WILL NOT REVIEW FOR COMPLIANCE WITH, NOR IS RESPONSIBLE FOR ENFORCEMENT OF THE FEDERAL AMERICANS WITH DISABILITIES ACT OF 1990, THE REHABILITAITON ACT OF 1973, THE FAIR HOUSING AMENDMENTS ACT OF 1988, TITLE 49, CHAPTER 2, COMMONLY KNOWN AS THE MONTANA HUMAN RIGHTS ACT, OR OTHER SIMILAR FEDERAL, STATE, OR LOCAL LAWS THAT MANDATE ACCESSIBILITY TO COMMERCIAL CONSTRUCTION OR MULTIFAMILY HOUSING. ADA CERTIFICATION RETAIL STORE AND SERVICE ESTABLISHMENTS: 1 PER 300 SQUARE FEET; 5,121 SF X 0.85 = 4,352 / 300 = 14 SPACES STORAGE: 1 SPACE PER 1,000 SQUARE FEET OF FLOOR AREA DEVOTED TO STORAGE OF GOODS; 2836 SF X 0.85 = 2,410 / 1000 = 2 SPACE OFFICE: 1 PER 250 SQUARE FEET; 1,521 SF X 0.85 = 1,365 / 250 = 5 SPACES FUEL BAY: 1 PER BAY 12 BAYS = 12 SPACES TOTAL REQUIRED PARKING: 33 SPACES (2 ADA) PROVIDED: 47 BIKE PARKING: 10% OF REQUIRED VEHICULAR PARKING; 5 PROVIDED: 4 PARKING CALCULATIONS BUILDING: 8,331 SF + 1521 SF = 9,852 SF TOTAL SITE: 219,368 SF AREA OF DEVELOPMENT: 162,100 SF 9,852 SF / 219,368 SF= 4.5% FLOOR AREA RATIO REQUIRED: 2% OF SITE DEVELOPMENT AREA = 162,100 SF X .02 = 3,242 SF PROVIDED: 7,396 SF (SEE LANDSCAPE DWGS L1.1) OPEN SPACE SITE AREA: 5.036 ACRES; 219,368 SF BUILDING FOOTPRINT: 8,331 SF HARDSCAPE: 128,247 SF LANDSCAPED: 82,790 SF -INSTALLED LANDSCAPE: 25,522 SF -WEEDED & UNDISTURBED: 57,268 SF LOT COVERAGE VICINITY MAP PROJECT SITE BAXTER LANEDAVIS LANEOUTSIDE CITY LIMITS BLOCK FRONTAGE: LANDSCAPED SIDE: 5'-0" FRONT: 10'-0" REAR: 10'-0" SETBACKS NAC Scott Bechtle 1914 ES D A R NLECITS H TCETIANETfoOM T ABECHTLE ARCHITECTS Any unauthorized reproduction or use of this information without the expressed written consent of Bechtle Architects is a violation of U.S. copyright laws. Copyright © 2022 Bechtle ArchitectsJOB:4515 Valley Commons Drive #201 Bozeman, MT 59718406.585.4161 ph 406.585.6919 faxBECHTLEARCHITECTS3/3/2023 9:52:00 AMTHRIFTWAY SUPER STOPBOZEMAN, MONTANA2048 SP001 COVER SHEET PERMIT / BID DOCUMENTS FEB. 6, 2023 BOZEMAN, MONTANA THRIFTWAY SUPER STOP ARCHITECTURAL SP SP001 COVER SHEET 03/03/23 SP101 FLOOR PLAN - MAIN 01/12/22 SP102 FLOOR PLAN - UPPER LVL 01/12/22 SP103 ROOF PLAN 01/12/22 SP201 EXTERIOR ELEVATIONS 02/21/23 SP202 EXTERIOR ELEVATIONS 02/21/23 SP203 MATERIAL SELECTION 09/09/22 SP901 3D VIEWS 01/12/22 SP2103 CANOPY PLAN 09/09/22 CIVIL SPR C1.0 COVER SHEET 10/03/22 C2.0 CIVIL SITE PLAN 10/03/22 C3.0 UTILITY PLAN 10/03/22 C4.0 SITE GRADING & DRAINAGE PLAN 10/03/22 C5.0 DETAILS 10/03/22 C5.1 DETAILS 10/03/22 C5.2 DETAILS 10/03/22 C5.3 DETAILS 11/01/22 ELECTRICAL SP ES1.1 ELECTRICAL SITE PLAN 09/27/22 ES1.2 PHOTOMETRIC CALCULATION 09/27/22 ES1.3 PHOTOMETRIC CALCULATION CONTINUED 09/27/22 ES1.4 SITE ELEVATIONS 09/27/22 ES1.5 LIGHTING CUT SHEETS 11/16/21 ES1.6 LIGHTING CUT SHEETS 11/16/21 LANDSCAPE SPR L1.1 PLANTING PLAN 03/01/23 L1.2 PLANT SCHEDULE & NOTES 03/01/23 L1.3 PLANTING DETAILS 03/01/23 L2.1 SCHEMATIC IRRIGATION PLAN 03/01/23 L2.2 SCHEMATIC IRRIGATION SCHEDULE & NOTES 03/01/23 2 2.21.23 2 2.21.23 REVISION SCHEDULE No. Description Date 2 SPR-2 2.21.23