Loading...
HomeMy WebLinkAbout032 EXTERIOR ELEVATIONS - BUILDINGS 4 & 71. PROVIDE COMPOSITE TRIM BLOCKS AT ALL EXTERIOR PENETRATIONS, MOUNTING LOCATIONS, SCUPPERS, LOUVERS, ETC. ON SIDING.2. PAINT ALL EXTERIOR PENETRATIONS, LOUVERS, VENTS, PIPES, COVERS, ETC TO MATCH EXISTING WALL COLOR/FINISH.3. MANUFACTURERS LISTED IN EXTERIOR FINISH SELECTIONS ARE BASIS OF DESIGN PRODUCTS.GENERAL ELEVATION NOTES(APPLIES TO ALL ELEVATION DRAWINGS)EXTERIOR ELEVATIONKEYNOTES1. HORIZONTAL SIDING -FIELD COLOR, COLOR VARIES, SEE EXTERIOR FINISH SELECTIONS AND UNIT MATRIX FOR FIELD COLOR DESIGNATION PER BUILDING NUMBER2. HORIZONTAL SIDING -ACCENT COLOR3. VERTICAL BOARD AND BATTEN SIDING 4. METAL SIDING5. 1X6 CEMENTITIOUS FASCIA BOARD6. 1X4 OVER 1X10 CEMENTITIOUS HORIZONTAL TRIM 7. 1X4 CEMENTITIOUS TRIM AROUND WINDOWS AND DOORS8. ASPHALT ROOFING 9. DECORATIVE BRACKET10. COLUMN -WRAP IN CEMENTITIOUS TRIM BOARD11. GUTTER12. DOWNSPOUT13. DECORATIVE BRACKET14. ELECTRICAL METERS (LOCATIONS VARY, SEE SITE PLAN)15. ADDRESS / BUILDING NUMBER SIGNAGE16. LIGHT FIXTURE -SEE ELECTRICAL17. LOUVER -SEE MECHANICAL#FIRST FLR100' -0"SECOND FLR TOS110' -1 7/8"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"410863712212112111781087161515161612"9"12"9"12"9"STAIR ENTRY101' -0"1717FIRST FLR100' -0"SECOND FLR TOS110' -1 7/8"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"12111784108637121071212138145' - 3"1516161612"9"12"9"12"9"STAIR ENTRY101' -0"171717FIRST FLR100' -0"SECOND FLR TOS110' -1 7/8"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"1412364816STAIR ENTRY101' -0"FIRST FLR100' -0"SECOND FLR TOS110' -1 7/8"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"127364816STAIR ENTRY101' -0"METAL SIDING:MANUFACTURER: BRIDGERSTEELPRODUCT: 1/2" CORRUGATED, 24 GAUGECOLOR: OLD ZINC GRAYEXTERIOR FINISH SELECTIONSVERTICAL BOARD & BATTEN SIDING:MANUFACTURER: JAMES HARDIEPRODUCT: PANEL VERTICAL W/ BATTENCOLOR: ARCTIC WHITEHORIZONTAL LAP SIDING FIELD COLOR A:MANUFACTURER: JAMES HARDIEPRODUCT: PLANK LAP SIDINGLINE: SELECT CEDARMILLCOLOR: MOUNTAIN SAGEHORIZONTAL LAP SIDING FIELD COLOR B:MANUFACTURER: JAMES HARDIEPRODUCT: PLANK LAP SIDINGLINE: SELECT CEDARMILLCOLOR: MONTEREY TAUPEHORIZONTAL LAP SIDING FIELD COLOR C:MANUFACTURER: JAMES HARDIEPRODUCT: PLANK LAP SIDINGLINE: SELECT CEDARMILLCOLOR: BOOTHBAY BLUEACCENT HORIZONTAL SIDING:MANUFACTURER: JAMES HARDIEPRODUCT: PLANK LAP SIDINGLINE:BEADED SMOOTHCOLOR: ASTEROID GRAYPATIO DOORS:MANUFACTURER: THERMA TRUPRODUCT: FIBERGLASS LINE: SMOOTH STARCOLOR: CHESTNUTWINDOWS:MANUFACTURER: ANDERSENPRODUCT: SINGLE HUNG LINE: 100 SERIESCOLOR: WHITEFIBER CEMENT TRIMMANUFACTURER: JAMES HARDIEPRODUCT: TRIM BOARDLINE: 4/4 & 5/4 RUSTICCOLOR: IRON GRAYASPHALT ROOFING:MANUFACTURER: TIMBERLINEPRODUCT: HDZ COLOR: YSTER GRAYTRANSPARENCY CALCULATIONSBUILDINGS 4 & 7 -PARKING SIDEWALL AREA = 5,972 SFTRANSPARENCY AREA = 1,071 SF% TRANSPARENCY PROVIDED = 17.9%BUILDINGS 4 & 7 -STREET SIDEWALL AREA = 5,968 SFTRANSPARENCY AREA = 1,086 SF% TRANSPARENCY PROVIDED = 18.2%ISSUANCE PROJECT NUMBERCopyright © 2022 HDJ Inc. All Rights ReservedC:\1-2020 Revit Projects\2022.0023 ARCH_tiffanya@hdjinc.com.rvt12/5/2022 5:14:12 PM2022.0023NORTH 3RD APARTMENTSDEVCO, LLCA4.2EXTERIORELEVATIONS -BUILDINGS 4 & 7N. 3RD AVENUE, BOZEMAN. MT 59715NEW APARTMENTS1/8" = 1'-0"A4.2BUILDINGS 4 & 7 - STREET SIDE11/8" = 1'-0"A4.2BUILDINGS 4 & 7 - PARKING SIDE31/8" = 1'-0"A4.2BUILDINGS 4 & 7 - SIDE41/8" = 1'-0"A4.2BUILDINGS 4 & 7 - SIDE W/ STAIR2NO. DATE DESCRIPTION1 2022.12.22 SITE PLANREVIEW