Loading...
HomeMy WebLinkAbout038_L2.3_LandscapeDetails3Project Number: Drawn By: Reviewed By: Approved By: Issue Date ThinkOne Architects 101 E Main St. Studio 1 Bozeman, MT, 59715 T: 406-586-7020 Architect MEP Engineer Landscape Architect Civil Engineer Seal Project Number Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 AndersonMasonDale Architects, P.C. 3198 Speer Boulevard Denver, CO 80211 T: 303-294-9448 Associate Architect Structural Engineer Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 1/25/2023 11:24:27 AML2.3 LANDSCAPE DETAILS CS RPE RPE 21-723BARNARD OFFICE HQ 21-723 BOZEMAN, MT ROYAL WOLF WAY01/25/23SITE PLAN SUBMITTAL                         BARNARD CONSTRUCTION PARKING ISLAND - CROSS SECTION N.T.S. 4 L2.1 PERENNIAL/GRASS/GROUNDCOVER PLANTING CURB AND GUTTER; SEE CIVIL 3 L2.1 SHRUB PLANTING 6' 1'-6" 7'6'2' 2 L2.1 DECIDUOUS TREE 8 L2.1 ROCK MULCH 2'CONCRETE FLATWORK; SEE CIVIL 3 L2.2 LED LIGHT BOLLARD 1 PARKING ISLAND W/POCKET PLANTING - CROSS SECTION N.T.S. 8 L2.1 ROCK MULCH SHRUB PLANTING, TO BE POCKET PLANTED ROCK MULCH, TYP. SHRUB PLANTING, TO BE POCKET PLANTED CURB AND GUTTER; SEE CIVIL 1'-3"3"6'7'6'1'-3"3"CONCRETE FLATWORK; SEE CIVIL 3 L2.2 LED LIGHT BOLLARD 2 WEST ENTRY PLAZA - CROSS SECTION N.T.S. PLAZA CONCRETE PAVING 2 L2.2 SEATWALL 4 L2.1 PERENNIAL/GRASS/GROUNDCOVER PLANTING 3 L2.1 SHRUB PLANTING 6 L2.1 SEEDING2'8' CONCRETE FLATWORK; SEE CIVIL 2'2'14' CONCRETE FLATWORK; SEE CIVIL 3 MAIN ENTRY PLAZA - CROSS SECTION N.T.S.2'7'2'3"19'-8"20' 2 L2.1 DECIDUOUS TREE 4 L2.1 PERENNIAL/GRASS/GROUNDCOVER PLANTING 3 L2.1 SHRUB PLANTING PERENNIAL/GRASS/ GROUNDCOVER, TYP. DECIDUOUS TREE, TYP. ORGANIC MULCH, 3" DEPTH PLAZA CONCRETE PAVING CURB AND GUTTER; SEE CIVIL CONCRETE FLATWORK; SEE CIVIL ON-SITE PROCESSED TOPSOILS 4