HomeMy WebLinkAboutStorm Water Maintenance PlanSTORM WATER MAINTENANCE PLAN
Lot 19, Block 4, Nelson Meadows Subdivision
Lions Gate Condos
City of Bozeman, Montana
THE FOLLOWING PROPERTY OWNER'S RESPONSIBILITIES FOR ROUTINE
INSPECTION AND MAINTENANCE ARE TO BE PERFORMED BY THE
LANDOWNER OR THEIR DESIGNATED AGENT. SHOULD THE PROPERTY
CHANGE OWNERSHIP THESE RESPONSIBILITIES SHALL PASS TO THE NEW
PROPERTY OWNER(S).
1. Routine Maintenance Activities (1-3 month interval)
• Designate no cut zones in the bottom of basins
• Remove trash, leaves, grass clippings and debris from inlets & ponds
• Remove any obstruction to flow
• Establish a chemical free zone in and around the basins
• Inspect for uniform ponding, and that water disappears within three days
of rain events
• Inspect inlets and piping for sediment buildup and/or evidence of erosion
• Check for eroded or channelized areas. Repair immediately, find the
cause and take action to prevent further erosion.
• Inspect structures and pond area for oil sheens
• Inspect ponds for undesirable vegetation or noxious weeds
2. Annual Maintenance Activities (Annually)
• Cut vegetation to 6” and remove clippings
• Re-establish vegetation on eroded and barren areas
• Remove excess sediment build-up in inlets, piping and ponds
• Update maintenance plan and inspection log
• Clear and remove accumulated winter sand in parking lots and structures
3. Long Term Maintenance Activities (5-10 year interval)
• Consult a qualified professional to inspect and return storm water basin
back to initial design found on the site plan engineering plans.
• Dredge basin if sediment buildup is greater than 6”
• Re-establish vegetation
• Repair or replace damaged storm water structures and/or piping
22005\Storm Water Maintenance Plan.Doc