Loading...
HomeMy WebLinkAbout036 Electrical Site PlanW S S S CP CP CP RIM=4815.84 INV-W-(6" VCP)=4804.34 RIM=4808.96 INV-E-(6" VCP)=4800.76 T FO RI SE RRISE RCO BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOL BOLBOL CO RD CO RD 1 2 3 4 A B E201 1 E301 1 E401 1 PL2 PL2 PL2 PL1 PL3 E002 3 TYPICAL, FOR PL1 1"C-(3)CAT6 P1-2,4 P1 1 1"C-(1)CAT6 1"C-(1)CAT6 E501 1 2"C.O. (COMM) 2"C.O. (SECURITY) E003 1COMM PULLBOX (1)ELECTRICAL FEEDER CONDUIT. SEE ONE-LINE. (1)1-1/2"C -3#6, #10G CU FROM RAPID SHUT DOWN DISCONNECT TO NWE DISCONNECT (1)1-1/2"C -3#6, #10G CU FROM NWE DISCONNECT TO PANEL P1 2 2 2 LV L V LV E302 1 EXISTING SNOWLOAD BUILDING P1-30 1 MARQUEE SIGN LIGHTING CONTACTOR CABINET EXISTING SNOWLOAD BUILDING METER CENTER LOCATED IN PARKING GARAGE IN LOWER LEVEL. SEE E004 1 E003 2POWER PULLBOX LV LV LV 3 E004 1 PROVIDE HEAVY DUTY, LOCKABLE NEMA 3R, 3-POLE, 250VAC NON-FUSED BUILDING DISCONNECT. PROVIDE PERMANENT PLACARD LABEL LV EV CHARGER STUB UP SPARE ON SIDE WALK AND CAP 1"C-(2)#8, #10G CU 1"C.O. (SPARE) PROVIDE HEAVY DUTY, LOCKABLE NEMA 3R, 2-POLE, 250VAC NON-FUSED DISCONNECT (SOLAR PV RAPID SHUTDOWN). ROUTE CONDUITS TO ROOF E500 1 E500 1 PROVIDE HEAVY DUTY, LOCKABLE NEMA 3R, 2- POLE, 250VAC FUSED DISCONNECT ADJACENT TO NWE METER (SOLAR PV DISCONNECT)E500 1 TRENCH ACROSS EXISTING ALLEYWAY. COORDINATE WITH NWE REQUIREMENTS PRIOR TO COMMENCEMENT OF WORK 3 4 5 PL4 GENERAL NOTES A. COMPLY WITH LATEST ADOPTED NEC AND APPLICABLE CODES/STANDARDS. B. SHARED NEUTRALS ARE NOT ALLOWED FOR SINGLE PHASE BRANCH CIRCUITS. C. PRIOR TO BID, CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY ALL EXISTING CONDITIONS ASSOCIATED WITH DEMOLITION; CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS AS REQUIRED TO MAINTAIN FUNCTIONALITY OF ALL DOWNSTREAM EQUIPMENT, DEVICES, FIXTURES, ETC. THAT ARE TO REMAIN. D. EXISTING DEVICES AND EQUIPMENT SHOWN IS BASED ON THE BEST INFORMATION AVIALABLE. REVISIONS 1/27/2023 4:02:46 PM ELECTRICAL SITE PLAN E100 08.11.2022 © 2022 | ALL RIGHTS RESERVED SITE REVIEW SET DESIGNED BY | MAEHL DRAWN BY | GALLI DOWNTOWN BOZEMANSTOCKMAN BANK801 W Main Street | Project# SBDBZN_200 | L:\StockmanBank\SBDBZN_200 PROJECT# | SBDBZN_200 #KEYNOTES 1" = 30'-0"E100 1 SITE PLAN - ELECTRICAL 1. ROUTE CIRCUIT TO PANEL VIA CONTACTOR CONTROLS IN MECHANICAL ROOM. REFER TO DRAWING E201 AND DETAIL 3, E003 FOR ADDITIONAL INFORMATION. 2. PROVIDE POE CAMERA MOUNTED ON LIGHTING POLE. PROVIDE MOUNTING HARDWARE AS REQUIRED. 3. PROVIDE PULL ROPE IN EMPTY CONDUIT. 4. ROUTE TO SNOWLOAD BUILDING DMARC LOCATION 5. ROUTE TO STOCKMAN SECURITY SYSTEM RACK IN SNOWLOAD BUILDING.