Loading...
HomeMy WebLinkAboutTrip Generation Memo                                                                                                                                                                                               MEMO 32 Discovery Drive                Bozeman, MT  59718                (406) 582‐0221                 Fax (406) 582‐5770  From: Allied Engineering Services, Inc. Project Name: Gallatin County Regional Park Maintenance Building Project Number: AESI 22-002 Date: September 1, 2022 Re: Trip Generation MEMO DETAILS: The subject property is known as the Gallatin County Regional Park and is defined as Tract 3A-1 of COS 2202B. The proposed improvements involve construction of a park maintenance and storage building with an associated parking lot, located west of the existing Dinosaur Park parking lot. The area proposed for improvement currently consists of a gravel parking/storage area and is accessed from an existing driveway approach off Vaquero Parkway. The existing driveway approach is the proposed access location for the maintenance building. Trip generation estimates for the proposed development are based on Trip Generation 9th Edition – Institute of Transportation Engineers (ITE). The land use closest to the proposed project is for warehousing (Section 150 of ITE manual). The ITE manual provides the following description for warehousing land use, “Warehouses are primarily devoted to the storage of materials, but they may also include office and maintenance areas.” The proposed maintenance building is 1,281 square feet. Table 1 provides a summary of trips generated based on gross floor area of the proposed maintenance building. It should be noted that the proposed gross floor area is at the lower end of the range provided in the ITE Manual for trip estimates. According to the analysis, the proposed development will generate 4 trips on an average weekday. Table 1. Warehousing Trip Generation Based on Gross Floor Area Description Method Average Rate Total Trips % Entering % Exiting Trips Entering Trips Exiting Weekday, A.M. Peak Hour of Generator Gross Floor Area per 1,000 SF (1.281) 0.42 1 65 35 1 0 Weekday, P.M. Peak Hour of Generator Gross Floor Area per 1,000 SF (1.281) 0.45 1 19 81 0 1 Weekday Gross Floor Area per 1,000 SF (1.281) 3.56 4 50 50 2 2