Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
003 DEMOLITION AND EROSION CONTROL PLAN
N THIRD AVE N FOURTH AVE ASPEN STREETCOTTON WOOD STREETWEST PEACH STREET© NORTH 3RD APARTMENTS PREPARED FOR NORTH 3RD APARTMENTS, LLC.®BEFORE YOU DIG, CALL1-800-424-5555 ASD REG REGNORTH PROPERTY LINESILT FENCE (SC-1)TEMPORARY INTERCEPTOR SWALEAPPROXIMATE LIMITS OF WORKSTORM DRAIN INLET FILTER PROTECTION (SC-10)DEMO EXISTING SITE TREECHECK DAM SPACED EVERY 100 FEET (SC-4)CONSTRUCTION ENTRANCE (TC-1, TC-3)DEMO EXISTING CONCRETE PILESTOCKPILE STAGING AREASEDIMENT TRAP (SC-3)30 CY ROLL OFF TRASH CONTAINERPROTECT EXISTING SITE FEATURE IN PLACEEXISTING EASEMENT TO BE RELINQUISHEDEXISTING LOTS TO BE CONSOLIDATEDDEMO NOTES1.THIS DEMOLITION PLAN IS INTENDED TO AID THE CONTRACTORDURING THE BIDDING AND CONSTRUCTION PROCESS AND IS NOTINTENDED TO DEPICT EACH AND EVERY ELEMENT OF DEMOLITION.THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING THE DETAILEDSCOPE OF DEMOLITION AND FOR THE DEMOLITION, REMOVAL, ORRELOCATION OF ITEMS IN CONFLICT WITH THE PROPOSEDCONSTRUCTION.2.CONTRACTOR IS TO RESTORE ALL OFF-SITE DISTURBED AREAS TOEXISTING CONDITIONS AFTER CONSTRUCTION.3.LOCATIONS OF EXISTING UTILITIES ARE FOR REFERENCE ONLY.CONTRACTOR IS TO FIELD VERIFY THE HORIZONTAL AND VERTICALLOCATIONS PRIOR TO CONSTRUCTION.4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATIONOF WORK WITH REPRESENTATIVE UTILITY COMPANIES AND FOR THEIMPLEMENTATION OF REQUIRED UTILITY-RELATED WORK.5.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'SREPRESENTATIVE UPON ENCOUNTERING ANY HAZARDOUSMATERIALS DURING DEMOLITION AND/OR CONSTRUCTION ACTIVITIES.THE CONTRACTOR SHALL DOCUMENT THE SAME TO THE OWNER'SREPRESENTATIVE AND OBTAIN DIRECTION AS TO THE APPROPRIATEACTION(S) TO BE TAKEN.6.DISCONNECTION OF SERVICES AND SYSTEMS SUPPLYING UTILITIESTO BE ABANDONED OR DEMOLISHED SHALL BE COMPLETED PRIOR TOOTHER SITE DEMOLITION IN FULL COMPLIANCE WITH APPLICABLECODES, REGULATIONS, AND THE REQUIREMENTS OF THE UTILITYHAVING JURISDICTION. THE CONTRACTOR SHALL BE RESPONSIBLEFOR COORDINATION WITH THE UTILITY, PAYMENT OF ASSOCIATEDFEES AND PROCUREMENT OF ALL NECESSARY PERMITS.7.PRIOR TO REMOVAL OF MATERIALS OVER EXISTING UTILITY SYSTEMS,THE CONTRACTOR SHALL DOCUMENT EXISTING CONDITIONS AND, IFDIFFERENT FROM CONDITIONS AS REPRESENTED ON THE PLANS,NOTIFY THE OWNER'S REPRESENTATIVE AND OBTAIN DIRECTIONS ASTO THE APPROPRIATE ACTION(S) TO BE TAKEN.8.THE CONTRACTOR SHALL PROTECT AND PREVENT DAMAGE TOEXISTING ON-SITE UTILITY DISTRIBUTION FACILITIES THAT ARE TOREMAIN. ACTIVE UTILITY DISTRIBUTION FACILITIES ENCOUNTEREDDURING DEMOLITION AND/OR CONSTRUCTION ACTIVITIES SHALL BESHUT OFF AT THE SERVICE MAIN WITH THE APPROVAL OF THEOWNER'S REPRESENTATIVE.9.DURING DEMOLITION AND/OR CONSTRUCTION ACTIVITIES, THECONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'SREPRESENTATIVE UPON ENCOUNTERING ANY EXISTING UTILITIESAND/OR UTILITY SYSTEM STRUCTURES NOT SHOWN ON THESEPLANS. THE CONTRACTOR SHALL DOCUMENT THE SAME ANDFORWARD THE INFORMATION TO THE RESIDENT ENGINEER /OWNER'S REPRESENTATIVE, AND OBTAIN DIRECTION AS TO THEAPPROPRIATE ACTION(S) TO BE TAKEN.9.CONTRACTOR SHALL SECURE ALL REQUIRED CONSTRUCTIONPERMITS. ANY PAVEMENT REPLACEMENT WITHIN THE RIGHT-OF-WAYSHALL MATCH THE EXISTING PAVEMENT SECTION UNLESSOTHERWISE INDICATED.10.FOR ALL UTILITIES TO BE RELOCATED, THE SERVICE SHALL NOT BEINTERRUPTED WITHOUT PRIOR WRITTEN APPROVAL FROM THEOWNER.11.CONTRACTOR IS RESPONSIBLE TO SAFEGUARD THE SITE ASNECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER ASTO PREVENT THE ENTRY OF UNAUTHORIZED PERSONS AT ANY TIME.12.THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTINGITEMS/CONDITIONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDEDTO PROVIDE DIRECTION OTHER THAN THAT ALL METHODS ANDMEANS ARE TO BE IN ACCORDANCE WITH STATE, FEDERAL, LOCAL,AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BERESPONSIBLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONSNECESSARY TO PROVIDE A SAFE WORK SITE.DEMOLITION AND EROSION CONTROL PLANC1.00LEGEND