Loading...
HomeMy WebLinkAbout031 EXTERIOR ELEVATIONS - BUILDINGS 2, 3, 5 & 61. PROVIDE COMPOSITE TRIM BLOCKS AT ALL EXTERIOR PENETRATIONS, MOUNTING LOCATIONS, SCUPPERS, LOUVERS, ETC. ON SIDING.2. PAINT ALL EXTERIOR PENETRATIONS, LOUVERS, VENTS, PIPES, COVERS, ETC TO MATCH EXISTING WALL COLOR/FINISH.3. MANUFACTURERS LISTED IN EXTERIOR FINISH SELECTIONS ARE BASIS OF DESIGN PRODUCTS.GENERAL ELEVATION NOTES(APPLIES TO ALL ELEVATION DRAWINGS)EXTERIOR ELEVATIONKEYNOTES1. HORIZONTAL SIDING -FIELD COLOR, COLOR VARIES, SEE EXTERIOR FINISH SELECTIONS AND UNIT MATRIX FOR FIELD COLOR DESIGNATION PER BUILDING NUMBER2. HORIZONTAL SIDING -ACCENT COLOR3. VERTICAL BOARD AND BATTEN SIDING 4. METAL SIDING5. 1X6 CEMENTITIOUS FASCIA BOARD6. 1X4 OVER 1X10 CEMENTITIOUS HORIZONTAL TRIM 7. 1X4 CEMENTITIOUS TRIM AROUND WINDOWS AND DOORS8. ASPHALT ROOFING 9. DECORATIVE BRACKET10. COLUMN -WRAP IN CEMENTITIOUS TRIM BOARD11. GUTTER12. DOWNSPOUT13. DECORATIVE BRACKET14. ELECTRICAL METERS (LOCATIONS VARY, SEE SITE PLAN)15. ADDRESS / BUILDING NUMBER SIGNAGE16. LIGHT FIXTURE -SEE ELECTRICAL17. LOUVER -SEE MECHANICAL#FIRST FLR100' -0"SECOND FLR TOS110' -1 7/8"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"127364810271281145' - 6" (MIDPOINT OF ROOF)8107137111616161512"9"12"9"STAIR ENTRY101' -0"1717FIRST FLR100' -0"ROOF BEARING138' -6 3/4"THIRD FLR120' -3 3/4"FOURTH FLR130' -5 5/8"1214364816BLDG 1 ROOF BRG110' -1 3/8"STAIR ENTRY101' -0"TRANSPARENCY CALCULATIONSBUILDINGS 2, 3, 5 & 6 -PARKING SIDEWALL AREA = 7,229 SFTRANSPARENCY AREA = 1,439 SF% TRANSPARENCY PROVIDED = 19.9%BUILDINGS 2, 3, 5 & 6 -STREET SIDEWALL AREA = 7,278 SFTRANSPARENCY AREA = 1,426 SF% TRANSPARENCY PROVIDED = 19.6%ISSUANCE PROJECT NUMBERCopyright © 2022 HDJ Inc. All Rights ReservedC:\1-2020 Revit Projects\2022.0023 ARCH_tiffanya@hdjinc.com.rvt12/5/2022 5:14:03 PM2022.0023NORTH 3RD APARTMENTSDEVCO, LLCA4.1BEXTERIORELEVATIONS -BUILDINGS 2, 3, 5 &6N. 3RD AVENUE, BOZEMAN. MT 59715NEW APARTMENTS1/8" = 1'-0"A4.1BBUILDINGS 2, 3, 5 & 6 - PARKING SIDE11/8" = 1'-0"A4.1BBUILDINGS 2, 3, 5 & 6 - SIDE2NO. DATE DESCRIPTION1 2022.12.22 SITE PLANREVIEW