HomeMy WebLinkAbout001.2 Project Narrative and CONR ResponseProject Narrative for Site Plan Review
1 of 8
Project Narrative for Site Plan Review
North Third Apartments
Project Overview:
The proposed project, North Third Apartments, will provide approximately 216 affordable housing
units to the City of Bozeman. These units will be a mix of one-, two-, three- and four-bedroom
units and held at 60% AMI affordable levels. The community will include seven residential buildings
and a clubhouse with leasing, lounge, gym, laundry, and barbeque area. Site amenities include a
picnic area, dog park, playground and bike parking. The project will be constructed in one phase
with the goal of starting construction in Spring 2023.
Project Goals and Design Intent
The design intent of the site plan is to provide vehicular and pedestrian connections to the existing
neighborhood. The building facades fit with local design aesthetic and include a mix of materials.
Exterior unit balconies are not included, promoting cleaner, more elegant exterior elevations. The
plans attempt to provide appropriate transitions to neighboring properties and streets. Four story
buildings fit with code and enable delivery of much needed missing-middle housing units. Multi-
modal pedestrian and bike pathway will connect Aspen Street east to west. An additional
pedestrian connection from east to west and one more north to south invite access from the
neighborhood to North Grand Park. The private roadway connecting W Cottonwood St and N 4th
Ave follows the City block grid and frontage plan.
At the perimeter of the site, the goal was to provide the required landscaped mixed frontage along
N 3rd Ave and park-trail(sidewalk) frontage facing Westlake Park. Broadly, we seek to visually
compliment the character of the immediate neighborhood and the greater City of Bozeman. Interior
to the site, the project intends to balance open space, create connections for residents and
neighbors, while providing interior-facing parking. Open space is designed to provide multiple
amenity spaces throughout the site.
North 3rd will be improved to meet current street section code and water, sewer mains will be
extended, and drainage infrastructure will be provided to collect public stormwater runoff in North
3rd along the project’s frontage. Multiple options for snow storage are planned in parking areas
and unused turf areas. Fire lane width and turning radius are per Fire Marshall requirements.
Dumpsters will be screened with enclosures as required in the zoning ordinance, section
38.520.070.C. Existing public stormwater infrastructure at the north terminus of North Fourth
Avenue will be rerouted around a proposed building, and a new public easement will be provided.
A 12’ minimum width paved vacuum truck access is provided along the new alignment of the
stormwater conveyance system. Additionally, a gravel maintenance lot is provided on Westlake
park property. Additional information regarding the existing and proposed utilities is shown below:
Available Utilities
Domestic Water/Irrigation/Fire Service
o The project will provide a looped watermain through the site to provide domestic and
fire sprinkler supply to each building as well as irrigation service for the site. This
watermain will connect to existing 6-inch water main at three locations: Ivan Drive
Project Narrative for Site Plan Review
2 of 8
and North 3rd Ave on the north side, and through North 4th Ave into West Peach
Street. The existing watermains in the vicinity are shown below.
o
o
Sanitary sewer
o A new sewer main will be extend through the proposed development and connect to
the existing manhole and 8-inch sewer at the southern end of Ivan Drive.
o
o A new sanitary sewer main in North 3rd is also proposed and will be connected to
each of our (3) eastern buildings.
Storm drainage
o The project proposes to reroute existing public storm drainage at the north end of
North 4th Ave around a proposed building. The project will convey large storm event
Project Narrative for Site Plan Review
3 of 8
overflows to this system and will provide required retention onsite through an
underground infiltration facility at the north end of the site.
o
Dry utilities
o Power, natural gas and telecommunications are all available in North 3rd Ave and
will be routed underground as needed throughout the project to service the proposed
buildings.
Surrounding Uses
The project is surrounded to the east and north by single family attached and detached residences.
Immediately to the west lies Westlake Park, and to the south are two multifamily residential
developments.
Responses to Concept Site Plan Review Comments:
The following provides the initial comment provided by the city with responses from Hooker DeJong
(HDJ) or Kimley-Horn (KH) in red following the initial comment. Comments are organized by
document types and plan sheets
1. CONR – 001 Project Narrative:
a. Comment from Adam Oliver with Storm Department: The grades and other utilities
in this area will be difficult for rerouting stormwater. See the following plans:
https://weblink.bozeman.net/WebLink/ElectronicFile.aspx?docid=184579&&dbid=0
and
https://weblink.bozeman.net/WebLink/ElectronicFile.aspx?docid=57836&&dbid=0
Also, access by a large vac truck is required along the easement for routine
maintenance.
