Loading...
HomeMy WebLinkAbout031.2 EXTERIOR ELEVATIONS - BUILDINGS 3 & 51. PROVIDE COMPOSITE TRIM BLOCKS AT ALL EXTERIOR PENETRATIONS, MOUNTING LOCATIONS, SCUPPERS, LOUVERS, ETC. ON SIDING.2. PAINT ALL EXTERIOR PENETRATIONS, LOUVERS, VENTS, PIPES, COVERS, ETC TO MATCH WALL COLOR/FINISH.3. MANUFACTURERS LISTED IN EXTERIOR FINISH SELECTIONS ARE BASIS OF DESIGN PRODUCTS.GENERAL ELEVATION NOTES(APPLIES TO ALL ELEVATION DRAWINGS)EXTERIOR ELEVATIONKEYNOTES1. HORIZONTAL SIDING -FIELD COLOR, COLOR VARIES, SEE EXTERIOR FINISH SELECTIONS AND UNIT MATRIX FOR FIELD COLOR DESIGNATION PER BUILDING NUMBER2. HORIZONTAL SIDING -ACCENT COLOR3. VERTICAL BOARD AND BATTEN SIDING 4. METAL SIDING5. 1X6 CEMENTITIOUS FASCIA BOARD6. 1X4 OVER 1X10 CEMENTITIOUS HORIZONTAL TRIM 7. 1X4 CEMENTITIOUS TRIM AROUND WINDOWS AND DOORS8. ASPHALT SHINGLES OVER UNDERLAYMENT 9. DECORATIVE BRACKET10. COLUMN -WRAP IN CEMENTITIOUS TRIM BOARD11. GUTTER12. DOWNSPOUT13. DECORATIVE BRACKET14. ELECTRICAL METERS AND EQUIPMENT (LOCATIONS VARY) -SEE ELECTRICAL15. ADDRESS / BUILDING NUMBER SIGNAGE -COORDINATE WITH OWNER16. LIGHT FIXTURE -SEE ELECTRICAL17. LOUVER -SEE MECHANICAL18. RIDGE VENT#FIRST FLR100' -0"SECOND FLR TOS109' -7 7/8"ROOF BEARING137' -0 3/4"THIRD FLR119' -3 3/4"FOURTH FLR128' -11 5/8"127364810271281145' - 6" (MIDPOINT OF ROOF)8107137111616161512"10"12"10"2A5.117171A6.12A6.112"10"12"10"188' - 1 1/8"9' - 7 7/8"9' - 7 7/8"9' - 7 7/8"FIRST FLR100' -0"SECOND FLR TOS109' -7 7/8"ROOF BEARING137' -0 3/4"THIRD FLR119' -3 3/4"FOURTH FLR128' -11 5/8"12143648163A5.1188' - 1 1/8"9' - 7 7/8"9' - 7 7/8"9' - 7 7/8"TRANSPARENCY CALCULATIONSBUILDINGS 3 & 5 -PARKING SIDEWALL AREA = 7,229 SFTRANSPARENCY AREA = 1,439 SF% TRANSPARENCY PROVIDED = 19.9%BUILDINGS 3 & 5 -STREET SIDEWALL AREA = 7,278 SFTRANSPARENCY AREA = 1,426 SF% TRANSPARENCY PROVIDED = 19.6%ISSUANCE PROJECT NUMBERCopyright © 2023 HDJ Inc. All Rights ReservedC:\1-2020 Revit Projects\2022.0023 ARCH_tiffanya@hdjinc.com.rvt2/21/2023 2:08:27 PM2022.0023NORTH 3RD APARTMENTSNORTH 3RD APARTMENTS, LLCA4.2BEXTERIORELEVATIONS -BUILDINGS 3 & 5N. 3RD AVENUE, BOZEMAN. MT 59715NEW APARTMENTS1/8" = 1'-0"A4.2BBUILDINGS 3 & 5 - PARKING SIDE11/8" = 1'-0"A4.2BBUILDINGS 3 & 5 - SIDE2NO. DATE DESCRIPTION1 2023.02.21 SITE PLANRESPONSE #1