Loading...
HomeMy WebLinkAbout002 CILWR Correspondence erik@mad-eng.com From: Griffin Nielsen <GNielsen@BOZEMAN.NET> Sent: Thursday, December 2, 2021 10:03 AM To: erik@mad-eng.com Cc: Danielle Garber; Mikaela Schultz Subject: RE: Upland Way Condominiums Attachments: Untitled attachment 00470.txt; Untitled attachment 00473.htm Erik, The existing CILWR credit associated with the property is sufficient to cover the development's annual demand, no CILWR fee is required. Below is a summary of the existing credit and proposed annual demand. Existing Credit: 14.61 Acre-feet (AF) Upland Way Residential Demand: 5.208AF (42 units @ 0.124AF/unit) Upland Way Landscaping Demand: 1.23AF (per Sheet L2.1) Remaining Credit: 14.61AF—5.208AF-1.23AF= 8.172AF Please let me know if you have any questions. Regards, City of Bozeman MT Grlllln Nielsen, F'E1 Engineering Department 406.582.2280 gnielsen(5)bozeman.net From: erik@mad-eng.com<erik@mad-eng.com> Sent: Monday, November 22, 2021 11:18 AM To:Griffin Nielsen <GNielsen@BOZEMAN.NET> Subject: RE: Upland Way Condominiums CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Griffin, Just giving you a follow up on this email. I believe our current Upland Way Condominiums Site Plan submittal is under review now. If you need anything additional information regarding the CILWR let me know and I will forward. If you need any additional information feel free to ask. Erik Ringsak, El, CMI Madison Engineering, LLC 895 Technology Boulevard, Suite 203 Bozeman, MT 59718 406.586.0262 office 1 erik@mad-ens.com i MADISON ENGINEERING From: erik@mad-eng.com <erik@mad-eng.com> Sent: Wednesday, November 3, 2021 10:57 AM To: 'Griffin Nielsen'<GNielsen@BOZEMAN.NET> Cc: 'Lessa Racow' <lessa@incontour.com> Subject: RE: Upland Way Condominiums Griffin, Sounds good. I believe our landscaping sheets are currently being updated and will be submitted today. I will include this email chain below for our submittal and inform you of when the planning department has logged our updated site plan submittal.Thank you for the information. If you need any additional information feel free to ask. Erik Ringsak, EI,CMI Madison Engineering, LLC 895 Technology Boulevard,Suite 203 Bozeman, MT 59718 406.586.0262 office erik@mad-ens.com MADISON ENGINEERING From: Griffin Nielsen<GNielsen@BOZEMAN.NET> Sent:Wednesday, November 3, 2021 10:53 AM To: erik@mad-eng.com Subject: RE: Upland Way Condominiums Erik, Based on the information presented no CILWR fee is required for the project. I do still need the irrigation demands for my records but don't anticipate a demand high enough to warrant payment. Either you can send me the landscaping sheet(s) with the demands noted or just let me know when Planning has logged the site plan submittal and I'll pull the sheets from the file.This email will satisfy the submittal requirements. Just a heads up our Water Adequacy Code (BMC 38.410.130) has since been updated from Brian's response. Our CILWR fee is now triggered for demand changes in excess of 0.25AF rather than 1AF. Thanks, City of Bozeman MT Griffin IIlielsen, F'EJ Engineering Department 406.582.2280 2 gnielsen(�D-bozeman.net From:erik@mad-eng.com <erik@mad-eng.com> Sent:Tuesday, November 2, 20218:20 AM To: Griffin Nielsen<GNielsen@BOZEMAN.NET> Subject: Upland Way Condominiums CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Griffin, Attached above is the Cash in Lieu of Water of Rights for Upland Way Condominiums. Also included is previous correspondence between Brian Heston and the previous Engineer. We recently submitted this to Bozeman Planning for review with our Site Plan submittal. Danielle Garber sent me an email stating that I need your approval before they can start the review process.According to Bill Pratt, we are on an extreme time crunch to resubmit via cloud link before everything transitions this Thursday the 4th and will need to utilize the new software. Please review and let me know if you have any questions as soon as possible.Thank you. If you need any additional information feel free to ask. Erik Ringsak, El,CMI Madison Engineering, LLC 895 Technology Boulevard,Suite 203 Bozeman, MT 59718 406.586.0262 office erik@mad-eng.com r - MADISON ENGINEERING 3