KH RESPONSE: The proposed alignment for rerouting the existing storm
main has been coordinated with the Engineering department and is
reflected in these updated plans.
b. Comment from Suzanne Ryan with Engineering Department: A Stormwater
Drainage Plan is required for all new developments. The following criteria shall be
used in the design of all Drainage Plans:
Project Narrative for Site Plan Review
4 of 8
i. The stormwater drainage plan shall be designed to limit stormwater runoff
from the development site to the pre-development runoff rates. The
predeveloped rate calculations shall be included as part of the required
facility design calculations. Adequate on-site stormwater detention shall be
provided for design storm runoff exceeding the pre-development rate.
KH RESPONSE: A stormwater drainage plan and report are included
in this submission. An on-site stormwater retention system is
provided and detailed, including supporting calculations for runoff
and conveyance.
ii. The stormwater storage and treatment facilities shall be designed to remove
solids, silt, oils, grease, and other pollutants. Where required, oil/water
separators shall be provided in the facility design. Any overflow that is
discharged must meet the above requirements for quantity and quality.
KH RESPONSE: The proposed detention/retention facility has been
sized to infiltrate runoff completely. No offsite flows are anticipated
and only an emergency overflow connection is provided for storm
events exceeding the 100-yr, 24-hour storm.
c. Comment from Suzanne Ryan with Engineering Department: From the narrative
and plans it is unclear what improvements will be constructed on 3rd. 3rd will
need to be brought up to City Standards with curb and gutter along both sides and
sidewalk along the side adjacent to this project.
KH RESPONSE: Through coordination with the Engineering Department
proposed full street width and utility improvements have been shown in
these updated plans.
d. Comment from Suzanne Ryan with Engineering Department: Coordinate the
available fire flow within the vicinity of the project with Suzanne Ryan at
sryan@bozeman.net for this information.
KH RESPONSE: A water report has been prepared and is included with this
submission including available fire flow conditions and proposed
calculations.
e. Comment from Suzanne Ryan with Engineering Department: The applicant will
need to submit water and sewer design reports stamped and certified by a
professional engineer licensed in the State of Montana with Site Plan.
KH RESPONSE: Both water and sewer design reports are signed and
included with this submission.
2. CONR – 003 Concept Site & Landscape Plan (sheet C1.0):
a. Comment from Russell Ward with Solid Waste Department: Need to identify
locations for refuse enclosures. Need a detailed plan for refuse enclosures. Refuse
enclosures will need to be covered.
HDJ RESPONSE: See updated site plan sheet C1.0 and Landscape plans for
location of the refuse enclosures. See Architectural Site Detail sheet A6.1.
for details of the covered dumpster enclosure.
Project Narrative for Site Plan Review
5 of 8
b. Comment from Ben Abbey with Building Department: City of Bozeman and the
State of Montana are adopting the new ICC 2021 Building Codes Spring of 2022.
State adopted June 10th. City adoption August 1st, 2022.
HDJ RESPONSE: Noted
c. Comment from Alex Nordquest with Forestry Department: Boulevard trees would
be required as Street Frontage Landscaping. 1 tree every 50' provided there are no
conflicts with above/below ground utilities.
KH RESPONSE: Street trees have been included in the proposed landscape
plan to satisfy this requirement.
d. Comment from Alex Nordquest with Forestry Department: Density of proposed tree
plantings may inhibit sight lines for pedestrians and vehicles at crosswalks.
Recommend fewer trees at each ped access and/or species that have ideal
form/growth habit to minimize this concern.
KH RESPONSE: low height plantings have been proposed in areas
demanding increased visibility and are specified on the proposed
landscape plan.
e. Comment from Alex Nordquest with Forestry Department: Recommendation: Dog
Park, Playground and other amenities have no proposed trees for shade. Please
consider distributing some of the proposed parking lot trees to these areas to
maximize environmental benefit.
