Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
008 C5.0 Civil Grading Plan
ELEC ELEC ELECUGE UGEUGE UGE UGEUGEUGEUGE 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W SS1.5''W4''SS4''SS4''SS4''SS1''W1''W1''W4''SS4''SS1''W4''SS4''SS1''W4''SS4''SS1''W1''W1''W4''SS4''SSBLDG #38 BLDG #39 BLDG #40 BLDG #41 BLDG #42 BLDG #43 BLDG #44 BLDG #45 BLACKWOOD ROADCANTER AVENUEOSWOSW OSW OSW OSW OSW OSW OSW 1.5''W1.5''WCO CO CO CO CO CO CO W VW V4''SS4''SSCO WINTERTHUR AVENUEW VW V 11 SPACES5 SPACESSS OSW OSW 4''SS4''SSTW: 5022.20 TW: 5022.20 TW: 5022.20TW: 5022.20 TW: 5021.90 TW: 5021.60TW: 5021.40 TW: 5021.20 TW: 5020.55TW: 5020.55 TW: 5020.55 TW: 5020.55 REFER TO SUBDIVISION LANDSCAPING PLANS FOR LINEAR PARK IMPROVEMENTS (TYP.) F.F.E.:5022.40 F.F.E.:5023.50 GRADEBREAKEND SPILL CURB 5018 5018 5019 5020 5019 5018 50205020 50 2 05020502 0 50 1 9 502150205019502 1 50215021501850175019 502 0 5021 5022 50225021502050195018501950205020501950185017 [20.05] [19.77] [19.31] [19.98] [19.34] [19.15][20.06] [19.61] [18.89] BLDG #1 BLDG #2 ELECELECELECELECELECELECCOCO DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DSDS (22.39) (22.39)(22.39) (22.39) (20.70)(20.70)(20.70)(20.70)(20.70)(20.70)(20.70) (22.00) (22.00)(22.10) (22.10) (21.80)(21.80)(21.80)(21.80)(21.80)(21.80)(21.80) (23.49) (23.49) (23.49) (23.49) (23.00) (22.49)(23.49) -4.7%-4.4%-3.9% -2.0% -3. 1 %-3.9%- 2 . 0%-3.9%(21.83 TBC) (20.94)(21.46) (20.43)(20.24)(20.05)(21.47)(21.54)(21.59) -2.8% -3.2% -8.8%-4.6%-2.8%(19.91)(20.54) (22.39) (20.61) STEPPED SIDEWALK (23.49)(21.99 TBC)STEPPED SIDEWALK -8.4% (21.74) (21.71)(21.12) (21.29) (21.74) (21.74) (21.74) (21.74) (21.74) (21.74) LOW POINT (21.74) (21.74) (22.83) (22.83) (22.83)(22.83) (22.83) (22.83) (22.83)(22.83) STEPPED SIDEWALK [21.23] [20.16] [19.21] [21.45] [21.50] [21.62] [21.73] [21.83] [21.93][22.15][22.26][22.39][22.52][22.59][22.72][22.03]-8.7%-9.0%-8.1%-6.5%-5.3%-4.0%-2.6%-1.0%-3.4%-2.8%-2.5%-1.9%-2.6%-5.9%-8.4%-8.9%DROP CURB DROP CURB (21.51)(21.13)(21.29) (20.96) (20.35)(20.16)(19.98) (19.62) (21.39) (22.39) (22.04 TBC)(22.46 TBC) (22.15 SW) (21.54 SW)(22.25 SW) (21.86 SW)(22.35 SW) (23.03 SW)(23.30 SW)(23.27 SW) (22.50 SW) (22.01 SW)(21.50 SW) (20.80)(20.80) (22.39) 1.5' TRANSITION TO FULL HEIGHT CURB 1.5' TRANSITION TO SPILL CURB 1.5' TRANSITION TO FULL HEIGHT CURB 1.5' TRANSITION TO SPILL CURB (22.49)(22.49)(22.49)(21.39)(21.39)(21.39) DOWNSPOUT (TYP.) ROOF DOWNSPOUT TO BE ROUTED TO NORTH EXPOSURE OF BUILDING (TYP.)ROOF DOWNSPOUTS TO BE ROUTED TO NORTH EXPOSURE OF BUILDING (TYP.) 1.5' TRANSITION TO FULL HEIGHT CURB 1.5' TRANSITION TO FULL HEIGHT CURB -3.6% -2.4% 6" STEP ONTO PATIO (21.40 TBC)(21.97 TBC)502150225021 5021 502250 2 2 5021 50225021 5022 5023 50235023 5022 5021 50 2 15020 50 1 9 50 1 8 (21.97 TBC) (21.59 TBC) (21.01 TBC) (21.45 TBC) (22.25 TBC) (21.80 TBC) (21.84 TBC) (22.32 TBC) (21.46 TBC) (21.75 TBC) (21.44 TBC) (21.17 TBC) (20.66 TBC)(21.11 TBC) (19.96 TBC) (20.39 TBC) (22.35 TBC) (21.58)[20.60] 6" STEP FROM PATIO TO SIDEWALK 5' WIDE STEPPED SIDEWALK PROJECT NO: DATE: ENGINEER: REVISIONS DATENO.DESC. SHEET OF 7 22020 FEBRUARY 20, 2023 ELCARBOR HOUSES AT BLACKWOOD GROVESBOZEMAN, MONTANACIVIL SITE PLANGRADING AND DRAINAGE PLAN20'0 40' SCALE 1" = 20' N February 06, 2023 6 C5.0 CONCRETE STEPS FROM BACK OF CURB TO EDGE OF PATIO CONCRETE STEPS FROM BACK OF CURB TO EDGE OF PATIO