Loading...
HomeMy WebLinkAboutStorm Water Maintenance PlanSTORM WATER MAINTENANCE PLAN Lot 19, Block 4, Nelson Meadows Subdivision Lions Gate Condos City of Bozeman, Montana THE FOLLOWING PROPERTY OWNER'S RESPONSIBILITIES FOR ROUTINE INSPECTION AND MAINTENANCE ARE TO BE PERFORMED BY THE LANDOWNER OR THEIR DESIGNATED AGENT. SHOULD THE PROPERTY CHANGE OWNERSHIP THESE RESPONSIBILITIES SHALL PASS TO THE NEW PROPERTY OWNER(S). 1. Routine Maintenance Activities (1-3 month interval) • Designate no cut zones in the bottom of basins • Remove trash, leaves, grass clippings and debris from inlets & ponds • Remove any obstruction to flow • Establish a chemical free zone in and around the basins • Inspect for uniform ponding, and that water disappears within three days of rain events • Inspect inlets and piping for sediment buildup and/or evidence of erosion • Check for eroded or channelized areas. Repair immediately, find the cause and take action to prevent further erosion. • Inspect structures and pond area for oil sheens • Inspect ponds for undesirable vegetation or noxious weeds 2. Annual Maintenance Activities (Annually) • Cut vegetation to 6” and remove clippings • Re-establish vegetation on eroded and barren areas • Remove excess sediment build-up in inlets, piping and ponds • Update maintenance plan and inspection log • Clear and remove accumulated winter sand in parking lots and structures 3. Long Term Maintenance Activities (5-10 year interval) • Consult a qualified professional to inspect and return storm water basin back to initial design found on the site plan engineering plans. • Dredge basin if sediment buildup is greater than 6” • Re-establish vegetation • Repair or replace damaged storm water structures and/or piping 22005\Storm Water Maintenance Plan.Doc