Loading...
HomeMy WebLinkAbout036_L2.1_LandscapeDetails1Project Number: Drawn By: Reviewed By: Approved By: Issue Date ThinkOne Architects 101 E Main St. Studio 1 Bozeman, MT, 59715 T: 406-586-7020 Architect MEP Engineer Landscape Architect Civil Engineer Seal Project Number Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 AndersonMasonDale Architects, P.C. 3198 Speer Boulevard Denver, CO 80211 T: 303-294-9448 Associate Architect Structural Engineer Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Morrison-Maierle, Inc. 2880 Technology Blvd. Bozeman, MT 59715 T: 406-587-0721 Sanderson Stewart 106 East Babcock St. Suite L1 Bozeman, MT 59715 T: 406-522-9876 1/25/2023 11:11:10 AML2.1 LANDSCAPE DETAILS CS RPE RPE 21-723BARNARD OFFICE HQ 21-723 BOZEMAN, MT ROYAL WOLF WAY01/25/23SITE PLAN SUBMITTAL                         BARNARD CONSTRUCTION 3" DEPTH MULCH FINISH GRADE CONIFEROUS TREE N.T.S. 32" LENGTH NON-ABRASIVE RUBBER TIES AT 1/3 HEIGHT OF TREE (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXT SOIL TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. NOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM TOP 1/2 OF ROOT BALL. 4.REMOVE ALL BASKETS. 5.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 6.BACKFILL WITH AMENDED SOIL. 7.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 8.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 9.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. 3 X DIA ROOT BALL MIN 1 32" LENGTH NON-ABRASIVE RUBBER TIES (2)3" DIA LODGE POLE PINE STAKES 1-1/2' FROM TRUNK. STAKE LOCATION SHALL NOT INTERFERE WITH PERMANENT BRANCHES 3" DEPTH MULCH FINISH GRADE BOTTOM OF ROOT BALL RESTS ON EXT OR RECOMPACTED SOIL EXISTING SOIL DECIDUOUS TREE N.T.S. TOP OF ROOT FLARE 2" ABOVE EXT GRADE. NO SOIL ON ROOT FLARE LOOSENED SOIL. DIG AND TURN THE SOIL TO REDUCE COMPACTION TO THE AREA TO DEPTH OF ROOT BALL. NOTES: 1.REMOVE NURSERY STAKES. 2.PRUNE DEAD OR DAMAGED LIMBS IMMEDIATELY AFTER PLANTING. 3.REMOVE WIRE TIES AND BURLAP FROM ROOT BALL. 4.PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN PLANTING PIT HAS BEEN BACKFILLED, POUR WATER AROUND ROOT BALL TO SETTLE THE SOIL. 5.BACKFILL WITH AMENDED SOIL. 6.REMOVE STAKES FOLLOWING FIRST GROWING SEASON. 7.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. 8.PROVIDE SUPPLEMENTAL WATER FOR THE FIRST YEAR FOLLOWING INSTALLATION. 2 SHRUB PLANTING N.T.S. NOTES: 1.SHRUBS WITH BROKEN OR CRUMBLING ROOT BALLS WILL BE REJECTED. CONTAINER REMOVAL WILL NOT BE AN EXCUSE FOR DAMAGED ROOT BALLS. 2.TOP OF MULCH TO BE 1" BELOW ADJ WALKWAY, CURB, EDGING, OR OTHER SURFACE. 3.PRUNE OUT ALL DAMAGED OR DEAD WOOD. 4.ALL PLANT MATERIAL TO BE INSPECTED UPON DELIVERY. REJECTED MATERIALS TO BE IMMEDIATELY RETURNED TO SOURCE. 6.RAKE SUBGRADE AND REMOVE ALL DEBRIS GREATER THAN 1/2" IN DIA. INCLUDING ROCKS, CONCRETE, ORGANIC DEBRIS, AND OR CONSTRUCTION DEBRIS. TOP OF ROOT BALL SHALL BE 1-2" ABOVE SURROUNDING GRADE 3" DEPTH MULCH, KEEP MULCH AWAY FROM TRUNK REMOVE CONTAINER, LIGHTLY SCARIFY ROOTS PLANT BEDS TO BE AMENDED WITH 12" DEPTH OF TOPSOIL 3 NOTES: 1.REMOVE SPENT FLOWERS PRIOR TO PLANTING. 2.LOOSEN ROOT MASS AT BOTTOM OF ROOTBALL. 3.STRIP TOP OF ROOTBALL 14" OF SURFACE GROWING MEDIA AND COVER WITH 14" PLANTING MIX PLUS SURFACE MULCH. 4.QUANTITY AND SPACING AS NOTED IN PLANT SCHEDULE. SET PLANT AT ORIGINAL DEPTH POTTED PLANT PLANT BEDS TO BE AMENDED WITH 12" TOPSOIL EXISTING SOIL 3" DEEP MULCH KEEP AWAY FROM CROWN OF PLANT PERENNIAL/GRASS/GROUNDCOVER PLANTING N.T.S.4 EXISTING NATIVE TOPSOIL AMEND WITH 2" OF ORGANIC COMPOST REMOVE ALL LARGE DEBRIS AND ROCKS OVER 1/2" EXISTING VEGETATION SEEDING N.T.S. NOTE: 1.EXISTING TOPSOIL WILL BE PLACED BY SITE WORK CONTRACTOR TO ROUGH GRADE 2.LANDSCAPE CONTRACTOR SHALL AMEND SOIL WITH 2" DEPTH OF ORGANIC COMPOST AND TILL INTO EXISTING TOPSOIL AND PREPARE FOR SEEDING.. 3.LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL GRADING AND SEEDING PREPARATION. SEEDED AREA 6 PERMALOC CLEANLINE ALUMINUM EDGING (TOP OF EDGING TO BE MAXIMUM OF 12" (12.7MM) ABOVE SURFACE MATERIAL) 3" DEPTH MULCH WEED BARRIER COMPACT GRADES ADJACENT TO EDGING TO AVOID SETTLING 12" (305MM) ALUMINUM STAKES TO LOCK INTO PREFORMED LOOPS ON THE EDGING STAKES EDGING DETAIL N.T.S. ISOMETRIC VIEW 7 ROCK MULCH WEED BARRIER FABRIC NEW TOPSOIL EXISTING SUBGRADE18"3"ROCK MULCH N.T.S.8 1/2 (X) (X) PLANT SPACING PER PLAN (X) PLANT SPACING PER PLAN PERENNIAL/GRASS/GROUNDCOVER SPACING N.T.S.5 ORGANIC WOOD MULCH WEED BARRIER FABRIC NEW TOPSOIL EXISTING SUBGRADE18"3"ORGANIC WOOD MULCH N.T.S.9 BOULDER PLACEMENT N.T.S. MULCH AS SPECIFIED COMPACTED SUBGRADE1/3 BOULDER BURIED BELOW GRADE FINISH GRADE 3'-5' MOSS ROCK BOULDERS LOCATED PER PLANS. DO NOT SCAR OR DAMAGE. 10