Hello Madline – CILWR are triggered if anticipated water demand for the project exerts a new demand on the municipal
system in excess of 0.25 AF/yr. (Sec. 38.410.130.B BMC). This maintenance facility won’t tip over the trigger threshold,
so no CILWR are needed for this project.
Brian Heaston, PE
Senior Engineer
City of Bozeman - Engineering
20 E. Olive St.
P.O. Box 1230
Bozeman, MT 59771
(406) 582-2280
bheaston@bozeman.net
From: Madeline Good <mgood@alliedengineering.com>
Sent: Thursday, September 1, 2022 9:20 AM
To: Brian Heaston <bheaston@BOZEMAN.NET>
Subject: Regional Park Maintenance Building ‐ CILWR Determination
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the
sender and know the content is safe.
Hi Brian,
I emailed Griffin about this but got an automatic reply that he’s out of office and to contact you for questions regarding
CILWR. I am working on a site plan application for a project at the Gallatin County Regional Park (Tract 3A‐1 of COS
2202B) and was hoping to get a cash‐in‐lieu of water rights determination. The project involves construction of a new
park maintenance building & associated parking off Vaquero Parkway. A concept review application was previously
submitted for the project (application #22104).
The proposed building is 1,281‐sf. I’ve attached the current site plan drawing for reference.
Let me know if there’s any other information I can send. Thanks!
Madeline Good, EI
Staff Engineer
Allied Engineering Services, Inc.
32 Discovery Dr., Bozeman, MT 59718 | Office: 406.582.0221 | Cell: 406.590.8361
2
Email: mgood@alliedengineering.com | Web: www.alliedengineering.com
DUNS: 00‐769‐3724; CAGE: 1GHU7