KH RESPONSE: An updated landscaping plan is included in this submission
addressing shade coverage near amenity areas.
f. Comment from Suzanne Ryan with Engineering Department: Spacing standards for
drive access. Drive access must line up with the street to the East or be spaced
at least 40 feet apart.
KH RESPONSE: Lance Leigh in the Engineering Department confirmed that
the driveway spacing originally proposed was sufficient and that same
spacing is reflected in this submission.
g. Comment from Mathew Lee with Parks Department: Department Staff suggests
that applicants explore alternatives to a retaining wall at the base of BMX to
resolve the embankment encroachment. Please explore whether providing
additional parkland in that area, regrading the hill, or an easement would resolve
the issue to avoid the costs of a retaining wall that could instead be put toward
public benefits.
KH RESPONSE: While we await off-site survey for the BMX park to confirm
adjacent slopes are satisfactory every effort has been made on the private
parcel to match existing elevations without the use of walls. Should the
BMX park parcel have slopes exceeding safe levels, remediation of the
condition will be proposed.
Project Narrative for Site Plan Review
6 of 8
h. Comment from Mathew Lee with Parks Department: BMC 38.420.070 - A Linear
Park is strongly recommended at the northern end of the site in line with Aspen
Street connecting directly into Westlake Park to ensure direct bike/ped access into
the park. Parking would be reconfigured to run along Ivan Ave as well. A raised
crossing may be needed at Ivan Ave for this corridor.
HDJ RESPONSE: A bike and pedestrian path has been provided at the north
end of the site.
i. Comment from Mathew Lee with Parks Department: Access for the community
gardens and BMX areas may be achieved via a public access easement over the
proposed driveways. Gated vehicular access into the park is recommended and a
small parking lot is needed to mitigate the loss of frontage and on-street parking.
Community gardens would need to be relocated to accommodate the new drive
and parking area. Additionally, improvements to consider include a shared use
pathway along Aspen Street corridor within Centennial Park and Westlake Park.
HDJ RESPONSE: An access point with maintenance pad is provided at the
community garden at Westlake Park
j. Comment from Lynn Hyde with Planning Department: All buildings must feature
pedestrian connections to a sidewalk. It is difficult to tell if the southwest building
has a safe pedestrian connection to a sidewalk. Refer to 38.520.040.B.
HDJ RESPONSE: The site plan provides connection to building #8 (Building
Type C) from amenity space via a sidewalk, curb ramp, and cross walk
north of the parking area. The parking provided for the building is east of
the drive lane and/or adjacent to the drive connection to Cottonwood
going east south.
k. Comment from Lynn Hyde with Planning Department: Where a pathway is adjacent
to perpendicular or angled parking, an extra two feet of walkway width must be
provided to mitigate for parked vehicles overhanging the walkway. Refer to
38.520.040.D.2
HDJ RESPONSE: Noted. Sidewalks perpendicular to angled parking have
been updated to be 7’-0” in width
l. Comment from Lynn Hyde with Planning Department: For any building that has
residential on the ground floor alongside a sidewalk or internal pathway, the
building must provide at least one transition element in order to ensure privacy
and security for residents and an attractive and safe pathway that complements
the qualities of adjoining residents. The three options are listed in 38.510.030.J.
Note this are intended to be used in tandem with the other block frontage
requirements, not in place. For example, if the residential units are adjacent to the
park, they need to meet both the park requirements as well as the special
residential block frontage standards.
HDJ RESPONSE: Acknowledged. The design shown in site plans and
landscape plans show that option 2 is being followed. A 10-foot setback
from sidewalk with a landscaped area, meeting the provisions of division
38.550 has been provided.
Project Narrative for Site Plan Review
7 of 8
m. Comment from Lynn Hyde with Planning Department: It was suggested the
applicant may desire to remove the ground floor parking and place residential units
there if the parking reductions allow the removal of those parking spaces. Note if
residential units are placed there, they need pedestrian access to each building and
may also require special residential block frontage standards along those
residential units if sidewalks are placed alongside the building.
HDJ RESPONSE: Garages are no longer part of the development and
building plans. See updated floor plans on sheets A1.1, A1.2, and A1.3.
