Loading...
HomeMy WebLinkAbout035 ARCHITECTURAL SITE DETAILS4' - 4 3/8"C.J.SLOPE TO DOORDUMPSTERBY OWNER6' - 8"16' - 0"6"10' - 8"5' - 0"6"10' - 6"8"10' - 6"6"DUMPSTERBY OWNERC.J.C.J.C.J.C.J.22' - 8"A6.1023A6.10TYP15' - 8"LINE OF ROOF ABOVE 6' - 0"4"2' - 0 3/4"4" SOLID CMU CAP W/ SLOPED TOP, BEVEL END AND CORNER UNITS W/ MATCHING BEVEL -SLOPE INTO ENCLOSURE8" SPLIT FACE CMU FOUNDATION -SEE STRUCTURALGRADE VARIESPROVIDE SELF ADHERED FLASHING MEMBRANE BELOW CAP W/ WEEPS AT 24" O.C. ON BOTH SIDES OF WALL. CONCRETE SLAB -SEE CIVILWEEPS @ 32" O.C.FLASHING -BLOKFLASH COATED METAL DRIP EDGE FLASHING AT EAVE AND RAKE, WITH CONT. CLEATCOMPOSITE SHINGLES, TO MATCH BUILDINGS, WITH FELT UNDERLAYMENTCOATED STEEL PURLINS, SEE STRUCTURAL FOR SIZE AND SPACING, WITH STEEL END CAPSFRT PLYWOOD SHEATHINGMETAL ROOF DECK, SEE STRUCTURALCOATED STEEL BEAM WITH END CAPS, SEE STRUCTURALCOATED STEEL COLUMNS, SEE STRUCTURALG.C. TO VERIFY MIN./MAX. HEIGHT W/ LOCAL JURISDICTIONAL AUTHORITIES & TRASH HAULERSOLID CMU CAPALL EXPOSED STEEL SHALL BE HOT DIP GALVANIZED AND PAINTEDHEAVY DUTY VINYL FENCE GATE TO MATCH ENCLOSURE - INSTALL TURN BUCKLES TO FORM SUPPORT ON BACK SIDE OF GATEGALV. TUBE STEEL GATE FRAMING WITH TURN BUCKLES AT HINGESCANE BOLT -TYP.6" DIA. CONC. FILLED BOLLARD -SEE DETAIL THIS SHEET, SIM.ROOF STRUCTUREOPEN AIR BETWEEN MASONRY WLL AND ROOF6"3' - 0"1"4' - 0"ROUND TOP WITH CONCRETE6" GALVANIZED STEEL PIPE -FILL w/ CONCRETE.SEE PLANS FOR LOCATIONS.SEAL JOINT AROUND POSTGRADE OR PAVEMENT -SEE CIVIL2' -0" DIA. CONCRETE FOUNDATION AREA OF SIGN TO BE 8 SF OR LESS PER BOZEMAN ZONING ORDINANCE SECTION 38.560.060.B.2PROPOSED MONUMENT BASE (MATERIAL TO BE DETERMINED)NOTE: MONUMENT SIGN TO BE SET BACK A MINIMUM OF 5'-0" FROM PROPERTY LINES AND SHALL NOT BE LOCATED SIGHT DISTANCE TRIANGLE5' - 0" (MAXIMUM)ISSUANCE PROJECT NUMBERCopyright © 2022 HDJ Inc. All Rights ReservedC:\1-2020 Revit Projects\2022.0023 ARCH_tiffanya@hdjinc.com.rvt12/2/2022 4:59:07 PM2022.0023NORTH 3RD APARTMENTSDEVCO, LLCA6.10ARCHITECTURALSITE DETAILSN. 3RD AVENUE, BOZEMAN. MT 59715NEW APARTMENTS1/4" = 1'-0"A6.10DUMPSTER ENCLOSURE PLAN11/2" = 1'-0"A6.10DUMPSTER WALL SECTION31/4" = 1'-0"A6.10DUMPSTER ELEVATION21/2" = 1'-0"A6.10BOLLARD DETAIL4NO. DATE DESCRIPTION1 2022.12.22 SITE PLANREVIEW1/2" = 1'-0"A6.10MONUMENT SIGN5