Loading...
HomeMy WebLinkAboutPROJECT NARRATIVEPROJECT NARRATIVE #22226 – LIONS GATE DEVELOPMENT SITE PLAN We are designing seven buildings in the Nelson Meadows subdivision, located on Royal Wolf Way, lot 19 with 1.27 acres. The survey was done by Morrison Maierle, and the design standards and guidelines were created by Locati Architects. We have received preliminary approval from the Architectural Review Committee (ARC) and the comments on the Concept Review by the Bozeman Planning Department. Our client wants to have a cluster of industrial and residential work condominiums. The buildings will have three floors with balconies and loggia. The footprint of one unit is 1,120 SF. The total square footage, including garage, shop, living space, circulation and utility spaces is approximately 2,638 SF. The ratio of industrial to residential is 51:49. The program of the three floors is as follows: Ground floor – a two-car garage, office, stairs, utilities and powder room; Second floor – stairs, living room and kitchen, one bedroom, one office and two baths, plus access to two balconies from the living room and office; Third floor – stairs, master bedroom suite with loggia and a large outdoor open deck with jacuzzi. The configuration of the three building clusters creates an interior yard with all entrances and garage doors facing each other across the open interior space. The other facades consist of a more residential aspect, facing Royal Wolf Way on the south (following BMC) and a view of the Bridger Mountains on the north, with balconies and outdoor decks. The major architecture element is a shed metal roof with cantilevers above the entry and third floor deck. The top of the shed roof is 42’ above grade. All seven units are architecturally consistent, using primarily vertical siding with a combination of wood and glass to create a modern, technical look. All units are connected by a five-foot-wide ADA-compliant sidewalk, within the public right-of-way and connected to planned pedestrian routes. For parking, every unit has a two-car garage and in front of the garage there is space for two vehicles, 20’ x 10’ each. We also provide visitor parking: two spaces on the property and nine spaces on the street. All fire department requirements and waste management requirements were personally vetted and approved by these departments. This includes the location and size of trash enclosures. The design follows the established architecture guidelines of the ARC. The location and footprint follow all required setbacks, including a 50’ watercourse setback and 25’ public trail easement, respecting utility easements, and gas and meter services screens. We are not requesting any variances. We are in the City of Bozeman M-1 zone. The client wants to build all the units at the same time and wants to start as soon as possible in 2022. Once approved, we expect the development to be completed in eighteen months. Concept Review Comments The narrative responds to all comments of the concept review. Ref #1: Info only Ref #2: Info only Ref #3: Resolved Ref #4: Resolved Ref #5: Resolved Ref #6: SLD Waste – Approved by waste management Ref #7: Parkland tracking table included on cover sheet Ref #8: Cash-in-lieu of parkland will be required for this project for the residential component. The size of this project does not facilitate a functional parkland within the project boundaries. Regional parkland facilities proposed, and existing, south of the Frontage Road are logical locations for the application of funding. These existing parks will better serve the small number of residents in Nelson Meadows and the greater community. Ref #9: See revised General Civil and Utility Plan C1.0 Ref #10: See revised General Civil and Utility Plan C1.0 Ref #11: See site plan and landscape plan for meter screening Ref #12: See site plan and landscape plan for gas screening Ref #13: Industrial to residential ratio = 51%:49% Ref #14: The Waivers of Right to Protest were recorded with Nelson Meadows Subdivision and applied to this lot. Copies of the recorded waivers are included with the site plan submittal documents for your records. Ref #15: Cash in lieu of water rights will be paid, if required, prior to site plan approval. Ref #16: All on site storm water will be diverted to the proposed retention pond outside watercourse setback. The construction management plan calls for silt fence along the stream-ditch to protect it from debris during construction. Ref #17: Included in the submittal is a design report with a calculation showing the proposed retention pond will handle the first 0.5 inches of rainfall from a 24-hour storm preceded by 48 hours of no measurable precipitation. Ref #18: There are no release rates because the proposed stormwater pond is a retention pond. Included in the submittal is a design report with a calculation showing the proposed retention pond was sized based on a 10-year, 2-hour storm intensity. Ref #19: Included in the submittal is a figure from the original stormwater design for the entire Nelson Meadows Subdivision which shows groundwater levels are deeper than 3-feet. Ref #20: Included in the submittal is a figure from the original stormwater design for the entire Nelson Meadows Subdivision which shows groundwater levels are deeper than 3-feet. Ref #21: Included in the submittal is a design report with calculations showing maximum daily water demand plus fire flow and the peak hour demand. Ref #22: Peak-hour sanitary sewer demand estimate of 278.79 gallons per hour Ref #23: The proposed pond has been relocated outside the watercourse setback and outside the 25- foot trail easement. However, the underground stormwater pipe and manhole are within the 25-foot trail easement. Please advise if an encroachment permit is a necessary requirement. Ref #24: The total anticipated average daily trips are 101 trips per day and 12 peak p.m. hour trips. See attached traffic letter. Ref #25: Acknowledged Ref #26: All easements are shown, no new easements are necessary. Ref #27: See 003 Site Plan, 031, 032 – updated design Ref #28: See 003 Site Plan, 019, ,022, 027, and 032 Ref #29: See 003 Site Plan – Consultation/approval by Fire Department Ref #30: See 003 Site Plan, 032 – updated design Ref #31: See 003 Site Plan, 031, 032 – updated design Ref #32: See 003 Site Plan, 031, 032 – updated design Ref #33: See 003 Site Plan, 031, 032 – updated design Ref #34: See 003 Ref #35: See 003 Site Plan, 031, 032 – updated design Ref #36: See 003 Site Plan, 031, 032 – updated design Ref #37: All changemarks have been addressed Ref #38: All changemarks have been addressed