Loading...
HomeMy WebLinkAbout107 C2.4 Details A I I I M a 3-FT WIDE CONC. APRON ,� o a \ MN TOP BACK OF CURB I TRANSITION CURB DOWN. 1 FACE OF CURB - BLEND TO APRON. \ a a 1 0 ° ° a 3-FT � ° ° a A 2-FT PROPOSED 3-FT WIDE CURB CUT AND a CONCRETE APRON. SEE DETAIL 3/C2.4 a a a I 3-FT WIDE APRON. z4• I GUTTER PAN A 1 1 EDGE OF PAVEMENT ASPHALT PARKING LOT y, 1 PLAN VIEW 1 1 2-FT WIDE �O BLEND STD CURB vM 40.0' 2 11 TO APRON 1/4 LIP M C2,4 1 ASPHALT PARKING LOT v 6% GRADE 10.0' 1 3-FT WIDE CONC. APRON. MATCH SLOPE 1 TO POND BOTTOM. - \ ° 6" MIN. I a I PROPOSED RETENTION POND POND BOTTOM ELEV. = 4735.00' 3" CRUSHED POND BOTTOM AREA = 379 SF GRAVEL BASE MIN. 10-YR, 2-HR STORM: MAX WSE a 4736.25' SECTION A-A POND VOLUME a 785 CF I ��DETAIL C2.4 FLAT SPILL CURB NTS I II �� II SSG��/ I � _ 0 5 11�� 0 5 CONNECT PROPOSED ASPHALT TRAIL �pLi - - ll 1YTAll1�1�Ls TO EX. SIDEWALK ATINTERSECTION OF v C2.4 RETENTION POND PLAT VIEW TSCHA6kE LANE AND VAQUERO PKWY. SCALE (FEET) - y ✓♦ L� 9•.t 10-YR, 2-HR STORM WSE a 4736.25' i POND VOLUME a 785 CF - Ij�- EX. GROUND CONNECT PROPOSED ASPHALT �— — — — _ --TRAIL-TO EX. SIDEWALK = ' 4�% POND BOTTOM ELEV. = 4735.00' 1.25 FINISHED GRADE M10.0' BOTTOM .z WIDTH �I - DETAIL 0 5 10 15 0 100 200 300 P REVISIONS: DETAIL o 1. DETAIL 4/C2.4 HAS BEEN REVISED TO SHOW C2.4 RETENTION POND SECTION VIEW � DETAIL � ASPHALT PATH MAINTAINING 10-FT WIDTH AT SCALE (FEET) si DRIVE APPROACHES. A ASPHALT TRAIL CONNECTIONS NTS SCALE (FEET) NO. REVISIONS DRAWN BY DATE }�7 �7 �7 PROJECT #: 22-002 SHEET 1 AS OUTLINED IN NOTES ABOVE MCG 01/06/2023 ��( �®A��� PARK MAINTENANCE ����.,���(�p 32 DISCOVERY DRIVE DATE: 09/27/2022 BOZEMAN,MT 59718 Civil Engineering CIVIL DETAILS C2s4 CIVIL DETAILS TAILS PHONE(406)582-0221 Geotechnical Engineering ALLIED 1� 7�1�� �,7 ��77 FAx(406)582-5770 Land Surveying EN6REM►NB PROJECT ENGINEER: RSR DRAWN BY: MCG 1LD��.L'.1WJLAA�V�, Ay 1A11A www.alliedengineedng.com am MAINTENANCE y MAINTENANC]EBUILDING DESIGNED BY: MCG REVIEWED BY: RSR JLD .L. A� 1 d °'�„sep„ie`"� CIVIL DETAILS