HomeMy WebLinkAbout002 Project Narrative
Site Plan Application
The Arbor Houses at Blackwood Groves
Lot 1, Block 14, Phase 2
BLACKWOOD GROVES
Site Plan Application – The Arbor Houses Block 14
April 2023
Page 2 of 4
Table of Contents
NARRATIVE
Section I. – Project Team
Section II – Introduction
Section III – Site Plan
Section IV – Engineering
Section V – Schedule
Section VI – Response to Concept Comments
I. PROJECT TEAM
OWNER & Blackwood Land Fund, LLC
APPLICANT 140 Village Crossing Way, Unit 3B
Bozeman, MT 59715
p: 406.539.6015
PLANNER Intrinsik Architecture, Inc.
111 N. Tracy Avenue,
Bozeman, MT 59715
p: 406.582.8988
ARCHITECT Humphreys & Partners Architects
5339 Alpha Road, Suite 300
Dallas, TX 75240
p: 972.701.9636
ENGINEER White Mountain Engineering
PO Box 888
Belgrade, MT 59714
p: 603.491.0927
LANDSCAPE ARCHITECT Cashman Landscaping
2055 Springhill Road
Bozeman, MT 59718
p: 406.587.3406
BLACKWOOD GROVES
Site Plan Application – The Arbor Houses Block 14
April 2023
Page 3 of 4
II. INTRODUCTION
The Arbor Houses at Blackwood Groves, Block 14 (the Property) is a proposed 20-unit rental
apartment project located on Lot 1, Block 14, Blackwood Groves Subdivision Phase 2 (preliminary plat
application approved June 8, 2021). The 4.59-acre project is on vacant land, zoned Residential
Emphasis Mixed-Use (REMU), and is wholly surrounded by REMU zoning. The Cottages at Blackwood
Groves, Block 14 (City SP #22324), is located north of these proposed buildings, multi-household
residential is planned to the west and south of the project, and mixed-use development is planned to
the east. A linear park runs north/south along the east boundary of the project which connects to
other neighborhoods and Subdivision amenities.
Two (2) buildings with 10 dwelling units each are proposed with this site plan. The units are a mix of
one-, two-, and three-bedroom units ranging from 753 – 1,383 square feet in floor area.
III. SITE PLAN
The proposed buildings will front on Blackwood Road (south) and will have garages for all units
accessed off the private alley on the north side of the building. The site, including all ground-floor
units fronting Blackwood Road, provides direct pedestrian connections to Blackwood Road.
Parking:
Parking for this project is primarily provided by attached garages within the buildings but additional
parking is provided by driveway spaces, off-street spaces, and on-street spaces. Thirty-six (36) parking
spaces are required for this project and 54 spaces are provided. Please refer to the parking
calculations on the Cover Sheet (CS)..
On-Site Residential Open Space:
On-site residential open space is provided by private balconies, ground level private outdoor space,
and shared open space. Please refer to the open space calculations provided on the Cover Sheet (CS).
Only qualifying balconies were included in these calculations. In addition to the on-site open space,
residents will have direct access to the linear public park (Park 11) adjoining the east side of this
project and will have direct access to Park 10 on the west side of the project (across Canter Ave). Park
10 contains an enclosed dog park and Park 11 has various amenities including benches and bike
features.
Parkland:
The Blackwood Groves Subdivision provided parkland dedication in excess of the maximum 12
dwelling units per acre for parkland dedication and/or cash-in-lieu of parkland dedication for Block 14.
No additional parkland dedication or cash/improvements-in-lieu of parkland dedication is required for
this proposal.
BLACKWOOD GROVES
Site Plan Application – The Arbor Houses Block 14
April 2023
Page 4 of 4
IV. ENGINEERING
Utilities:
Water and sanitary sewer services will be stubbed into the site as part of the water/sewer main
extensions associated with the Block 14 Cottage project (SP #22324, ENGING-2349).
Stormwater:
The Stormwater Master Plan for Blackwood Groves is designed to manage the runoff from Block 14.
The site is graded to drain to the surrounding street network where stormwater runoff will be
conveyed to the Subdivision’s stormwater facilities. The Stormwater Design Report is included in the
documents folder of this application.
Fire Access:
Fire hydrants will be located at all intersections surrounding Block 14 and mid-block hydrants are
located on Canter Ave and Winterthur Ave. Ladder trucks will have access to the buildings around the
full perimeter of the site with Blackwood Road, Canter Ave, Winterthur Ave, and the private alley
surrounding the buildings. The buildings will contain fire sprinkler systems.
Solid Waste:
Individual totes for each unit are planned for this development. The totes will be rolled to the private
alley on pick-up day.
Snow Storage:
Snow will be plowed to various landscape areas and landscape islands – please see civil sheet C1.1 for
snow storage locations.
Traffic Impact Study:
The Traffic Impact Study for the Blackwood Groves Subdivision accounted for the 20 residential units
proposed with this development – the TIS requirement was waived by the Engineering Department.
V. SCHEDULE
This project intends to begin construction as soon as site plan approval is received and intends to
break ground in May/June 2023 in order to complete the project in late 2023/early 2024.
VI. Pre-Application Meeting
The pre-application meeting was conducted on November 10, 2022. The Concept Review Waiver is
included in this application. Attendees of this meeting included: Alicia Paz-Soils, Susana Montana,
Scott Mueller, and Diane Tolhurst from the City of Bozeman as well as Matt Hausauer, Grant Syth, and
David Gordon from the design team.