Option 2 listed in 38.510.030.J is being provided at block frontage of the
parking side of buildings.
n. Comment from Lynn Hyde with Planning Department: All buildings facing N 3rd Ave
will need to meet the landscape block frontage requirements found in
38.510.030.C. On future elevations, ensure the facade transparency calculations
are included on the elevations. For residential uses, at least 15% of the entire
facade (all vertical surfaces generally facing the street) must be transparent.
Windows must be provided on all habitable floors of the facade. Please provide
calculations on each facade that requires transparency.
HDJ RESPONSE: Acknowledged. Option 2 listed in 38.510.030.J is being
provided at block frontage. See Exterior Elevation sheets for the facade
transparency calculations.
o. Comment from Lynn Hyde with Planning Department: Where a property fronts onto
a park or a public trail, such frontages must comply with the mixed block
frontages. Refer to 38.510.030.I for trail/park frontage standards.
HDJ RESPONSE: Acknowledged. Option 2 listed in 38.510.030.J is being
provided at block frontage. See Exterior Elevation sheets for the facade
transparency calculations.
3. CONR – 004 Conceptual Utility Plan (sheet C2.0):
a. Comment from Matt Tilstra with NWEnergy Department: Please turn in application
on NWE website to work with construction engineer on utility layout. All primary
(high voltage) electric must be placed in a utility easement. If meters are to be
screened, there needs to be a 4ft clear zone in front of them.
KH RESPONSE: An application has been submitted to NWEnergy but no
direction for connection, routing, alignments has been provided to date.
b. Comment from Suzanne Ryan with Engineering Department: Coordinate with the
engineering department for layout of utilities in this area (North area of site
adjacent to Clubhouse).
KH RESPONSE: Utilities have been coordinated in this area with the
Engineering Department.
Project Narrative for Site Plan Review
8 of 8
c. Comment from Suzanne Ryan with Engineering Department: BMC 38.270.030 The
applicant will need to submit the proposed storm water upgrades through
infrastructure review. The improvements must be certified by a registered civil
engineer in the State of Montana.
KH RESPONSE: We have coordinated the proposed storm water upgrades
with Karl Johnson in the Engineering Department. A drainage report has
also been included in this submission and once feedback is received
infrastructure review will be applied for.
d. Comment from Suzanne Ryan with Engineering Department: BMC 38.410.060 The
current stormwater easement will need to be released and a new stormwater
easement must be provided.
KH RESPONSE: Once agreed upon and when appropriate the proposed
stormwater easement shown in this submission will be recorded.
4. CONR – 005 Site Circulation and Zoning Review (sheet A1):
a. Comment from Lynn Hyde with Planning Department: All street rights-of-way
contiguous to or within the proposed development must provide one large canopy
tree for each 50' of total street frontage, rounded to the nearest whole number.
The species will require review and approval from the City Forester. Refer to
38.550.050.E.
KH RESPONSE: Street trees have been included in the proposed landscape
plan in this submission.
b. Comment from Lynn Hyde with Planning Department: All landscape plans must
include, for each setback with a residential adjacency, at least one canopy or non-
canopy tree for each 50 lineal feet of the adjacent area. Refer to 38.550.050.J
KH RESPONSE: Please see the included proposed landscape plan for details
and information for site trees.
5. CONR – 006 Preliminary Exterior Design Concept (sheet A2):
a. Comment from Lynn Hyde with Planning Department: Was a pedestrian
connection/pathway provided for the building entrances shown on the 'garage' side
of the facade?
HDJ RESPONSE: Garages are no longer part of the development and
building plans. See updated floor plans on sheets A1.1, A1.2, and A1.3
b. Comment from Lynn Hyde with Planning Department: Primary building entrances
must be clearly defined and scaled proportionally to the building. Refer to
38.530.050.E. These entrances are not clearly defined a scaled proportionally at
this time.
HDJ RESPONSE: Acknowledged. The Street side of the building has private
patio entrances. The exterior design has been updated to provide small
canopies that have been scaled up larger to coordinate with overall
building layout.
Project Narrative for Site Plan Review
9 of 8
c. Comment from Lynn Hyde with Planning Department: Metal siding must be a
minimum 24 gauge thickness. Re-purposed metal siding is exempt from this
standard provided its material integrity is intact. Refer to 38.530.060.C.2.
HDJ RESPONSE: Noted. See Exterior finish selections noted on sheet A4.1